Velarion Records
Free: one email when NPDES FLR05G804 changes. Unsubscribe any time.

NPDES FLR05G804 · Clean Water Act

ARLINGTON MARINA INC, Jacksonville, FL: NPDES FLR05G804 discharge permit, effluent exceedances, inspections, penalties

ARLINGTON MARINA INC, Jacksonville, Florida: General permit coverage FLR05G804, held by Arlington Marina; Industrial stormwater; Administratively continued; issued February 22, 2019, term to February 21, 2024, by Florida Department of Environmental Protection.

  • Iron, total recoverable: 4 limits, 5 violations of any kind.
  • Zinc, total recoverable: 4 limits, 5 violations of any kind.
  • Aluminum, total recoverable: 4 limits, 5 violations of any kind.
  • Lead, total recoverable: 4 limits, 5 violations of any kind.
  • August 17, 2026: Notice of Noncompliance Issued (State).
  • July 30, 2026: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • July 30, 2026: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • July 30, 2026: Evaluation (S).
  • February 21, 2024: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • March 3, 2022: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • March 3, 2022: WW Storm Water Non-Construction - Failure to submit required report (non-DMR) (ST6).
  • December 9, 2020: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • December 9, 2020: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • December 9, 2020: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • June 12, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • June 12, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • June 12, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,105 were issued before FLR05G804.

Coverages issued nearest FLR05G804

ARLINGTON MARINA INC among its neighbors

150 discharge permits are in the Arlington River subwatershed (HUC 030801031503); FLR05G804 is one. Its county: 1,042, 17 major; FLR05G804 is minor permit.

Other permits in the Arlington River subwatershed (HUC 030801031503)

What stands out

  • Its term runs 4 years and 364 days, February 22, 2019 to February 21, 2024; the term ended 937 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an informal enforcement action on August 17, 2026, 29 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 2 single-event violations, 1 inspection, 1 informal enforcement action.
  • EPA's file dates 13 events for it, from 2019 to 2026; the busiest year is 2026 with 4.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityARLINGTON MARINA INC
PermitteeArlington Marina
NPDES IDFLR05G804
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedFebruary 22, 2019
ExpiresFebruary 21, 2024
AgencyFlorida Department of Environmental Protection
AddressJacksonville, FL 32211
Receiving water impaired303(D) Listed
SubwatershedArlington River (HUC 030801031503)
Other EPA IDs (FRS)RCRA handler FLR000150128

NPDES FLR05G804: effluent limits and exceedances

ARLINGTON MARINA INC (NPDES FLR05G804): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Iron, total recoverable450
Zinc, total recoverable450
Aluminum, total recoverable450
Lead, total recoverable450

NPDES FLR05G804: inspections, violations and enforcement

NPDES FLR05G804: 11 single-event violations

DateWhat EPA recordedAgency
July 30, 2026WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
July 30, 2026WW Storm Water Non-Construction - Failure to Maintain RecordsST6
February 21, 2024WW Storm Water Non-Construction - Failure to Maintain RecordsST6
March 3, 2022WW Storm Water Non-Construction - Failure to Maintain RecordsST6
March 3, 2022WW Storm Water Non-Construction - Failure to submit required report (non-DMR)ST6
December 9, 2020WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
December 9, 2020WW Storm Water Non-Construction - Failure to Maintain RecordsST6
December 9, 2020WW Storm Water Non-Construction - Failure to MonitorST6
June 12, 2019WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
June 12, 2019WW Storm Water Non-Construction - Failure to Maintain RecordsST6
June 12, 2019WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6

NPDES FLR05G804: 1 inspection

DateWhat EPA recordedAgency
July 30, 2026EvaluationS

NPDES FLR05G804: 1 informal enforcement action

DateWhat EPA recordedAgency
August 17, 2026Notice of Noncompliance IssuedState

NPDES FLR05G804 (ARLINGTON MARINA INC): no formal enforcement action on file.

Watch NPDES FLR05G804

NPDES FLR05G804: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05G804

NPDES FLR05G804: 4 pollutant rows, 13 dated events; ICIS-NPDES download, loaded September 15, 2026.