NPDES FLR10QW09 · Clean Water Act
HARMONY RESERVE, Vero Beach, FL: NPDES FLR10QW09 discharge permit, effluent exceedances, inspections, penalties
HARMONY RESERVE, Vero Beach, Florida: General permit coverage FLR10QW09, held by Holiday Builders Inc; Construction stormwater; Effective; issued March 27, 2017, term to March 26, 2022, by Florida Department of Environmental Protection.
- December 15, 2021: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- December 15, 2021: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- December 15, 2021: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- October 31, 2019: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- April 21, 2017: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 427 were issued before FLR10QW09. Holiday Builders Inc holds 2 permits in Florida.
Other permits held by Holiday Builders Inc
- PINEAPPLE GROVE, Fort Pierce: FLR20HY67, issued 2025-02-21
Coverages issued nearest FLR10QW09
- 2017-03-10: TWIN CREEK PARCELS 2 & 3, Saint Johns: FLR20BG52, held by Lennar Homes LLC
- 2017-03-12: THE PLACE AT CORKSCREW, Estero: FLR10QW33, held by Lennar Homes LLC
- 2017-03-17: ARTISTRY, Sarasota: FLR10QW58, held by Kolter Homes
- 2017-03-19: COMPASS LANDING, Naples: FLR10QW96, held by MATTAMY HOMES
- 2017-03-24: SPLIT OAKS AKA CYRILS DRIVE COMMUNITY, Saint Cloud: FLR20BG73, held by Pulte Home Company, LLC
- 2017-04-09: COMPASS SITE STORAGE, West Palm Beach: FLR10QY20, held by Amsdell Storage Ventures XXX, LLC
- 2017-04-15: SR 80 (SOUTHERN BLVD) BRIDGE REPLACEMENTS, West Palm Beach: FLR20BH51, held by Johnson Bros Corporation
- 2017-04-20: WINCHESTER RIDGE PH 2 (FKA THE TRAIL PH 1B), Jacksonville: FLR20BI59, held by DR Horton Inc
- 2017-04-24: CYPRESS PLAZA FORMER DUMP, Jacksonville: FLR20BI31, held by Dominion, Inc.
- 2017-04-27: KENSINGTON RESERVE, Sanford: FLR10QZ33, held by NVR Ryan Homes - Orlando
HARMONY RESERVE among its neighbors
70 discharge permits are in the North Canal subwatershed (HUC 030802030303); FLR10QW09 is one. Its county: 468, 2 major; FLR10QW09 is minor permit.
Other permits in the North Canal subwatershed (HUC 030802030303)
- 4866 ROUER, Vero Beach: FLR20HT36, minor, term to 2029-12-06
- 5580 59TH TERRACE, Vero Beach: FLR10XV36, minor, term to 2030-07-24
- 5730 59TH AVE, Vero Beach: FLR20GL09, minor, term to 2028-07-13
- 58TH AVE, Vero Beach: FLR10XG40, minor, term to 2029-11-17
- 6040 45TH ST, Vero Beach: FLR20GQ27, minor, term to 2028-09-20
- 69TH STREET FROM 66TH AVE TO SR5/US-1, Vero Beach: FLR20FM61, minor, term to 2027-06-11
- ARCADIA, Vero Beach: FLR10QG85, minor, term to 2021-06-29
- AUTO ACRES RECYCLING & PARTS, INC., Vero Beach: FLR05G893, minor, term to 2014-07-21
- BENT PINE, Vero Beach: FLR10XC56, minor, term to 2029-09-11
- BENT PINE PRESERVE, Vero Beach: FLR10TB73, minor, term to 2024-10-06
What stands out
- Its term runs 4 years and 364 days, March 27, 2017 to March 26, 2022; the term ended 1,663 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- Its newest dated event on file is a single-event violation on December 15, 2021, 1,764 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 5 events for it, from 2017 to 2021; the busiest year is 2021 with 3.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HARMONY RESERVE |
|---|---|
| Permittee | Holiday Builders Inc |
| NPDES ID | FLR10QW09 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 27, 2017 |
| Expires | March 26, 2022 |
| Agency | Florida Department of Environmental Protection |
| Address | Vero Beach, FL 32966 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | North Canal (HUC 030802030303) |
NPDES FLR10QW09: effluent limits and exceedances
HARMONY RESERVE (NPDES FLR10QW09): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10QW09: no pollutant row on file.
NPDES FLR10QW09: inspections, violations and enforcement
NPDES FLR10QW09: 5 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| December 15, 2021 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| December 15, 2021 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
| December 15, 2021 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| October 31, 2019 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| April 21, 2017 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
NPDES FLR10QW09 (HARMONY RESERVE): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10QW09
NPDES FLR10QW09: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10QW09
NPDES FLR10QW09: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded October 14, 2026.