Velarion Records
Free: one email when NPDES FLR05J393 changes. Unsubscribe any time.

NPDES FLR05J393 · Clean Water Act

TRACK LINE RAIL - MARION COUNTY, Dunnellon, FL: NPDES FLR05J393 discharge permit, effluent exceedances, inspections, penalties

TRACK LINE RAIL - MARION COUNTY, Dunnellon, Florida: General permit coverage FLR05J393, held by Track Line Rail, LLC; Industrial stormwater; Effective; issued September 11, 2025, term to September 10, 2030, by Florida Department of Environmental Protection; All Other Miscellaneous Manufacturing.

  • January 7, 2026: Notice of Noncompliance Issued (State).
  • December 15, 2025: WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMP (ST6).
  • December 15, 2025: WW Storm Water Non-Construction - Failure to Monitor (ST6).
  • December 15, 2025: WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • December 15, 2025: WW Storm Water Non-Construction - Failure to properly install/implement BMPs (ST6).
  • December 15, 2025: WW Storm Water Non-Construction - Failure to Conduct Inspections (ST6).
  • December 15, 2025: WW Storm Water Non-Construction - Failure to Maintain Records (ST6).

Florida holds 3,868 Industrial stormwater coverages of this permit type in EPA’s file; 3,669 were issued before FLR05J393.

Coverages issued nearest FLR05J393

TRACK LINE RAIL - MARION COUNTY among its neighbors

12 discharge permits are in the Rainbow River subwatershed (HUC 031002081101); FLR05J393 is one. Its county: 344, 0 major; FLR05J393 is minor permit.

Other permits in the Rainbow River subwatershed (HUC 031002081101)

What stands out

  • Its term runs 4 years and 364 days, September 11, 2025 to September 10, 2030.
  • Its newest dated event on file is an informal enforcement action on January 7, 2026, 280 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 6 single-event violations, 1 informal enforcement action.
  • EPA's file dates 7 events for it, from 2025 to 2026; the busiest year is 2025 with 6.
  • It is one of 23,564 discharge permits on the register in Florida; 3,868 of them (16%) are in its program, Industrial stormwater, and it is a minor discharger.

Identity

FacilityTRACK LINE RAIL - MARION COUNTY
PermitteeTrack Line Rail, LLC
NPDES IDFLR05J393
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedSeptember 11, 2025
ExpiresSeptember 10, 2030
AgencyFlorida Department of Environmental Protection
AddressDunnellon, FL 34432
Receiving water impaired303(D) Listed
SubwatershedRainbow River (HUC 031002081101)
NAICS339999 – All Other Miscellaneous Manufacturing
SIC2499 – Wood Products

NPDES FLR05J393: effluent limits and exceedances

TRACK LINE RAIL - MARION COUNTY (NPDES FLR05J393): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES FLR05J393: no pollutant row on file.

NPDES FLR05J393: inspections, violations and enforcement

NPDES FLR05J393: 6 single-event violations

DateWhat EPA recordedAgency
December 15, 2025WW Storm Water Non-Construction - Failure to Implement SWPPP/SWMPST6
December 15, 2025WW Storm Water Non-Construction - Failure to MonitorST6
December 15, 2025WW Storm Water Non-Construction - Failure to develop any or adequate SWPPP/SWMPST6
December 15, 2025WW Storm Water Non-Construction - Failure to properly install/implement BMPsST6
December 15, 2025WW Storm Water Non-Construction - Failure to Conduct InspectionsST6
December 15, 2025WW Storm Water Non-Construction - Failure to Maintain RecordsST6

NPDES FLR05J393: 1 informal enforcement action

DateWhat EPA recordedAgency
January 7, 2026Notice of Noncompliance IssuedState

NPDES FLR05J393 (TRACK LINE RAIL - MARION COUNTY): no inspection and formal enforcement action on file.

Watch NPDES FLR05J393

NPDES FLR05J393: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR05J393

NPDES FLR05J393: 0 pollutant rows, 7 dated events; ICIS-NPDES download, loaded October 14, 2026.