Velarion Records
Free: one email when NPDES FLR05H731 changes. Unsubscribe any time.

NPDES FLR05H731 · Clean Water Act

FREEDOM METAL FINISHING INC, Clearwater, FL: NPDES FLR05H731 discharge permit, effluent exceedances, inspections, penalties

FREEDOM METAL FINISHING INC, Clearwater, Florida: General permit coverage FLR05H731, held by Freedom Metal Finishing Inc; Industrial stormwater; Administratively continued; issued September 12, 2014, term to September 11, 2019, by Florida Department of Environmental Protection.

  • Nitrite + Nitrate total [as N]: 1 limit, 2 violations of any kind.
  • Zinc, total recoverable: 1 limit, 2 violations of any kind.
  • June 29, 2022: WW Storm Water Non-Construction - Failure to submit required report (non-DMR) (ST6).
  • September 4, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • September 4, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • September 4, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • September 4, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • April 25, 2019: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • April 25, 2019: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • April 25, 2019: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • April 25, 2019: WW Storm Water Non-Construction - Failure to Monitor (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 973 were issued before FLR05H731.

Coverages issued nearest FLR05H731

FREEDOM METAL FINISHING INC among its neighbors

104 discharge permits are in the Cross Bayou Canal-Grassy Creek Frontal subwatershed (HUC 031002060602); FLR05H731 is one. Its county: 724, 34 major; FLR05H731 is minor permit.

Other permits in the Cross Bayou Canal-Grassy Creek Frontal subwatershed (HUC 031002060602)

What stands out

  • Its term runs 4 years and 364 days, September 12, 2014 to September 11, 2019; the term ended 2,561 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on June 29, 2022, 1,539 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 9 events for it, from 2019 to 2022; the busiest year is 2019 with 8.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityFREEDOM METAL FINISHING INC
PermitteeFreedom Metal Finishing Inc
NPDES IDFLR05H731
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedSeptember 12, 2014
ExpiresSeptember 11, 2019
AgencyFlorida Department of Environmental Protection
AddressClearwater, FL 33760
Receiving water impaired303(D) Listed
SubwatershedCross Bayou Canal-Grassy Creek Frontal (HUC 031002060602)
Other EPA IDs (FRS)RCRA handler FLD000646422; ICIS-AIR source FL0000001210300306

NPDES FLR05H731: effluent limits and exceedances

FREEDOM METAL FINISHING INC (NPDES FLR05H731): 2 pollutants on file, 2 limited; 2 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Nitrite + Nitrate total [as N]120
Zinc, total recoverable120

NPDES FLR05H731: inspections, violations and enforcement

NPDES FLR05H731: 9 single-event violations

DateWhat EPA recordedAgency
June 29, 2022WW Storm Water Non-Construction - Failure to submit required report (non-DMR)ST6
September 4, 2019WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
September 4, 2019WW Storm Water Non-Construction - Failure to MonitorST6
September 4, 2019WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
September 4, 2019WW Storm Water Non-Construction - Failure to Maintain RecordsST6
April 25, 2019WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
April 25, 2019WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
April 25, 2019WW Storm Water Non-Construction - Failure to Maintain RecordsST6
April 25, 2019WW Storm Water Non-Construction - Failure to MonitorST6

NPDES FLR05H731 (FREEDOM METAL FINISHING INC): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05H731

NPDES FLR05H731: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05H731

NPDES FLR05H731: 2 pollutant rows, 9 dated events; ICIS-NPDES download, loaded September 15, 2026.