NPDES FLR05H143 · Clean Water Act

HOLIDAY HARBOR MARINA, INC., Pensacola, FL: NPDES FLR05H143 discharge permit, effluent exceedances, inspections, penalties

HOLIDAY HARBOR MARINA, INC., Pensacola, Florida: General permit coverage FLR05H143, held by Holiday Harbor Marina, Inc.; Industrial stormwater; Effective; issued July 22, 2021, term to July 21, 2026, by Florida Department of Environmental Protection; Marinas.

No violation or effluent exceedance is on file for any of the 4 pollutants listed for NPDES FLR05H143.

  • Iron, total recoverable: 1 limit.
  • Zinc, total recoverable: 1 limit.
  • Aluminum, total recoverable: 1 limit.
  • Lead, total recoverable: 1 limit.
  • January 15, 2021: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • January 15, 2021: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • June 26, 2019: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,967 were issued before FLR05H143.

Coverages issued nearest FLR05H143

HOLIDAY HARBOR MARINA, INC. among its neighbors

88 discharge permits are in the Perdido Pass-Frontal Gulf of Mexico subwatershed (HUC 031401070204); FLR05H143 is one. Its county: 333, 8 major; FLR05H143 is minor permit.

Other permits in the Perdido Pass-Frontal Gulf of Mexico subwatershed (HUC 031401070204)

What stands out

  • Its term runs 4 years and 364 days, July 22, 2021 to July 21, 2026; the term ended 85 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is a single-event violation on January 15, 2021, 2,098 days before EPA's file was loaded.
  • No dated event in the 365 days to October 14, 2026.
  • EPA's file dates 9 events for it, from 2019 to 2021; the busiest year is 2019 with 7.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityHOLIDAY HARBOR MARINA, INC.
PermitteeHoliday Harbor Marina, Inc.
NPDES IDFLR05H143
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedJuly 22, 2021
ExpiresJuly 21, 2026
AgencyFlorida Department of Environmental Protection
AddressPensacola, FL 32507
SubwatershedPerdido Pass-Frontal Gulf of Mexico (HUC 031401070204)
NAICS713930 – Marinas
SIC4493 – Marinas

NPDES FLR05H143: effluent limits and exceedances

HOLIDAY HARBOR MARINA, INC. (NPDES FLR05H143): 4 pollutants on file, 4 limited; 0 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Iron, total recoverable100
Zinc, total recoverable100
Aluminum, total recoverable100
Lead, total recoverable100

NPDES FLR05H143: inspections, violations and enforcement

NPDES FLR05H143: 9 single-event violations

DateWhat EPA recordedAgency
January 15, 2021WW Storm Water Non-Construction - Failure to Maintain RecordsST6
January 15, 2021WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
June 26, 2019WW Storm Water Non-Construction - Failure to MonitorST6
June 26, 2019WW Storm Water Non-Construction - Failure to Maintain RecordsST6
June 26, 2019WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
June 26, 2019WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
June 26, 2019WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
June 26, 2019WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
June 26, 2019WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6

NPDES FLR05H143 (HOLIDAY HARBOR MARINA, INC.): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05H143

NPDES FLR05H143: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05H143

NPDES FLR05H143: 4 pollutant rows, 9 dated events; ICIS-NPDES download, loaded October 14, 2026.