NPDES FLR10WR97 · Clean Water Act
NEWBERRY INDUSTRIAL COMPLEX, Newberry, FL: NPDES FLR10WR97 discharge permit, effluent exceedances, inspections, penalties
NEWBERRY INDUSTRIAL COMPLEX, Newberry, Florida: General permit coverage FLR10WR97, held by Newberry Industrial Complex; Construction stormwater; Effective; issued March 30, 2024, term to March 29, 2029, by Florida Department of Environmental Protection.
- January 10, 2025: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
- January 10, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- January 10, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 6,416 were issued before FLR10WR97.
Coverages issued nearest FLR10WR97
- 2024-03-29: ORANGE AVE AT NSLRW C-54 CULVERT REPLACEMENT, Fort Pierce: FLR20HC31, held by PRP Construction Group, LLC
- 2024-03-29: REINHOLD PARCEL 61 PHASE 1, Green Cove Springs: FLR20HC34, held by Jax Utilities Management
- 2024-03-29: MIAKKA GOLF CLUB, Myakka City: FLR20HC37, held by MiakKa Golf Club
- 2024-03-29: 900 INTRACOASTAL, Fort Lauderdale: FLR20HC38, held by 900 Intracoastal LLC
- 2024-03-29: WYNDFIELDS SOUTH PHASE 1B, Wesley Chapel: FLR20HC40, held by Forestar (USA) Real Estate Group, Inc
- 2024-03-30: EGLIN AFB RETURN FACILITY TO FULLY FUNCTIONAL CDC, Eglin Afb: FLR10WS02, held by Tom Hammonds Enterprises, LLC.
- 2024-03-30: ORANGE BLOSSOM RANCH COMMERCIAL, Naples: FLR10WS03, held by Shoppes at Orange Blossom, LLC
- 2024-03-30: PADEL 24, Miami: FLR10WS04, held by Expanza LLC
- 2024-03-30: ANTENNA FACILITY 8967, Panama City Beach: FLR10WS05, held by Barlovento LLC
- 2024-03-30: E911 CALL CENTER, Fort Myers: FLR10WS20, held by Russ Berner Construction, Inc.
NEWBERRY INDUSTRIAL COMPLEX among its neighbors
54 discharge permits are in the Hogtown Creek subwatershed (HUC 030801021103); FLR10WR97 is one. Its county: 216, 2 major; FLR10WR97 is minor permit.
Other permits in the Hogtown Creek subwatershed (HUC 030801021103)
- A MATERIALS NORTH GAINESVILLE PLANT, Gainesville: FLG110870, minor, term to 2024-04-18
- ARCHER PLACE DEVELOPMENT, Gainesville: FLR10WF98, minor, term to 2028-09-17
- ARCHER ROAD MEDICAL BUILDING, Gainesville: FLR20IV98, minor, term to 2030-12-25
- ARREDONDO ESTATES WATER MAIN REPLACEMENT, Gainesville: FLR20GU23, minor, term to 2028-11-18
- AUDEN DMG HULL RD APTS, Gainesville: FLR20HB66, minor, term to 2029-03-16
- BEAZER EAST INC, Gainesville: FLS711462, minor, term to 2021-06-16
- BUTLER BUILDING E 1-3, Gainesville: FLR10VO10, minor, term to 2027-11-03
- BUTLER CENTER CUP, Gainesville: FLR10WT63, minor, term to 2029-04-24
- CELEBRATION POINTE - DISCOVERY VILLAGE, Gainesville: FLR10VJ47, minor, term to 2027-08-24
- CIRCLE K #2721138, Gainesville: FLG073074, minor, term to 2026-06-22
What stands out
- Its term runs 4 years and 364 days, March 30, 2024 to March 29, 2029.
- Its newest dated event on file is a single-event violation on January 10, 2025, 613 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 3 events for it, all in 2025.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NEWBERRY INDUSTRIAL COMPLEX |
|---|---|
| Permittee | Newberry Industrial Complex |
| NPDES ID | FLR10WR97 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 30, 2024 |
| Expires | March 29, 2029 |
| Agency | Florida Department of Environmental Protection |
| Address | Newberry, FL 32669 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Hogtown Creek (HUC 030801021103) |
NPDES FLR10WR97: effluent limits and exceedances
NEWBERRY INDUSTRIAL COMPLEX (NPDES FLR10WR97): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10WR97: no pollutant row on file.
NPDES FLR10WR97: inspections, violations and enforcement
NPDES FLR10WR97: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| January 10, 2025 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
| January 10, 2025 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| January 10, 2025 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES FLR10WR97 (NEWBERRY INDUSTRIAL COMPLEX): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10WR97
NPDES FLR10WR97: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10WR97
NPDES FLR10WR97: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.