Velarion Records
Free: one email when NPDES FLR05H955 changes. Unsubscribe any time.

NPDES FLR05H955 · Clean Water Act

KEY LARGO HARBOR MARINA, Key Largo, FL: NPDES FLR05H955 discharge permit, effluent exceedances, inspections, penalties

KEY LARGO HARBOR MARINA, Key Largo, Florida: General permit coverage FLR05H955, held by Lacross Marina LLC; Industrial stormwater; Administratively continued; issued April 25, 2016, term to April 24, 2021, by Florida Department of Environmental Protection.

  • Iron, total recoverable: 2 limits, 2 violations of any kind.
  • Zinc, total recoverable: 2 limits, 2 violations of any kind.
  • Aluminum, total recoverable: 2 limits, 2 violations of any kind.
  • Lead, total recoverable: 2 limits, 2 violations of any kind.
  • March 14, 2023: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to apply for a notice of termination (ST6).
  • May 4, 2020: WW Storm Water Non-Construction - Failure to submit required report (non-DMR) (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,164 were issued before FLR05H955.

Coverages issued nearest FLR05H955

KEY LARGO HARBOR MARINA among its neighbors

23 discharge permits are in the Upper Florida Keys subwatershed (HUC 030902030200); FLR05H955 is one. Its county: 119, 0 major; FLR05H955 is minor permit.

Other permits in the Upper Florida Keys subwatershed (HUC 030902030200)

What stands out

  • Its term runs 4 years and 364 days, April 25, 2016 to April 24, 2021; the term ended 1,970 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on March 14, 2023, 1,281 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 8 events for it, from 2020 to 2023; the busiest year is 2020 with 7.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityKEY LARGO HARBOR MARINA
PermitteeLacross Marina LLC
NPDES IDFLR05H955
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedApril 25, 2016
ExpiresApril 24, 2021
AgencyFlorida Department of Environmental Protection
AddressKey Largo, FL 33037
Receiving water impaired303(D) Listed
SubwatershedUpper Florida Keys (HUC 030902030200)
Other EPA IDs (FRS)RCRA handler FLR000046722

NPDES FLR05H955: effluent limits and exceedances

KEY LARGO HARBOR MARINA (NPDES FLR05H955): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Iron, total recoverable220
Zinc, total recoverable220
Aluminum, total recoverable220
Lead, total recoverable220

NPDES FLR05H955: inspections, violations and enforcement

NPDES FLR05H955: 8 single-event violations

DateWhat EPA recordedAgency
March 14, 2023WW Storm Water Non-Construction - Failure to Maintain RecordsST6
May 4, 2020WW Storm Water Non-Construction - Failure to Maintain RecordsST6
May 4, 2020WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
May 4, 2020WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
May 4, 2020WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
May 4, 2020WW Storm Water Non-Construction - Failure to MonitorST6
May 4, 2020WW Storm Water Non-Construction - Failure to apply for a notice of terminationST6
May 4, 2020WW Storm Water Non-Construction - Failure to submit required report (non-DMR)ST6

NPDES FLR05H955 (KEY LARGO HARBOR MARINA): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05H955

NPDES FLR05H955: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05H955

NPDES FLR05H955: 4 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.