NPDES FLR10AT78 · Clean Water Act
CABANA CAY, Panama City Beach, FL: NPDES FLR10AT78 discharge permit, effluent exceedances, inspections, penalties
CABANA CAY, Panama City Beach, Florida: General permit coverage FLR10AT78, held by Gac Contractors, Inc; Construction stormwater; Administratively continued; issued June 19, 2005, term to June 18, 2010.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 0 were issued before FLR10AT78.
Coverages issued nearest FLR10AT78
- 2006-03-08: VERANDAHS, Hudson: FLR10CF87
- 2006-03-18: MANCHESTER SQUARE, Naples: FLR10CO01, held by Wci Communities
- 2006-05-17: SLEEPY HOLLOW WASTE DISPOSAL E, Green Cove Springs: FLR10CY06, held by Sleepy Hollow Waste Disposal E
- 2006-05-17: MASTERS PIT WASTE DISPOSAL EXC, Middleburg: FLR10CY07, held by Masters Pit Waste Disposal Exc
- 2006-06-08: RAINTREE PHASE 2, St Cloud: FLR10CP18, held by Raintree Phase 2
CABANA CAY among its neighbors
49 discharge permits are in the Eastern Lake-Phillips Inlet Frontal subwatershed (HUC 031401011004); FLR10AT78 is one. Its county: 397, 7 major; FLR10AT78 is minor permit.
Other permits in the Eastern Lake-Phillips Inlet Frontal subwatershed (HUC 031401011004)
- 297 ALYS BEACH BLOCK V, Rosemary Beach: FLR20FZ13, minor, term to 2028-01-20
- 30 CAMP CREEK, Rosemary Beach: FLR20IN63, minor, term to 2030-08-28
- 304 ALYS BEACH BLOCK X BOH, Rosemary Beach: FLR20GT57, minor, term to 2028-11-09
- 317 THE OVERLOOK AT INLET BEACH, Panama City Beach: FLR20GK79, minor, term to 2028-07-09
- 351 ALYS BEACH BLOCK WW SITE WORK, Rosemary Beach: FLR20HE56, minor, term to 2029-04-25
- ALL IN CREDIT UNION PCB, Panama City Beach: FLR10WR62, minor, term to 2029-03-24
- ALYS BEACH - BLOCK TT_UU_VV_WW, Rosemary Beach: FLR20GD51, minor, term to 2028-03-24
- ALYS BEACH - PHASE 1A, Panama City Beach: FLR10CG24, minor, term to 2016-01-13
- ALYS BEACH BLOCK BB_CC, Rosemary Beach: FLR20HN28, minor, term to 2029-08-31
- ALYS BEACH BLOCK GG W. AMENITY SITE, Rosemary Beach: FLR20FG73, minor, term to 2027-03-20
What stands out
- Its term runs 4 years and 364 days, June 19, 2005 to June 18, 2010; the term ended 5,962 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CABANA CAY |
|---|---|
| Permittee | Gac Contractors, Inc |
| NPDES ID | FLR10AT78 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 19, 2005 |
| Expires | June 18, 2010 |
| Address | Panama City Beach, FL 32413 |
| Subwatershed | Eastern Lake-Phillips Inlet Frontal (HUC 031401011004) |
NPDES FLR10AT78: effluent limits and exceedances
CABANA CAY (NPDES FLR10AT78): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10AT78: no pollutant row on file.
NPDES FLR10AT78: inspections, violations and enforcement
NPDES FLR10AT78 (CABANA CAY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10AT78
NPDES FLR10AT78: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10AT78
NPDES FLR10AT78: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.