NPDES FLR05H179 · Clean Water Act

FECR CITY POINT YARD, Cocoa, FL: NPDES FLR05H179 discharge permit, effluent exceedances, inspections, penalties

FECR CITY POINT YARD, Cocoa, Florida: General permit coverage FLR05H179, held by Florida East Coast Railway LLC; Industrial stormwater; Effective; issued July 10, 2021, term to July 9, 2026, by Florida Department of Environmental Protection.

  • January 19, 2024: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • January 19, 2024: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
  • January 19, 2024: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • January 19, 2024: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • January 19, 2024: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • January 19, 2024: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • January 19, 2024: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,943 were issued before FLR05H179. Florida East Coast Railway LLC holds 8 permits in Florida.

Other permits held by Florida East Coast Railway LLC

Coverages issued nearest FLR05H179

FECR CITY POINT YARD among its neighbors

36 discharge permits are in the Lake Wilson subwatershed (HUC 030801010802); FLR05H179 is one. Its county: 713, 5 major; FLR05H179 is minor permit.

Other permits in the Lake Wilson subwatershed (HUC 030801010802)

What stands out

  • Its term runs 4 years and 364 days, July 10, 2021 to July 9, 2026; the term ended 68 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
  • Its newest dated event on file is a single-event violation on January 19, 2024, 970 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 7 events for it, all in 2024.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityFECR CITY POINT YARD
PermitteeFlorida East Coast Railway LLC
NPDES IDFLR05H179
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedJuly 10, 2021
ExpiresJuly 9, 2026
AgencyFlorida Department of Environmental Protection
AddressCocoa, FL 32926
SubwatershedLake Wilson (HUC 030801010802)

NPDES FLR05H179: effluent limits and exceedances

FECR CITY POINT YARD (NPDES FLR05H179): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES FLR05H179: no pollutant row on file.

NPDES FLR05H179: inspections, violations and enforcement

NPDES FLR05H179: 7 single-event violations

DateWhat EPA recordedAgency
January 19, 2024WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
January 19, 2024WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6
January 19, 2024WW Storm Water Non-Construction - Failure to MonitorST6
January 19, 2024WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
January 19, 2024WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
January 19, 2024WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
January 19, 2024WW Storm Water Non-Construction - Failure to Maintain RecordsST6

NPDES FLR05H179 (FECR CITY POINT YARD): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05H179

NPDES FLR05H179: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05H179

NPDES FLR05H179: 0 pollutant rows, 7 dated events; ICIS-NPDES download, loaded September 15, 2026.