Velarion Records
Free: one email when NPDES FLR05I415 changes. Unsubscribe any time.

NPDES FLR05I415 · Clean Water Act

FABCO METAL PRODUCTS, Daytona Beach, FL: NPDES FLR05I415 discharge permit, effluent exceedances, inspections, penalties

FABCO METAL PRODUCTS, Daytona Beach, Florida: General permit coverage FLR05I415, held by Fabco Metal Products, LLC; Industrial stormwater; Administratively continued; issued August 31, 2019, term to August 30, 2024, by Florida Department of Environmental Protection.

  • Nitrite + Nitrate total [as N]: 2 limits, 1 violation of any kind.
  • Iron, total recoverable: 2 limits, 1 violation of any kind.
  • Zinc, total recoverable: 2 limits, 1 violation of any kind.
  • Aluminum, total recoverable: 2 limits, 1 violation of any kind.
  • October 26, 2023: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • October 26, 2023: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • October 26, 2023: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • October 26, 2023: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • October 26, 2023: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • October 26, 2023: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • October 26, 2023: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
  • December 13, 2022: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 2,245 were issued before FLR05I415.

Coverages issued nearest FLR05I415

FABCO METAL PRODUCTS among its neighbors

47 discharge permits are in the Upper Tomoka River subwatershed (HUC 030802010202); FLR05I415 is one. Its county: 479, 8 major; FLR05I415 is minor permit.

Other permits in the Upper Tomoka River subwatershed (HUC 030802010202)

What stands out

  • Its term runs 4 years and 365 days, August 31, 2019 to August 30, 2024; the term ended 746 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on October 26, 2023, 1,055 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 14 events for it, from 2022 to 2023.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityFABCO METAL PRODUCTS
PermitteeFabco Metal Products, LLC
NPDES IDFLR05I415
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedAugust 31, 2019
ExpiresAugust 30, 2024
AgencyFlorida Department of Environmental Protection
AddressDaytona Beach, FL 32124
Receiving water impaired303(D) Listed
SubwatershedUpper Tomoka River (HUC 030802010202)
Other EPA IDs (FRS)RCRA handler FLR000041756; ICIS-AIR source FL0000001212700140

NPDES FLR05I415: effluent limits and exceedances

FABCO METAL PRODUCTS (NPDES FLR05I415): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Nitrite + Nitrate total [as N]210
Iron, total recoverable210
Zinc, total recoverable210
Aluminum, total recoverable210

NPDES FLR05I415: inspections, violations and enforcement

NPDES FLR05I415: 14 single-event violations

DateWhat EPA recordedAgency
October 26, 2023WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
October 26, 2023WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
October 26, 2023WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
October 26, 2023WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
October 26, 2023WW Storm Water Non-Construction - Failure to Maintain RecordsST6
October 26, 2023WW Storm Water Non-Construction - Failure to MonitorST6
October 26, 2023WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6
December 13, 2022WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
December 13, 2022WW Storm Water Non-Construction - Failure to Maintain RecordsST6
December 13, 2022WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
December 13, 2022WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
December 13, 2022WW Storm Water Non-Construction - Failure to MonitorST6
December 13, 2022WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6
December 13, 2022WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6

NPDES FLR05I415 (FABCO METAL PRODUCTS): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05I415

NPDES FLR05I415: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05I415

NPDES FLR05I415: 4 pollutant rows, 14 dated events; ICIS-NPDES download, loaded September 15, 2026.