NPDES FLR05H897 · Clean Water Act
AJAX PAVING INDUSTRIES OF FLORIDA, LLC (AJAX MATERIALS), Nokomis, FL: NPDES FLR05H897 discharge permit, effluent exceedances, inspections, penalties
AJAX PAVING INDUSTRIES OF FLORIDA, LLC (AJAX MATERIALS), Nokomis, Florida: General permit coverage FLR05H897, held by Ajax Paving Industries of Florida LLC; Industrial stormwater; Administratively continued; issued September 29, 2019, term to September 28, 2024, by Florida Department of Environmental Protection; Other Chemical and Fertilizer Mineral Mining.
No violation or effluent exceedance is on file for any of the 7 pollutants listed for NPDES FLR05H897.
- Solids, total suspended: 6 limits.
- Iron, total recoverable: 6 limits.
- Zinc, total recoverable: 6 limits.
- Aluminum, total recoverable: 6 limits.
- Lead, total recoverable: 6 limits.
- Copper, total recoverable: 6 limits.
- Chemical Oxygen Demand [COD]: 6 limits.
- March 1, 2018: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- March 1, 2018: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
- March 1, 2018: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- March 1, 2018: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,260 were issued before FLR05H897. Ajax Paving Industries of Florida LLC holds 18 permits in Florida.
Other permits held by Ajax Paving Industries of Florida LLC
- AJAX PAVING INDUSTRIES OF FLORIDA, LLC (PLANT 4), Fort Myers: FLR05G007, issued 2019-10-05
- AJAX PAVING INDUSTRIES OF FLORIDA, LLC, Odessa: FLR05G980, issued 2021-03-18
- AJAX PAVING INDUSTRIES OF FLORIDA, LLC (PLANT #6), Tampa: FLR05G981, issued 2019-09-28
- AJAX PAVING INDUSTRIES, LLC, Punta Gorda: FLR05G983, issued 2020-09-25
- AJAX PAVING INDUSTRIES OF FLORIDA LLC PLANT 3, Palmetto: FLR05G984, issued 2019-10-19
- AJAX PAVING-LARGO, PLANT 7, Largo: FLR05H343, issued 2017-04-30
- AJAX PAVING INDUSTRIES OF FLORIDA LLC(PLANT#8), Lake Wales: FLR05I652, issued 2021-05-29
- STATE ROAD 681, Nokomis: FLR10WA17, issued 2023-06-15
- E7R36 - SR 60 AND CR 39, Plant City: FLR10XQ82, issued 2025-05-11
- TOLEDO BLADE @ I-75, E1X04, North Port: FLR10YH54, issued 2026-03-02
Coverages issued nearest FLR05H897
- 2019-09-19: PASCO HAULING EAST FACILITY, Dade City: FLR05H734, held by Waste Connections of Florida, Inc.
- 2019-09-20: PORT CONSOLIDATED INC, Fort Myers: FLR05H733, held by Port Consolidated Inc
- 2019-09-24: UNION CORRUGATING, Ocala: FLR05F796, held by Union Corrugating Company
- 2019-09-28: AJAX PAVING INDUSTRIES OF FLORIDA, LLC (PLANT #6), Tampa: FLR05G981, held by Ajax Paving Industries of Florida LLC
- 2019-09-28: AJAX PAVING INDUSTRIES OF FLORIDA LLC (PLANT #1), Nokomis: FLR05G982, held by AJAX Paving Industries of FL LLC
- 2019-09-30: WM - FORT WALTON BEACH HAULING & MRF, Fort Walton Beach: FLR05G923, held by Waste Management Inc of Florida
- 2019-10-04: USA RECYCLING CENTER, Fort Myers: FLR05H738, held by Waste Connections of Florida, Inc
- 2019-10-04: EASTERN SHIPBUILDING GROUP,INC. P.S.J. FACILITY, Port Saint Joe: FLR05I431, held by Eastern Shipbuilding Group, Inc.
- 2019-10-05: AJAX PAVING INDUSTRIES OF FLORIDA, LLC (PLANT 4), Fort Myers: FLR05G007, held by Ajax Paving Industries of Florida LLC
- 2019-10-05: ST PETERSBURG MATERIAL RECOVERY FACILITY, Saint Petersburg: FLR05H740, held by Waste Connections of Florida, Inc.
AJAX PAVING INDUSTRIES OF FLORIDA, LLC (AJAX MATERIALS) among its neighbors
6 discharge permits are in the Harris Camp subwatershed (HUC 031001020301); FLR05H897 is one. Its county: 538, 9 major; FLR05H897 is minor permit.
Other permits in the Harris Camp subwatershed (HUC 031001020301)
- AJAX PAVING INDUSTRIES OF FLORIDA LLC (PLANT #1), North Venice: FLG074646, minor, term to 2030-10-23
- AJAX PAVING INDUSTRIES OF FLORIDA LLC (PLANT #1), Nokomis: FLR05G982, minor, term to 2024-09-27
- CARLTON WATER TREATMENT PLANT 3A PUMP STATION, Venice: FLR10YI24, minor, term to 2031-03-14
- CITY OF VENICE BOOSTER PUMP STATION, Nokomis: FLR20GX34, minor, term to 2029-02-04
- TITAN FLORIDA LLC VENICE READY MIX PLANT, Venice: FLG110243, minor, term to 2024-05-21
What stands out
- Its term runs 4 years and 365 days, September 29, 2019 to September 28, 2024; the term ended 746 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on March 1, 2018, 3,149 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 4 events for it, all in 2018.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | AJAX PAVING INDUSTRIES OF FLORIDA, LLC (AJAX MATERIALS) |
|---|---|
| Permittee | Ajax Paving Industries of Florida LLC |
| NPDES ID | FLR05H897 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | September 29, 2019 |
| Expires | September 28, 2024 |
| Agency | Florida Department of Environmental Protection |
| Address | Nokomis, FL 34275 |
| Subwatershed | Harris Camp (HUC 031001020301) |
| NAICS | 212393 – Other Chemical and Fertilizer Mineral Mining |
| SIC | 3295 – Minerals, Ground Or Treated |
NPDES FLR05H897: effluent limits and exceedances
AJAX PAVING INDUSTRIES OF FLORIDA, LLC (AJAX MATERIALS) (NPDES FLR05H897): 7 pollutants on file, 7 limited; 0 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 6 | 0 | 0 | ||
| Iron, total recoverable | 6 | 0 | 0 | ||
| Zinc, total recoverable | 6 | 0 | 0 | ||
| Aluminum, total recoverable | 6 | 0 | 0 | ||
| Lead, total recoverable | 6 | 0 | 0 | ||
| Copper, total recoverable | 6 | 0 | 0 | ||
| Chemical Oxygen Demand [COD] | 6 | 0 | 0 |
NPDES FLR05H897: inspections, violations and enforcement
NPDES FLR05H897: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 1, 2018 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| March 1, 2018 | WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP | ST6 |
| March 1, 2018 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| March 1, 2018 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
NPDES FLR05H897 (AJAX PAVING INDUSTRIES OF FLORIDA, LLC (AJAX MATERIALS)): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05H897
NPDES FLR05H897: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05H897
NPDES FLR05H897: 7 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.