Velarion Records
Free: one email when NPDES FLR05I863 changes. Unsubscribe any time.

NPDES FLR05I863 · Clean Water Act

POLK COUNTY PICK & PAY, Lakeland, FL: NPDES FLR05I863 discharge permit, effluent exceedances, inspections, penalties

POLK COUNTY PICK & PAY, Lakeland, Florida: General permit coverage FLR05I863, held by Metal Recyclers, Inc.; Industrial stormwater; Effective; issued May 21, 2022, term to May 20, 2027, by Florida Department of Environmental Protection.

No violation or effluent exceedance is on file for any of the 4 pollutants listed for NPDES FLR05I863.

  • Solids, total suspended: 1 limit.
  • Iron, total recoverable: 1 limit.
  • Aluminum, total recoverable: 1 limit.
  • Lead, total recoverable: 1 limit.
  • June 26, 2024: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • June 26, 2024: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • July 13, 2022: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • July 13, 2022: WW Storm Water Non-Construction - Failure to properly operate and maintain BMPs (ST6).
  • July 13, 2022: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 3,190 were issued before FLR05I863.

Coverages issued nearest FLR05I863

POLK COUNTY PICK & PAY among its neighbors

19 discharge permits are in the Hillsborough River Drain subwatershed (HUC 031002050201); FLR05I863 is one. Its county: 1,026, 40 major; FLR05I863 is minor permit.

Other permits in the Hillsborough River Drain subwatershed (HUC 031002050201)

What stands out

  • Its term runs 4 years and 364 days, May 21, 2022 to May 20, 2027.
  • Its newest dated event on file is a single-event violation on June 26, 2024, 811 days before EPA's file was loaded.
  • No dated event in the 365 days to September 15, 2026.
  • EPA's file dates 5 events for it, from 2022 to 2024; the busiest year is 2022 with 3.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityPOLK COUNTY PICK & PAY
PermitteeMetal Recyclers, Inc.
NPDES IDFLR05I863
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedMay 21, 2022
ExpiresMay 20, 2027
AgencyFlorida Department of Environmental Protection
AddressLakeland, FL 33809
Receiving water impaired303(D) Listed
SubwatershedHillsborough River Drain (HUC 031002050201)

NPDES FLR05I863: effluent limits and exceedances

POLK COUNTY PICK & PAY (NPDES FLR05I863): 4 pollutants on file, 4 limited; 0 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended100
Iron, total recoverable100
Aluminum, total recoverable100
Lead, total recoverable100

NPDES FLR05I863: inspections, violations and enforcement

NPDES FLR05I863: 5 single-event violations

DateWhat EPA recordedAgency
June 26, 2024WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
June 26, 2024WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
July 13, 2022WW Storm Water Non-Construction - Failure to MonitorST6
July 13, 2022WW Storm Water Non-Construction - Failure to properly operate and maintain BMPsST6
July 13, 2022WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6

NPDES FLR05I863 (POLK COUNTY PICK & PAY): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR05I863

NPDES FLR05I863: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05I863

NPDES FLR05I863: 4 pollutant rows, 5 dated events; ICIS-NPDES download, loaded September 15, 2026.