Clean Water Act discharge permit · NPDES FLR10VW95
MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION, Miami, FL: NPDES FLR10VW95 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION, held by Lemartec Corporation, holds NPDES permit FLR10VW95. EPA’s file records it issued April 21, 2023 and expiring April 20, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION: its NPDES ID, its permit type and status, its dates, its address in Miami, Florida. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES FLR10VW95.
What stands out
- Its term runs 4 years and 365 days, April 21, 2023 to April 20, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION |
|---|---|
| Permittee as filed | Lemartec Corporation |
| NPDES ID | FLR10VW95 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 21, 2023 |
| Expiration date | April 20, 2028 |
| Issuing agency | Florida Department of Environmental Protection |
| Address | Miami, FL 33142 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Miami River (HUC 030902061405) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR10VW95.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES FLR10VW95.
Inspections
EPA’s inspection file holds no inspection for NPDES FLR10VW95.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES FLR10VW95.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR10VW95.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR10VW95 there.
MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION, Miami, Florida: Coverage under a general permit FLR10VW95, held by Lemartec Corporation; Construction stormwater; Effective; issued April 21, 2023, term to April 20, 2028, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 3,972 were issued before FLR10VW95. Lemartec Corporation holds 2 permits in Florida.
Other permits held by Lemartec Corporation
- MIAMI INTERNATIONAL AIRPORT EMPLOYEE PARK 6 GARAGE, Miami: FLR10WS52, issued 2024-04-07
Coverages issued nearest FLR10VW95
- 2023-04-20: CROWN SQUARE, Palm Bay: FLR20GG56, held by Olympus Construction Group Inc
- 2023-04-21: CORAL RIDGE AT NOCATEE, Ponte Vedra: FLR10VW74, held by David Weekley Homes LLC
- 2023-04-21: WHITING STREET DEVELOPMENT, Tampa: FLR10VW90, held by Lema Construction
- 2023-04-21: FLETCHER MOB, Tampa: FLR10VW92, held by The Diaz Fritz Group
- 2023-04-21: CARGILL, INC., Kissimmee: FLR10VW94, held by Cargill, Inc.
- 2023-04-21: PEN AIR BEULAH BRANCH, Pensacola: FLR10VW96, held by Pen Air Beulah Branch
- 2023-04-21: FIRST BAPTIST CHURCH OF SW BROWARD, Hollywood: FLR10VX84, held by First Baptist Church of Southwest Broward County, Inc.
- 2023-04-21: AMAZON PHASE 1.25, Lakeland: FLR20GF40, held by Hanson Professional Services Inc
- 2023-04-21: SLIM CHICKENS AT LITTLE RD. AND TROUBLE CREEK RD., New Port Richey: FLR20GF44, held by Plaza Street Fund 263, LLC
- 2023-04-21: SLIM CHICKENS AT MIRADA BLVD., San Antonio: FLR20GF45, held by Plaza Street Fund 273, LLC
MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION among its neighbors
296 discharge permits are in the Miami River subwatershed (HUC 030902061405); FLR10VW95 is one. Its county: 1,003, 37 major; FLR10VW95 is minor permit.
Other permits in the Miami River subwatershed (HUC 030902061405)
- 1 SOUTHSIDE PARK, Miami: FLR20GC84, minor, term to 2028-03-15
- 101 SE 1ST AVE, Miami: FLR20JF46, minor, term to 2031-05-01
- 14 ALLAPATTAH BUILDING 1, Miami: FLR10UU92, minor, term to 2026-11-18
- 14 ALLAPATTAH BUILDING 2, Miami: FLR10UU94, minor, term to 2026-11-18
- 16 ALLAPATTAH, Miami: FLR10UU93, minor, term to 2026-11-18
- 1750 MULTI FAMILY, Miami: FLR20IO50, minor, term to 2030-09-07
- 2000 NW 5TH PLACE, Miami: FLR10YB77, minor, term to 2030-11-19
- 2025-2 SE 4TH PLACE, Hialeah: FLR10XI90, minor, term to 2030-01-11
- 2337 NW 5TH AVENUE, Miami: FLR10WP50, minor, term to 2029-02-22
- 244 SW 9TH ST, Miami: FLR20GJ17, minor, term to 2028-06-11
Nearby on the register
- Discharge permits in Miami
- Every permit record in Miami, A to Z
- Discharge permits in Florida
- Every permit record in Florida, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
0.4% of the 673 storm water construction permits in Miami-Dade County carry a violation on file. Of those 673 permits, 35.5% carry an earlier issue date than MIAMI FREEDOM PARK - PHASE 1 - REMEDIATION. The Miami River subwatershed includes 296 NPDES permits, including this permit.