NPDES FLR10UV27 · Clean Water Act
US 17 WATER MAIN EXTENSION, Zolfo Springs, FL: NPDES FLR10UV27 discharge permit, effluent exceedances, inspections, penalties
US 17 WATER MAIN EXTENSION, Zolfo Springs, Florida: General permit coverage FLR10UV27, held by US 17 Water Main Extension; Construction stormwater; Effective; issued December 16, 2021, term to December 15, 2026, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 1,272 were issued before FLR10UV27.
Coverages issued nearest FLR10UV27
- 2021-12-13: CROSS CREEK ESTATES LAKE BANK RESTORATION, Fort Myers: FLR10UW11, held by Seabreeze Erosion Solutions
- 2021-12-13: TPA BUILDING 26, Jupiter: FLR20FA00, held by Evans General Contractors, LLC
- 2021-12-13: VALVOLINE BALLANTRAE, Land O Lakes: FLR20FA02, held by Keator Construction LLC
- 2021-12-13: POINTE GRAND PALM COAST, Palm Coast: FLR20FA03, held by Barnett Contracting Inc
- 2021-12-13: E1T28 - RIVER ROAD, Venice: FLR20FA10, held by The De Moya Group Inc
- 2021-12-16: I-4 BELTWAY WAREHOUSE, Sanford: FLR20FA16, held by I-4 Beltway Warehouse
- 2021-12-16: EAST LAKE JOANNA WATER QUALITY IMPROVEMENTS, Eustis: FLR20FA17, held by BULLDOG SITEWORK LLC
- 2021-12-17: DEMO BOAT MAINTENANCE YARD B665, Tampa: FLR10UV19, held by Bay Area Building Solutions, Inc.
- 2021-12-17: CIRCLE K @ BUSINESS AT LAKE ST. CHARLES - NIC UGTS, Davenport: FLR10UV34, held by Empire Reality Davenport, LLC
- 2021-12-17: BLISS (HAMMOCK BAY PDP 3), Freeport: FLR10UV37, held by Young's Contracting
US 17 WATER MAIN EXTENSION among its neighbors
6 discharge permits are in the Troublesome Creek subwatershed (HUC 031001010701); FLR10UV27 is one. Its county: 33, 5 major; FLR10UV27 is minor permit.
Other permits in the Troublesome Creek subwatershed (HUC 031001010701)
- CASA SAN ALFONSO, Zolfo Springs: FLR20FU07, minor, term to 2027-10-15
- FLORIDA BEEF INC, Zolfo Springs: FLR05G758, minor, term to 2018-08-16
- JAHNA CONCRETE, INC. -ZOLFO SPRINGS CONCRETE BATCH PLANT, Zolfo Springs: FLG110195, minor, term to 2025-11-11
- LONG WOOD RANCH, Wauchula: FLR10XD72, minor, term to 2029-10-03
- WAUCHULA MUNICIPAL AIRPORT, Wauchula: FLR10VP23, minor, term to 2027-11-30
What stands out
- Its term runs 4 years and 364 days, December 16, 2021 to December 15, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | US 17 WATER MAIN EXTENSION |
|---|---|
| Permittee | US 17 Water Main Extension |
| NPDES ID | FLR10UV27 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 16, 2021 |
| Expires | December 15, 2026 |
| Agency | Florida Department of Environmental Protection |
| Address | Zolfo Springs, FL 33890 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Troublesome Creek (HUC 031001010701) |
NPDES FLR10UV27: effluent limits and exceedances
US 17 WATER MAIN EXTENSION (NPDES FLR10UV27): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10UV27: no pollutant row on file.
NPDES FLR10UV27: inspections, violations and enforcement
NPDES FLR10UV27 (US 17 WATER MAIN EXTENSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10UV27
NPDES FLR10UV27: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10UV27
NPDES FLR10UV27: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.