Velarion Records
Free: one email when NPDES FLR05G085 changes. Unsubscribe any time.

NPDES FLR05G085 · Clean Water Act

GULF HARBOR MARINA, Nokomis, FL: NPDES FLR05G085 discharge permit, effluent exceedances, inspections, penalties

GULF HARBOR MARINA, Nokomis, Florida: General permit coverage FLR05G085, held by Gulf Harbor Marina LLC; Industrial stormwater; Effective; issued January 23, 2021, term to January 22, 2026, by Florida Department of Environmental Protection; Marinas.

  • Iron, total recoverable: 2 limits, 3 violations of any kind.
  • Zinc, total recoverable: 2 limits, 3 violations of any kind.
  • Aluminum, total recoverable: 2 limits, 3 violations of any kind.
  • Lead, total recoverable: 2 limits, 3 violations of any kind.
  • February 2, 2026: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • February 2, 2026: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • February 2, 2026: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • February 2, 2026: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • February 2, 2026: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • February 2, 2026: Evaluation (S).
  • September 7, 2023: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
  • September 7, 2023: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • September 7, 2023: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • September 7, 2023: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • September 7, 2023: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • September 6, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • September 6, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • September 6, 2019: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,594 were issued before FLR05G085.

Coverages issued nearest FLR05G085

GULF HARBOR MARINA among its neighbors

80 discharge permits are in the Venice Inlet Frontal subwatershed (HUC 031002010202); FLR05G085 is one. Its county: 538, 9 major; FLR05G085 is minor permit.

Other permits in the Venice Inlet Frontal subwatershed (HUC 031002010202)

What stands out

  • Its term runs 4 years and 364 days, January 23, 2021 to January 22, 2026; the term ended 265 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is single-event violation and inspection on February 2, 2026, 254 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 5 single-event violations, 1 inspection.
  • EPA's file dates 14 events for it, from 2019 to 2026; the busiest year is 2026 with 6.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityGULF HARBOR MARINA
PermitteeGulf Harbor Marina LLC
NPDES IDFLR05G085
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedJanuary 23, 2021
ExpiresJanuary 22, 2026
AgencyFlorida Department of Environmental Protection
AddressNokomis, FL 34275
Receiving water impaired303(D) Listed
SubwatershedVenice Inlet Frontal (HUC 031002010202)
NAICS713930 – Marinas
SIC4493 – Marinas
Other EPA IDs (FRS)RCRA handler FLD984208561

NPDES FLR05G085: effluent limits and exceedances

GULF HARBOR MARINA (NPDES FLR05G085): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Iron, total recoverable230
Zinc, total recoverable230
Aluminum, total recoverable230
Lead, total recoverable230

NPDES FLR05G085: inspections, violations and enforcement

NPDES FLR05G085: 13 single-event violations

DateWhat EPA recordedAgency
February 2, 2026WW Storm Water Non-Construction - Failure to MonitorST6
February 2, 2026WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
February 2, 2026WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
February 2, 2026WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
February 2, 2026WW Storm Water Non-Construction - Failure to Maintain RecordsST6
September 7, 2023WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6
September 7, 2023WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
September 7, 2023WW Storm Water Non-Construction - Failure to Maintain RecordsST6
September 7, 2023WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
September 7, 2023WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
September 6, 2019WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
September 6, 2019WW Storm Water Non-Construction - Failure to MonitorST6
September 6, 2019WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6

NPDES FLR05G085: 1 inspection

DateWhat EPA recordedAgency
February 2, 2026EvaluationS

NPDES FLR05G085 (GULF HARBOR MARINA): no formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05G085

NPDES FLR05G085: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05G085

NPDES FLR05G085: 4 pollutant rows, 14 dated events; ICIS-NPDES download, loaded October 14, 2026.