NPDES FLR10VA91 · Clean Water Act
YUCATAN GARDENS, Orlando, FL: NPDES FLR10VA91 discharge permit, effluent exceedances, inspections, penalties
YUCATAN GARDENS, Orlando, Florida: General permit coverage FLR10VA91, held by Yucatan CFB Homes, LLC; Construction stormwater; Effective; issued March 21, 2022, term to March 20, 2027, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 1,760 were issued before FLR10VA91.
Coverages issued nearest FLR10VA91
- 2022-03-20: THE PALMS AT WATERFORD PD, Orlando: FLR20FG66, held by The Palms at Waterford PD
- 2022-03-20: TUTTLE ROYAL, Wellington: FLR20FG67, held by Verdex Construction
- 2022-03-20: SOUTHWEST HAMMOCKS, Pembroke Pines: FLR20FH90, held by Carrfour Supportive Housing
- 2022-03-20: MIRADA PARCEL 15A, San Antonio: FLR20FH91, held by CRCG Two LP
- 2022-03-21: FAIRFIELD INN AND SUITES, Tampa: FLR10VA90, held by Firmo Construction LLC
- 2022-03-21: FORTIFIED STORAGE CENTER, Vero Beach: FLR10VC12, held by FSB Development LLC
- 2022-03-21: MANSION HOUSE, Naples: FLR10VC13, held by BCBE Construction LLC
- 2022-03-21: THE RESIDENCE AT FOX CREEK, Nokomis: FLR20FG70, held by Suarez Grading Enterprises, Inc
- 2022-03-21: OMNI HOTEL EXPANSION, Champions Gate: FLR20FG72, held by Mack Contracting
- 2022-03-21: ALYS BEACH BLOCK GG W. AMENITY SITE, Rosemary Beach: FLR20FG73, held by Ebsco Gulf Coast Devlmpt, Inc.
YUCATAN GARDENS among its neighbors
50 discharge permits are in the Lake Corrine subwatershed (HUC 030801011006); FLR10VA91 is one. Its county: 1,375, 15 major; FLR10VA91 is minor permit.
Other permits in the Lake Corrine subwatershed (HUC 030801011006)
- ACCORD INDUSTRIES, Winter Park: FLR05G641, minor, term to 2013-01-08
- AUTO ZONE ORLANDO FL0419, Orlando: FLR20HS15, minor, term to 2029-11-17
- AUTO ZONE ORLANDO FL0419, Orlando: FLR20HT44, minor, term to 2029-12-07
- BAKER EQUIPMENT AND MATERIALS, Orlando: FLG073478, minor, term to 2027-09-20
- BAKER EQUIPMENT AND MATERIALS, Orlando: FLR20FS63, minor, term to 2027-09-21
- BATES ROAD BRIDGE REPLACEMENT, Orlando: FLR20IC47, minor, term to 2030-04-03
- BISHOP & BUTTREY INCORPORATED PIT 205, Unincorporated: FLR20HY64, minor, term to 2030-02-05
- CEMEX - WINTER PARK CBP, Winter Park: FLG110771, minor, term to 2022-11-04
- CHICKASAW VILLAS, Orlando: FLR20IM28, minor, term to 2030-08-13
- CITY INDUSTRIES GROUND WATER REMEDIATION TREATMENT, Winter Park: FL0043265, minor, term to 2020-08-27
What stands out
- Its term runs 4 years and 364 days, March 21, 2022 to March 20, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | YUCATAN GARDENS |
|---|---|
| Permittee | Yucatan CFB Homes, LLC |
| NPDES ID | FLR10VA91 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 21, 2022 |
| Expires | March 20, 2027 |
| Agency | Florida Department of Environmental Protection |
| Address | Orlando, FL 32807 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lake Corrine (HUC 030801011006) |
NPDES FLR10VA91: effluent limits and exceedances
YUCATAN GARDENS (NPDES FLR10VA91): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10VA91: no pollutant row on file.
NPDES FLR10VA91: inspections, violations and enforcement
NPDES FLR10VA91 (YUCATAN GARDENS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10VA91
NPDES FLR10VA91: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10VA91
NPDES FLR10VA91: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.