CEDAR CREEK AT DEERPOINT LAKE PHASE III, Southport, FL: NPDES FLR10XE25 discharge permit, effluent exceedances, inspections, penalties

CEDAR CREEK AT DEERPOINT LAKE PHASE III, Southport, Florida: General permit coverage FLR10XE25, held by Adams Homes of NW Florida Inc; Construction stormwater; Effective; issued October 18, 2024, term to October 17, 2029, by Florida Department of Environmental Protection.

Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 8,118 were issued before FLR10XE25. Adams Homes of NW Florida Inc holds 16 permits in Florida.

Other permits held by Adams Homes of NW Florida Inc

Coverages issued nearest FLR10XE25

CEDAR CREEK AT DEERPOINT LAKE PHASE III among its neighbors

8 discharge permits are in the Cedar Creek-Deer Point Lake subwatershed (HUC 031401010502); FLR10XE25 is one. Its county: 397, 7 major; FLR10XE25 is minor permit.

Other permits in the Cedar Creek-Deer Point Lake subwatershed (HUC 031401010502)

What stands out

  • Its term runs 4 years and 364 days, October 18, 2024 to October 17, 2029.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCEDAR CREEK AT DEERPOINT LAKE PHASE III
PermitteeAdams Homes of NW Florida Inc
NPDES IDFLR10XE25
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedOctober 18, 2024
ExpiresOctober 17, 2029
AgencyFlorida Department of Environmental Protection
AddressSouthport, FL 32409
SubwatershedCedar Creek-Deer Point Lake (HUC 031401010502)

NPDES FLR10XE25: effluent limits and exceedances

CEDAR CREEK AT DEERPOINT LAKE PHASE III (NPDES FLR10XE25): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES FLR10XE25: no pollutant row on file.

NPDES FLR10XE25: inspections, violations and enforcement

NPDES FLR10XE25 (CEDAR CREEK AT DEERPOINT LAKE PHASE III): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES FLR10XE25

NPDES FLR10XE25: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR10XE25

NPDES FLR10XE25: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.