NPDES FLR10WP03 · Clean Water Act
POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon, FL: NPDES FLR10WP03 discharge permit, effluent exceedances, inspections, penalties
POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon, Florida: General permit coverage FLR10WP03, held by Pedro Falcon Contractors Inc; Construction stormwater; Effective; issued February 15, 2024, term to February 14, 2029, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 6,034 were issued before FLR10WP03. Pedro Falcon Contractors Inc holds 7 permits in Florida.
Other permits held by Pedro Falcon Contractors Inc
- POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WO99, issued 2024-02-15
- POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP01, issued 2024-02-15
- POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP02, issued 2024-02-15
- POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP04, issued 2024-02-15
- POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP05, issued 2024-02-15
- KEY COLONY BEACH CITY HALL, Key Colony Beach: FLR20IW39, issued 2026-01-08
Coverages issued nearest FLR10WP03
- 2024-02-15: GRASSANO, Vero Beach: FLR10WO88, held by Grassano
- 2024-02-15: EDWIN ZAPATA RESIDENCE, Vero Beach: FLR10WO89, held by Edwin Zapata Residence
- 2024-02-15: POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WO99, held by Pedro Falcon Contractors Inc
- 2024-02-15: POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP01, held by Pedro Falcon Contractors Inc
- 2024-02-15: POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP02, held by Pedro Falcon Contractors Inc
- 2024-02-15: POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP04, held by Pedro Falcon Contractors Inc
- 2024-02-15: POWER CONDITIONING AND SURGE PROTECTION PROJECT, Marathon: FLR10WP05, held by Pedro Falcon Contractors Inc
- 2024-02-15: JIM N NICKS PENSACOLA #2003, Pensacola: FLR20GZ40, held by US General Construction Inc
- 2024-02-15: PALM BEACH ATLANTIC UNIVERSITY BUSINESS SCHOOL, West Palm Beach: FLR20GZ41, held by American Engineering & Development Corporation
- 2024-02-15: HALIFAX PLANTATION, Ormond Beach: FLR20GZ43, held by Pulte Home Group
POWER CONDITIONING AND SURGE PROTECTION PROJECT among its neighbors
Its county: 119, 0 major; FLR10WP03 is minor permit.
Other permits in the county
- 371 9TH, Key Colony Beach: FLG073394, minor, term to 2027-05-15
- 7 MILE MARINE CENTER INC, Marathon: FLR05G694, minor, term to 2013-04-19
- ADS-ISLAMORADA COLLECTION FACILITY, Islamorada: FLR05H680, minor, term to 2019-06-06
- AGUILERA RESIDENCE, Key Largo: FLG073487, minor, term to 2027-10-17
- AGUILERA RESIDENCE, Key Largo: FLR20FU94, minor, term to 2027-10-28
- BAYSIDE MARINA - WORLDWIDE SPORTSMAN, Islamorada: FLR05J395, minor, term to 2030-09-11
- BOOT KEY HARBOR CITY MARINA, Marathon: FLRNEE528, minor, term to 2017-02-08
- CALOOSA COVE MARINA, Islamorada: FLR05G251, minor, term to 2011-12-02
- CALOOSA COVE MARINA, Islamorada: FLR05J096, minor, term to 2028-10-04
- CANALS CULVERT RESTORATION - SANDY COVE CROSSING, Islamorada: FLG074656, minor, term to 2030-10-30
What stands out
- Its term runs 4 years and 365 days, February 15, 2024 to February 14, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | POWER CONDITIONING AND SURGE PROTECTION PROJECT |
|---|---|
| Permittee | Pedro Falcon Contractors Inc |
| NPDES ID | FLR10WP03 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 15, 2024 |
| Expires | February 14, 2029 |
| Agency | Florida Department of Environmental Protection |
| Address | Marathon, FL 33050 |
NPDES FLR10WP03: effluent limits and exceedances
POWER CONDITIONING AND SURGE PROTECTION PROJECT (NPDES FLR10WP03): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10WP03: no pollutant row on file.
NPDES FLR10WP03: inspections, violations and enforcement
NPDES FLR10WP03 (POWER CONDITIONING AND SURGE PROTECTION PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10WP03
NPDES FLR10WP03: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10WP03
NPDES FLR10WP03: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.