NPDES FLR10XX91 · Clean Water Act
SW 44TH AND 46TH AVE 4 LANE EXPANSION PHASE 3, Ocala, FL: NPDES FLR10XX91 discharge permit, effluent exceedances, inspections, penalties
SW 44TH AND 46TH AVE 4 LANE EXPANSION PHASE 3, Ocala, Florida: General permit coverage FLR10XX91, held by SW 44th and 46th Ave 4 Lane Expansion Phase 3; Construction stormwater; Effective; issued September 8, 2025, term to September 7, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,300 were issued before FLR10XX91.
Coverages issued nearest FLR10XX91
- 2025-09-07: SOUTH DAVENPORT MOB, Davenport: FLR20IO43, held by Hembree Construction
- 2025-09-07: BEV SMITH KIA, Fort Pierce: FLR20IO44, held by Bev Smith Kia
- 2025-09-08: SIRATA BEACH RESORT NEW POOL, KITCHEN & RESTAURANT, St Pete Beach: FLR10XX76, held by CP St Pete LLC
- 2025-09-08: NATURE TRAIL, CEDAR TRAIL, MAPLE TRAIL BESS, Glen Saint Mary: FLR10XX89, held by Moss & Associates, LLC
- 2025-09-08: LITTLE ROAD MEDIANS LANDSCAPE IRRIGATION PROJECT, New Port Richey: FLR10XX90, held by Arazoza Brothers Corp
- 2025-09-08: MIRADA, San Antonio: FLR10XX92, held by Ryan Homes
- 2025-09-08: NW 60TH STREET (CONTRACT NO. S-15152), Miami: FLR10XX93, held by JVA Engineering Contractors
- 2025-09-08: HOPE CHILDRENS, Thonotosassa: FLR10XX94, held by Dallas 1 Corporation
- 2025-09-08: MIRAMAR COVE, Miramar: FLR10XY24, held by Sunbeam Development Corp
- 2025-09-08: WINDHAM PARK, Winter Garden: FLR20IN88, held by Beazer Homes LLC
SW 44TH AND 46TH AVE 4 LANE EXPANSION PHASE 3 among its neighbors
Its county: 344, 0 major; FLR10XX91 is minor permit.
Other permits in the county
- 23028 - SW 44TH AVE WIDENING PH 1B, Ocala: FLR20GY28, minor, term to 2029-01-28
- 4-H EQUITIES SITE PLAN, Ocala: FLR10WN88, minor, term to 2029-01-19
- 412 BIOSOLIDS PROCESSING FACILITY, Ocala: FLL356697, minor, term to 2025-12-31
- 41941 7-ELEVEN 42ND ST, Ocala: FLR10UU97, minor, term to 2026-12-09
- 49TH SW COURT ROAD PHASE 1A, Ocala: FLR10UU20, minor, term to 2026-11-24
- 7-11 US 301 SUMMERFIELD, Summerfield: FLR20HC29, minor, term to 2029-03-28
- AAA COOPER TRANSPORTATION, Ocala: FLR05J048, minor, term to 2028-06-29
- ABF FREIGHT SYSTEM, INC., Ocala: FLRNEF282, minor, term to 2025-02-23
- AC MARRIOTT HOTEL, Ocala: FLR20ID98, minor, term to 2030-04-19
- ADVANCE AUTO PARTS, Ocala: FLR10WU76, minor, term to 2029-05-15
What stands out
- Its term runs 4 years and 364 days, September 8, 2025 to September 7, 2030.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SW 44TH AND 46TH AVE 4 LANE EXPANSION PHASE 3 |
|---|---|
| Permittee | SW 44th and 46th Ave 4 Lane Expansion Phase 3 |
| NPDES ID | FLR10XX91 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 8, 2025 |
| Expires | September 7, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Ocala, FL 34474 |
| Receiving water impaired | 303(D) Listed |
NPDES FLR10XX91: effluent limits and exceedances
SW 44TH AND 46TH AVE 4 LANE EXPANSION PHASE 3 (NPDES FLR10XX91): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10XX91: no pollutant row on file.
NPDES FLR10XX91: inspections, violations and enforcement
NPDES FLR10XX91 (SW 44TH AND 46TH AVE 4 LANE EXPANSION PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10XX91
NPDES FLR10XX91: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10XX91
NPDES FLR10XX91: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.