NPDES FLR05H143 · Clean Water Act
HOLIDAY HARBOR MARINA, INC., Pensacola, FL: NPDES FLR05H143 discharge permit, effluent exceedances, inspections, penalties
HOLIDAY HARBOR MARINA, INC., Pensacola, Florida: General permit coverage FLR05H143, held by Holiday Harbor Marina, Inc.; Industrial stormwater; Effective; issued July 22, 2021, term to July 21, 2026, by Florida Department of Environmental Protection; Marinas.
No violation or effluent exceedance is on file for any of the 4 pollutants listed for NPDES FLR05H143.
- Iron, total recoverable: 1 limit.
- Zinc, total recoverable: 1 limit.
- Aluminum, total recoverable: 1 limit.
- Lead, total recoverable: 1 limit.
- January 15, 2021: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- January 15, 2021: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- June 26, 2019: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,967 were issued before FLR05H143.
Coverages issued nearest FLR05H143
- 2021-07-19: LAND O LAKES WASTEWATER TREATMENT FACILITY, Land O Lakes: FLR05H053, held by Pasco Co Utilities
- 2021-07-19: WASTE CONNECTIONS FLORIDA, INC., Fort Myers: FLR05H973, held by Waste Connections of Florida, Inc.
- 2021-07-19: LAKE COUNTY HAULING, Okahumpka: FLR05H977, held by Waste Connections of Florida, Inc.
- 2021-07-22: FEDEX EXPRESS-MCFA, Tampa: FLR05A653, held by FedEx Express
- 2021-07-22: AIR PRODUCTS ORLANDO ASU FACILITY, Orlando: FLR05B178, held by Air Products & Chemicals Inc
- 2021-07-23: RIDGE LUMBER & TREATING INC, Lakeland: FLR05A851, held by Charles F. Poston
- 2021-07-23: NAS WHITING FIELD, Milton: FLR05A954, held by Naval Air Station Whiting Field
- 2021-07-23: LKQ HEAVY TRUCK - TAMPA, Tampa: FLR05B615, held by LKQ Southeast Inc
- 2021-07-24: FEDEX EXPRESS-FLLR, Ft Lauderdale: FLR05A422, held by FedEx Express
- 2021-07-24: FEDEX EXPRESS-RSWR, Fort Myers: FLR05A495, held by FedEx Express
HOLIDAY HARBOR MARINA, INC. among its neighbors
88 discharge permits are in the Perdido Pass-Frontal Gulf of Mexico subwatershed (HUC 031401070204); FLR05H143 is one. Its county: 333, 8 major; FLR05H143 is minor permit.
Other permits in the Perdido Pass-Frontal Gulf of Mexico subwatershed (HUC 031401070204)
- ABACO ORANGE BEACH, Orange Beach: ALR10C3QC, minor, term to 2026-03-31
- ABBEY ROAD, Orange Beach: ALR10C5TL, minor, term to 2026-03-31
- ABC NEW WAREHOUSE, Orange Beach: ALR10C7CU, minor, term to 2026-03-31
- ABERDEEN VILLAS, Gulf Shores: ALR10BH02, minor, term to 2026-03-31
- AMBER ISLE, Orange Beach: ALR108840, minor, term to 2016-03-31
- ATLAS CONDOMINIUM, Orange Beach: ALR10C1ZF, minor, term to 2026-03-31
- AU-GULF COAST ENGINEERING RESEARCH STATION, Orange Beach: ALR10C6W6, minor, term to 2026-03-31
- BEACH WALKING DISTRICT IMPROVEMENTS, Gulf Shores: ALR10C037, minor, term to 2021-03-31
- BINGER, Orange Beach: ALR10C6W1, minor, term to 2026-03-31
- BP-ST-002-180-016 PS1873, Orange Beach: ALR10BEYA, minor, term to 2021-03-31
What stands out
- Its term runs 4 years and 364 days, July 22, 2021 to July 21, 2026; the term ended 85 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on January 15, 2021, 2,098 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 9 events for it, from 2019 to 2021; the busiest year is 2019 with 7.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | HOLIDAY HARBOR MARINA, INC. |
|---|---|
| Permittee | Holiday Harbor Marina, Inc. |
| NPDES ID | FLR05H143 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | July 22, 2021 |
| Expires | July 21, 2026 |
| Agency | Florida Department of Environmental Protection |
| Address | Pensacola, FL 32507 |
| Subwatershed | Perdido Pass-Frontal Gulf of Mexico (HUC 031401070204) |
| NAICS | 713930 – Marinas |
| SIC | 4493 – Marinas |
NPDES FLR05H143: effluent limits and exceedances
HOLIDAY HARBOR MARINA, INC. (NPDES FLR05H143): 4 pollutants on file, 4 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Iron, total recoverable | 1 | 0 | 0 | ||
| Zinc, total recoverable | 1 | 0 | 0 | ||
| Aluminum, total recoverable | 1 | 0 | 0 | ||
| Lead, total recoverable | 1 | 0 | 0 |
NPDES FLR05H143: inspections, violations and enforcement
NPDES FLR05H143: 9 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| January 15, 2021 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| January 15, 2021 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| June 26, 2019 | WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES FLR05H143 (HOLIDAY HARBOR MARINA, INC.): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05H143
NPDES FLR05H143: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05H143
NPDES FLR05H143: 4 pollutant rows, 9 dated events; ICIS-NPDES download, loaded October 14, 2026.