NPDES FLR10XS65 · Clean Water Act
LONG LAKE RANCH MASTER INFRASTRUCTURE, Lutz, FL: NPDES FLR10XS65 discharge permit, effluent exceedances, inspections, penalties
LONG LAKE RANCH MASTER INFRASTRUCTURE, Lutz, Florida: General permit coverage FLR10XS65, held by Long Lake Ranch Master Infrastructure; Construction stormwater; Effective; issued June 9, 2025, term to June 8, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 10,340 were issued before FLR10XS65.
Coverages issued nearest FLR10XS65
- 2025-06-09: GATOR'S LANDING, Baker: FLR10XS04, held by Southland Structural Specialist LLC
- 2025-06-09: STOF FUEL STA AND KENNEL, Lakeland: FLR10XS60, held by Cobb Site Development Inc.
- 2025-06-09: SALVIA/BRANDT, Sebastian: FLR10XS62, held by Georg Lauren, Inc
- 2025-06-09: RUBY LAKE SELF STORAGE, Winter Haven: FLR10XS63, held by P.B. Brown
- 2025-06-09: DEBRIS DOG INC PHASE II, Jupiter: FLR10XS64, held by Debris Dog Inc
- 2025-06-09: BISCAYNE BLVD AND FEDERAL HWY, Miami: FLR10XS66, held by HSQ Group, LLC
- 2025-06-09: BARRINGTON SUBDIVISION, Brandon: FLR10XS67, held by Homes by WestBay, LLC
- 2025-06-09: SULZBACHER ENTERPRISE VILLAGE, Jacksonville: FLR20IH76, held by Allsite Contracting, Inc.
- 2025-06-09: GROVE AT BERRYHILL, Milton: FLR20IH77, held by D.R. Horton, Inc.
- 2025-06-09: STERLING QUADRANGLE - STUDENT HOUSING, Orlando: FLR20IH78, held by DIN/CAL 4, INC.
LONG LAKE RANCH MASTER INFRASTRUCTURE among its neighbors
88 discharge permits are in the Upper Anclote River subwatershed (HUC 031002070501); FLR10XS65 is one. Its county: 700, 1 major; FLR10XS65 is minor permit.
Other permits in the Upper Anclote River subwatershed (HUC 031002070501)
- 2203 GUNN HIGHWAY, Odessa: FLR10YJ94, minor, term to 2031-04-09
- 4 AND COMPANY, Land O Lakes: FLR20EW41, minor, term to 2026-10-17
- 7-ELEVEN 42163, Lutz: FLG073501, minor, term to 2027-10-18
- ALTIS GRAND AT SUNCOAST, Lutz: FLR10UX24, minor, term to 2027-01-19
- ALTIS SUNCOAST MASTER INFRASTRUCTURE, Lutz: FLR20ET21, minor, term to 2026-09-11
- AMAZON DTP3 PASCO COUNTY FL, Land O Lakes: FLR05I810, minor, term to 2027-03-24
- ANDY'S FROZEN CUSTARD, Lutz: FLR05J073, minor, term to 2028-08-25
- ANDY'S FROZEN CUSTARD, Lutz: FLR10WG29, minor, term to 2028-09-22
- ANGELINE 6A, Land O Lakes: FLR10YI61, minor, term to 2031-03-27
- ASTURIA, Odessa: FLR10PP59, minor, term to 2020-10-21
What stands out
- Its term runs 4 years and 364 days, June 9, 2025 to June 8, 2030.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | LONG LAKE RANCH MASTER INFRASTRUCTURE |
|---|---|
| Permittee | Long Lake Ranch Master Infrastructure |
| NPDES ID | FLR10XS65 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 9, 2025 |
| Expires | June 8, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Lutz, FL 33558 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Upper Anclote River (HUC 031002070501) |
NPDES FLR10XS65: effluent limits and exceedances
LONG LAKE RANCH MASTER INFRASTRUCTURE (NPDES FLR10XS65): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10XS65: no pollutant row on file.
NPDES FLR10XS65: inspections, violations and enforcement
NPDES FLR10XS65 (LONG LAKE RANCH MASTER INFRASTRUCTURE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10XS65
NPDES FLR10XS65: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10XS65
NPDES FLR10XS65: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.