NPDES FLR05I041 · Clean Water Act
SKANSKA - 3 MILE BRIDGE PRE-CAST FACILITY, Pensacola, FL: NPDES FLR05I041 discharge permit, effluent exceedances, inspections, penalties
SKANSKA - 3 MILE BRIDGE PRE-CAST FACILITY, Pensacola, Florida: General permit coverage FLR05I041, held by Skanska USA Civil Southeast Inc.; Industrial stormwater; Administratively continued; issued December 26, 2016, term to December 25, 2021, by Florida Department of Environmental Protection.
- Solids, total suspended: 2 limits, 1 violation of any kind.
- Iron, total recoverable: 2 limits, 1 violation of any kind.
- February 9, 2022: WW Storm Water Non-Construction - Failure to submit required report (non-DMR) (ST6).
- February 9, 2022: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- April 22, 2021: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- April 22, 2021: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- April 22, 2021: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
- April 22, 2021: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- April 22, 2021: WW Storm Water Non-Construction - Failure to submit required report (non-DMR) (ST6).
- August 15, 2017: WW Storm Water Non-Construction - Failure to Monitor (ST6).
- August 15, 2017: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- August 15, 2017: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
- August 15, 2017: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
- August 15, 2017: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 1,366 were issued before FLR05I041. Skanska USA Civil Southeast Inc. holds 4 permits in Florida.
Other permits held by Skanska USA Civil Southeast Inc.
- SKANSKA - 3 MILE BRIDGE OFFICE COMPLEX, Pensacola: FLR05I057, issued 2017-02-12
- PENSACOLA BAY BRIDGE RECONSTRUCTION (ID #480035), Pensacola: FLR20AY51, issued 2016-09-24
- BIG BEND ROAD (CR 672) AT I-75(SR 93A), Gibsonton: FLR20EZ85, issued 2021-12-03
Coverages issued nearest FLR05I041
- 2016-12-23: AMERICAN CHANGER CORP, Fort Lauderdale: FLRNEF432, held by American Changer Corp
- 2016-12-24: SEMINOLE COUNTY CENTRAL TRANSFER STATION, Longwood: FLR05H280, held by Seminole County
- 2016-12-25: MOSAIC FERTILIZER LLC-BARTOW FACILITY, Bartow: FLR05B883, held by Mosaic Fertilizer, L.L.C.
- 2016-12-25: QUIKRETE - MEDLEY, Miami: FLR05C160, held by The Quikrete Co
- 2016-12-25: WAL-MART DISTRIBUTION CENTER # 7035, Alachua: FLRNEE519, held by Wal Mart Stores East LP
- 2016-12-31: BEAR ARCHERY INC, Gainesville: FLR05D051, held by Escalade Sports
- 2017-01-02: GUARANTEED AUTO & TRUCK PARTS, INC., Okeechobee: FLR05F477, held by Guaranteed Auto & Truck Parts, Inc.
- 2017-01-03: LKQ SELF SERVICE DAYTONA, Daytona Beach: FLR05F728, held by LKQ Self Service Daytona
- 2017-01-06: CANAM STEEL CORPORATION, Jacksonville: FLR05B758, held by Canam Steel Corporation
- 2017-01-06: THE SHERWIN-WILLIAMS CO, Orlando: FLR05C322, held by The Sherwin-Williams Manufacturing Company
SKANSKA - 3 MILE BRIDGE PRE-CAST FACILITY among its neighbors
66 discharge permits are in the Bayou Cico-Bayou Garcon Frontal subwatershed (HUC 031401050403); FLR05I041 is one. Its county: 333, 8 major; FLR05I041 is minor permit.
Other permits in the Bayou Cico-Bayou Garcon Frontal subwatershed (HUC 031401050403)
- 111 S JAMAICA STREET, Pensacola: FLG073907, minor, term to 2029-01-11
- 1B-24 ACCELERATED WORK, Pensacola: FLR10WT41, minor, term to 2029-04-21
- 1B-24 VOLUME 2, Pensacola: FLR10XE18, minor, term to 2029-10-09
- 200 BLK NEW WARRINGTON, Pensacola: FLR10XX82, minor, term to 2030-09-12
- 407 S PACE BLVD, PENSACOLA, FL 32502, Pensacola: FLR10VP44, minor, term to 2027-12-08
- 7.14 EROSION AT SINTON CIRCLE OVERPASS, Pensacola: FLR10WM11, minor, term to 2028-12-24
- 7.2 - DRAINAGE SWALE REPAIR AT CORRY STATION, Pensacola: FLR20GV86, minor, term to 2028-12-17
- 7.3 STW SYSTEM AT GOLF COURSE AND DUNCAN RD, Pensacola: FLR20IH53, minor, term to 2030-06-05
- 7.4 - SUBSIDENCE ALON STORMWATER OTFALL, Pensacola: FLR20HW31, minor, term to 2030-01-18
- 7.6 STORMWATER CONVEYANCE CHANNEL AT FARRAR ROAD, Pensacola: FLR20IX68, minor, term to 2031-01-22
What stands out
- Its term runs 4 years and 364 days, December 26, 2016 to December 25, 2021; the term ended 1,725 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on February 9, 2022, 1,679 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 12 events for it, from 2017 to 2022.
- It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | SKANSKA - 3 MILE BRIDGE PRE-CAST FACILITY |
|---|---|
| Permittee | Skanska USA Civil Southeast Inc. |
| NPDES ID | FLR05I041 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | December 26, 2016 |
| Expires | December 25, 2021 |
| Agency | Florida Department of Environmental Protection |
| Address | Pensacola, FL 32502 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Bayou Cico-Bayou Garcon Frontal (HUC 031401050403) |
NPDES FLR05I041: effluent limits and exceedances
SKANSKA - 3 MILE BRIDGE PRE-CAST FACILITY (NPDES FLR05I041): 2 pollutants on file, 2 limited; 2 with a violation of any kind, 0 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Solids, total suspended | 2 | 1 | 0 | ||
| Iron, total recoverable | 2 | 1 | 0 |
NPDES FLR05I041: inspections, violations and enforcement
NPDES FLR05I041: 12 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| February 9, 2022 | WW Storm Water Non-Construction - Failure to submit required report (non-DMR) | ST6 |
| February 9, 2022 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| April 22, 2021 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| April 22, 2021 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| April 22, 2021 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
| April 22, 2021 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| April 22, 2021 | WW Storm Water Non-Construction - Failure to submit required report (non-DMR) | ST6 |
| August 15, 2017 | WW Storm Water Non-Construction - Failure to Monitor | ST6 |
| August 15, 2017 | WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| August 15, 2017 | WW Storm Water Non-Construction - Failure to properly install/implement BMPs | ST6 |
| August 15, 2017 | WW Storm Water Non-Construction - Failure to Conduct Inspections | ST6 |
| August 15, 2017 | WW Storm Water Non-Construction - Failure to Maintain Records | ST6 |
NPDES FLR05I041 (SKANSKA - 3 MILE BRIDGE PRE-CAST FACILITY): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR05I041
NPDES FLR05I041: one email when its EPA record changes — $99/month.
Permits near NPDES FLR05I041
NPDES FLR05I041: 2 pollutant rows, 12 dated events; ICIS-NPDES download, loaded September 15, 2026.