NPDES FLR10WW17 · Clean Water Act
WATER SYSTEM REHABILITATION-BREEZESWEPT PARK ESTATES PHASE D, Plantation, FL: NPDES FLR10WW17 discharge permit, effluent exceedances, inspections, penalties
WATER SYSTEM REHABILITATION-BREEZESWEPT PARK ESTATES PHASE D, Plantation, Florida: General permit coverage FLR10WW17, held by ENCO LLC; Construction stormwater; Effective; issued June 10, 2024, term to June 9, 2029, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 7,032 were issued before FLR10WW17. ENCO LLC holds 7 permits in Florida.
Other permits held by ENCO LLC
- CITY OF CORAL GABLES-C-3 CANAL WATERWAY BANK STABILIZATION, Coral Gables: FLR10VV86, issued 2023-03-17
- CITY OF LAUDERDALE LAKES-CANAL 2 BANK STABILIZATION, Lauderdale Lakes: FLR10WE32, issued 2023-08-13
- NW 82ND AVE WATER MAIN REPLACEMENT PHASE I, Lauderhill: FLR10XP01, issued 2025-04-20
- DRAINAGE IMPROVEMENT EAST OF THE TURNPIKE, Lauderhill: FLR10XX63, issued 2025-08-29
- SFWMD CORBETT LEVEE PHASE 2, West Palm Beach: FLR20HG74, issued 2024-05-23
- STORMWATER PUMP STATION #5 REPLACEMENT, Sunrise: FLR20JH39, issued 2026-05-30
Coverages issued nearest FLR10WW17
- 2024-06-09: EMERSON LAKES PHASE 1A, Bradenton: FLR20HH39, held by CBG Florida Builders, LLC
- 2024-06-09: SEVEN JS NORTH, Palm City: FLR20HH41, held by POMA CONSTRUCTION CORP
- 2024-06-09: WATERSTONE PHASE 2 FKA LANGLEY ESTATES PHASE 2A, Mascotte: FLR20HH42, held by LT Langley LLC
- 2024-06-09: PINELLAS PARK SPORTS COMPLEX, Pinellas Park: FLR20HH43, held by Park & Eleazer Construction
- 2024-06-09: SR-64 AND UIHLEIN ROAD ROUNDABOUT, Bradenton: FLR20HI03, held by SMR Northeast LLC
- 2024-06-10: FIELDSTONE SUBDIVISION, Plant City: FLR10WW65, held by Cardel Homes
- 2024-06-10: SOUTH MAIMI PARK, South Miami: FLR10WW66, held by FieldTurf USA, Inc.
- 2024-06-10: PUBLIX 1897, Bradenton: FLR10WW67, held by Publix 1897
- 2024-06-10: MOORE HAVEN ELEMENTARY REPLACEMENT SCHOOL, Moore Haven: FLR10WW68, held by Glades County School Board
- 2024-06-10: BAILEY RESIDENCE NEW CONSTRUCTION, Sebastian: FLR10WW70, held by Asu enterprises
WATER SYSTEM REHABILITATION-BREEZESWEPT PARK ESTATES PHASE D among its neighbors
82 discharge permits are in the North Fork of the New River Canal subwatershed (HUC 030902061203); FLR10WW17 is one. Its county: 936, 40 major; FLR10WW17 is minor permit.
Other permits in the North Fork of the New River Canal subwatershed (HUC 030902061203)
- 05390 - CHICK-FIL-A PLANTATION POINTE, Plantation: FLR10WK91, minor, term to 2028-12-08
- 1111 NW 116 AVE PLANTATION, Plantation: FLR10VK57, minor, term to 2027-09-01
- 1111 NW 116 AVE PLANTATION, Plantation: FLR10WW99, minor, term to 2029-06-14
- 11201_CUFFIA, Plantation: FLR10VO91, minor, term to 2027-11-23
- 11251_CUFFIA, Plantation: FLR10VO93, minor, term to 2027-11-23
- 11701 NW 6TH PLACE, Fort Lauderdale: FLR10YC90, minor, term to 2030-12-12
- 1290 HOME, Plantation: FLR10WP70, minor, term to 2029-02-24
- 2509 SAWGRASS WWTP HEADWORKS INFLUENT LINE IMPR., Sunrise: FLR20IW35, minor, term to 2031-01-07
- 2ND STREET ESTATES, Plantation: FLR20IE31, minor, term to 2030-04-23
- 475 RIVERLAND, Fort Lauderdale: FLR10VN08, minor, term to 2027-10-19
What stands out
- Its term runs 4 years and 364 days, June 10, 2024 to June 9, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WATER SYSTEM REHABILITATION-BREEZESWEPT PARK ESTATES PHASE D |
|---|---|
| Permittee | ENCO LLC |
| NPDES ID | FLR10WW17 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 10, 2024 |
| Expires | June 9, 2029 |
| Agency | Florida Department of Environmental Protection |
| Address | Plantation, FL 33317 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | North Fork of the New River Canal (HUC 030902061203) |
NPDES FLR10WW17: effluent limits and exceedances
WATER SYSTEM REHABILITATION-BREEZESWEPT PARK ESTATES PHASE D (NPDES FLR10WW17): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10WW17: no pollutant row on file.
NPDES FLR10WW17: inspections, violations and enforcement
NPDES FLR10WW17 (WATER SYSTEM REHABILITATION-BREEZESWEPT PARK ESTATES PHASE D): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10WW17
NPDES FLR10WW17: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10WW17
NPDES FLR10WW17: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.