NPDES FLR10XY78 · Clean Water Act
CATALYST AT GOULDS, Miami, FL: NPDES FLR10XY78 discharge permit, effluent exceedances, inspections, penalties
CATALYST AT GOULDS, Miami, Florida: General permit coverage FLR10XY78, held by D1-Call 305.322.0834 LLC; Construction stormwater; Effective; issued September 19, 2025, term to September 18, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,415 were issued before FLR10XY78.
Coverages issued nearest FLR10XY78
- 2025-09-19: KEITH SLOANE RESIDENCE, Fellsmere: FLR10XY50, held by Keith Sloane Residence
- 2025-09-19: REPAIR OF CR 661 OVER BUNKER CREEK, Arcadia: FLR10XY51, held by Desoto County BOCC
- 2025-09-19: JOSE PEREZ, Fellsmere: FLR10XY52, held by Jose Perez
- 2025-09-19: HOWARD F. CURREN AWTP, Tampa: FLR10XY53, held by Reliable Tampa Partners
- 2025-09-19: THE RESERVE AT HAMMOCK OAKS, Lady Lake: FLR10XY54, held by Meritage Homes of Florida, Inc.
- 2025-09-19: ABBY CROSSING TH, San Antonio: FLR20IO90, held by Lennar Homes LLC
- 2025-09-19: CHASE BANK FT. PIERCE, Fort Pierce: FLR20IP24, held by Accelerated Construction Services
- 2025-09-19: CITY OF PORT ST LUCIE A-16 WATER CONTROL STRUCTURE, Port Saint Lucie: FLR20IP26, held by Douglas N. Higgins, INC.
- 2025-09-19: ZAXBYS 0103, Jacksonville: FLR20IP27, held by DNS Contracting L.L.C.
- 2025-09-19: CHIPOTLE SHELL AND SITE MARTIN DOWNS, Palm City: FLR20IP28, held by PRP Construction Group, LLC
CATALYST AT GOULDS among its neighbors
44 discharge permits are in the Black Creek Canal subwatershed (HUC 030902061602); FLR10XY78 is one. Its county: 1,003, 37 major; FLR10XY78 is minor permit.
Other permits in the Black Creek Canal subwatershed (HUC 030902061602)
- AHS OLD CUTLER NORTH, Miami: FLR10UV39, minor, term to 2026-12-01
- AHS OLD CUTLER SOUTH, Miami: FLR10UV41, minor, term to 2026-12-01
- AUDI SOUTH, Palmetto Bay: FLR10UX93, minor, term to 2027-01-29
- AVALON KENDALL, Miami: FLR10XT65, minor, term to 2030-06-27
- BAY POINTE APARTMENTS, Miami: FLR10VG59, minor, term to 2027-06-11
- BECKMAN COULTER KENDALL FACILITY, Miami: FLR05J104, minor, term to 2028-10-19
- BLACK POINT WASTEWATER TREATMENT PLANT, Cutler Bay: FLR20HC78, minor, term to 2029-04-03
- BLUE HERON PARK, Miami: FLR10YC30, minor, term to 2030-12-04
- CAPISTRANO, Cutler Bay: FLR20HR27, minor, term to 2029-11-06
- CENTRAL CONCRETE SUPERMIX - PERRINE, Miami: FLG110458, minor, term to 2021-09-27
What stands out
- Its term runs 4 years and 364 days, September 19, 2025 to September 18, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CATALYST AT GOULDS |
|---|---|
| Permittee | D1-Call 305.322.0834 LLC |
| NPDES ID | FLR10XY78 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 19, 2025 |
| Expires | September 18, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Miami, FL 33170 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Black Creek Canal (HUC 030902061602) |
NPDES FLR10XY78: effluent limits and exceedances
CATALYST AT GOULDS (NPDES FLR10XY78): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10XY78: no pollutant row on file.
NPDES FLR10XY78: inspections, violations and enforcement
NPDES FLR10XY78 (CATALYST AT GOULDS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10XY78
NPDES FLR10XY78: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10XY78
NPDES FLR10XY78: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.