NPDES FLR10VM05 · Clean Water Act
SHENANDOAH PARK, Miami, FL: NPDES FLR10VM05 discharge permit, effluent exceedances, inspections, penalties
SHENANDOAH PARK, Miami, Florida: General permit coverage FLR10VM05, held by City of Miami; Construction stormwater; Effective; issued September 29, 2022, term to September 28, 2027, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 2,815 were issued before FLR10VM05. City of Miami holds 11 permits in Florida.
Other permits held by City of Miami
- MOORE PARK GYMNASIUM, Miami: FLR10VA24, issued 2022-02-25
- WEST END PARK, Miami: FLR10VD38, issued 2022-05-07
- CURTIS PARK COMMUNITY CENTER, Miami: FLR10VL88, issued 2022-09-26
- MIAMI POLICE HEADQUARTERS, Miami: FLR10XI14, issued 2024-12-22
- N. BAYSHORE DRIVE, Miami: FLR10XQ13, issued 2025-04-28
- ATHALIE RANGE PARK NEW RECREATION BUILDING, Miami: FLR10XY99, issued 2025-09-22
- NORTH BAY SHORE DRIVE, Miami: FLR10YC39, issued 2025-12-05
- BUENA VISTA, Miami: FLR10YC91, issued 2025-12-13
- SHENANDOAH MINI PARK ROW IMPROVEMENTS, Miami: FLR20GL03, issued 2023-07-14
- LITTLE HAVANA PEDESTRIAN PRIORITY ZONE, Miami: FLR20IN41, issued 2025-08-28
Coverages issued nearest FLR10VM05
- 2022-09-26: GEORGIA AVE BASIN, Fort Pierce: FLR20FT13, held by Boromei Construction
- 2022-09-26: RAISING CANE'S, Port St Lucie: FLR20FT18, held by Raising Cane's
- 2022-09-26: HYUNDAI PHASE 4, Vero Beach: FLR20FT28, held by Route 60 Realty LLC
- 2022-09-29: TANNER TEE, Sarasota: FLR10VL82, held by Menard Properties LLC
- 2022-09-29: TESLA ST PETERSBURG, Saint Petersburg: FLR10VM00, held by St Petersburg Motors, LLC
- 2022-09-29: URBY WYNWOOD, Miami: FLR10VM29, held by 20 60 NE 27th Street LLC
- 2022-09-29: SPRINGS AT LAKE ALFRED, Lake Alfred: FLR20FT08, held by Meritage Homes of Florida Inc
- 2022-09-29: EDGEWATER-ED4, Saint Cloud: FLR20FT11, held by Meritage Homes
- 2022-09-29: DOCTOR PHILLIPS COMMUNITY PARK BALLFIELDS, Orlando: FLR20FT12, held by Oelrich Construction, Inc.
- 2022-09-29: FPL GREYNOLDS SUBSTATION, North Miami Beach: FLR20FT20, held by Phillips and Jordan
SHENANDOAH PARK among its neighbors
51 discharge permits are in the Coral Gables Canal subwatershed (HUC 030902061701); FLR10VM05 is one. Its county: 1,003, 37 major; FLR10VM05 is minor permit.
Other permits in the Coral Gables Canal subwatershed (HUC 030902061701)
- 1201 BRICKELL, Miami: FLR10YJ57, minor, term to 2031-04-03
- 1401 SW 1ST AVE MF BUILDING, Miami: FLR20FT57, minor, term to 2027-10-07
- 1428 BRICKELL, Miami: FLR20GD20, minor, term to 2028-03-18
- 2157 FLAGLER, Miami: FLR10YG24, minor, term to 2031-02-12
- 2200 BRICKELL, Miami: FLR20GI89, minor, term to 2028-06-09
- 27TH AVENUE & CORAL WAY, Miami: FLR10XW05, minor, term to 2030-08-06
- 3140 GRAND AVE PARKING BOOTH, Miami: FLRNEF860, minor, term to 2027-12-11
- 3488 ST GAUDENS ROAD, Miami: FLR10VI18, minor, term to 2027-07-20
- 3500 CURTIS LN, Miami: FLR10XC53, minor, term to 2029-09-11
- 3671 MATHESON AVE., Miami: FLR20HH96, minor, term to 2029-06-16
What stands out
- Its term runs 4 years and 364 days, September 29, 2022 to September 28, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SHENANDOAH PARK |
|---|---|
| Permittee | City of Miami |
| NPDES ID | FLR10VM05 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 29, 2022 |
| Expires | September 28, 2027 |
| Agency | Florida Department of Environmental Protection |
| Address | Miami, FL 33145 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Coral Gables Canal (HUC 030902061701) |
NPDES FLR10VM05: effluent limits and exceedances
SHENANDOAH PARK (NPDES FLR10VM05): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10VM05: no pollutant row on file.
NPDES FLR10VM05: inspections, violations and enforcement
NPDES FLR10VM05 (SHENANDOAH PARK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10VM05
NPDES FLR10VM05: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10VM05
NPDES FLR10VM05: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.