NPDES FLR05H098 · Clean Water Act
RANGER CONSTRUCTION INDUSTRIES, INC. - POMPANO ASPAHLT PLANT, Pompano Beach, FL: NPDES FLR05H098 discharge permit, effluent exceedances, inspections, penalties
RANGER CONSTRUCTION INDUSTRIES, INC. - POMPANO ASPAHLT PLANT, Pompano Beach, Florida: General permit coverage FLR05H098, held by Ranger Construction Industries Inc; Industrial stormwater; Administratively continued; issued March 18, 2016, term to March 17, 2021, by Florida Department of Environmental Protection; Asphalt Paving Mixture and Block Manufacturing.
No violation or effluent exceedance is on file for any of the 1 pollutants listed for NPDES FLR05H098.
- Solids, total suspended: 2 limits.
- December 18, 2020: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- December 18, 2020: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- December 18, 2020: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,147 were issued before FLR05H098. Ranger Construction Industries Inc holds 13 permits in Florida.
Other permits held by Ranger Construction Industries Inc
- RANGER CONSTRUCTION INDUSTRIES, INC. - WINTER GARDEN ASPHALT, Winter Garden: FLR05B797, issued 2016-03-26
- RANGER CONSTRUCTION IND INC-GRANT ASPHALT PLANT, Grant: FLR05C572, issued 2017-01-12
- RANGER CONSTRUCTION IND INC - DEBARY ASPLALT, Debary: FLR05C573, issued 2016-02-15
- RANGER CONSTRUCTION INDS INC FT PIERCE ASPHALT, Fort Pierce: FLR05E185, issued 2021-03-19
- RANGER CONSTRUCTION IND INC WEST PALM ASPHALT PLANT, Royal Palm Beach: FLR05E186, issued 2021-03-25
- SR 559 T1802, Polk City: FLR10UT33, issued 2021-10-18
- SR 500 T5732, Mount Dora: FLR10UX15, issued 2022-01-08
- CR 455 RAY GOODGAME PKWY PH 1 NB LANES EXTENSION, Clermont: FLR10WF06, issued 2023-09-16
- POMPANO BEACH AIRPARK, Pompano Beach: FLR10WN54, issued 2024-01-25
- CATHERINE DRIVE ROADWAY IMPROVEMENTS, Delray Beach: FLR10WS32, issued 2024-04-04
Coverages issued nearest FLR05H098
- 2016-03-14: UPS ORLANDO TCI, Orlando: FLR05B835, held by United Parcel Service Inc
- 2016-03-14: UPS PALM HARBOR, Clearwater: FLR05B837, held by United Parcel Service Inc
- 2016-03-14: SKELETON KEY MARINA, Hudson: FLR05H934, held by Skeleton Key Marina
- 2016-03-17: GCP APPLIED TECHNOLOGIES INC, Zellwood: FLR05H935, held by GCP Applied Technologies Inc
- 2016-03-18: JACKSONVILLE WASTE CONTROL, Jacksonville: FLR05B915, held by Waste Management of Inc. Florida
- 2016-03-20: 63RD AVENUE MRF, Bradenton: FLR05G081, held by WCA of Florida, LLC
- 2016-03-21: NWNA HOME & OFFICE DELIVERY (HOD) WAREHOUSE, Tamarac: FLR05H940, held by Nestle Water North America
- 2016-03-24: NWNA HOME & OFFICE DELIVERY (HOD) WAREHOUSE, Casselberry: FLR05H943, held by Nestle Waters North America, Inc.
- 2016-03-26: RANGER CONSTRUCTION INDUSTRIES, INC. - WINTER GARDEN ASPHALT, Winter Garden: FLR05B797, held by Ranger Construction Industries Inc
- 2016-03-31: CARLISLE INTERCONNECT TECHNOLOGIES, Saint Augustine: FLRNEE953, held by Carlisle Interconnect Technologies
RANGER CONSTRUCTION INDUSTRIES, INC. - POMPANO ASPAHLT PLANT among its neighbors
86 discharge permits are in the Hillsborough Canal subwatershed (HUC 030902061100); FLR05H098 is one. Its county: 936, 40 major; FLR05H098 is minor permit.
Other permits in the Hillsborough Canal subwatershed (HUC 030902061100)
- 10468 EL CABALLO COURT RESIDENCE, Delray Beach: FLR10VE93, minor, term to 2027-05-19
- 22-012 MILITARY TRAIL DRAINAGE, Pompano Beach: FLR20GD87, minor, term to 2028-03-31
- 4211 NW 74TH STREET, Unincorporated: FLR10XE94, minor, term to 2029-10-24
- 4425 NW 71ST STREET, Unincorporated: FLR10XL04, minor, term to 2030-01-30
- 7900 NW 82 TER, Parkland: FLR10YE75, minor, term to 2031-01-29
- 8050 NW 82 TER, Parkland: FLR10YE76, minor, term to 2031-02-06
- AMAZON.COM SERVICES LLC - DVB4, Deerfield Beach: FLR05I601, minor, term to 2026-01-27
- ARGOS USA - DEERFIELD BEACH PLANT, Deerfield Beach: FLG110602, minor, term to 2023-05-08
- BOCA CENTER RESIDENTIAL, Boca Raton: FLR20IZ24, minor, term to 2031-02-11
- BOCA DUNES PUD, Unincorporated: FLR20AL96, minor, term to 2020-12-16
What stands out
- Its term runs 4 years and 364 days, March 18, 2016 to March 17, 2021; the term ended 2,037 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on December 18, 2020, 2,126 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 3 events for it, all in 2020.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | RANGER CONSTRUCTION INDUSTRIES, INC. - POMPANO ASPAHLT PLANT |
|---|---|
| Permittee | Ranger Construction Industries Inc |
| NPDES ID | FLR05H098 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | March 18, 2016 |
| Expires | March 17, 2021 |
| Agency | Florida Department of Environmental Protection |
| Address | Pompano Beach, FL 33073 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Hillsborough Canal (HUC 030902061100) |
| NAICS | 324121 – Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951 – Asphalt Paving Mixtures And Blocks |
NPDES FLR05H098: effluent limits and exceedances
RANGER CONSTRUCTION INDUSTRIES, INC. - POMPANO ASPAHLT PLANT (NPDES FLR05H098): 1 pollutants on file, 1 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 2 | 0 | 0 |
NPDES FLR05H098: inspections, violations and enforcement
NPDES FLR05H098: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| December 18, 2020 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| December 18, 2020 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| December 18, 2020 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES FLR05H098 (RANGER CONSTRUCTION INDUSTRIES, INC. - POMPANO ASPAHLT PLANT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05H098
NPDES FLR05H098: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05H098
NPDES FLR05H098: 1 pollutant rows, 3 dated events; ICIS-NPDES download, loaded October 14, 2026.