BRIDGE REPLACEMENT KLONDIKE ROAD AT UNNAMED BRANCH, Pensacola, FL: NPDES FLR10YJ12 discharge permit, effluent exceedances, inspections, penalties

BRIDGE REPLACEMENT KLONDIKE ROAD AT UNNAMED BRANCH, Pensacola, Florida: General permit coverage FLR10YJ12, held by Murphree Bridge Corporation; Construction stormwater; Effective; issued March 29, 2026, term to March 28, 2031, by Florida Department of Environmental Protection.

  • July 22, 2026: Notice of Noncompliance Issued (State).
  • June 24, 2026: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
  • June 24, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • June 24, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • June 24, 2026: Evaluation (S).

Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 13,558 were issued before FLR10YJ12. Murphree Bridge Corporation holds 7 permits in Florida.

Other permits held by Murphree Bridge Corporation

Coverages issued nearest FLR10YJ12

BRIDGE REPLACEMENT KLONDIKE ROAD AT UNNAMED BRANCH among its neighbors

67 discharge permits are in the Elevenmile Creek subwatershed (HUC 031401070101); FLR10YJ12 is one.

Other permits in the Elevenmile Creek subwatershed (HUC 031401070101)

What stands out

  • Its term runs 4 years and 364 days, March 29, 2026 to March 28, 2031.
  • Its newest dated event on file is an informal enforcement action on July 22, 2026, 55 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 3 single-event violations, 1 inspection, 1 informal enforcement action.
  • EPA's file dates 5 events for it, all in 2026.
  • It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityBRIDGE REPLACEMENT KLONDIKE ROAD AT UNNAMED BRANCH
PermitteeMurphree Bridge Corporation
NPDES IDFLR10YJ12
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMarch 29, 2026
ExpiresMarch 28, 2031
AgencyFlorida Department of Environmental Protection
AddressPensacola, FL 32526
Receiving water impaired303(D) Listed
SubwatershedElevenmile Creek (HUC 031401070101)

NPDES FLR10YJ12: effluent limits and exceedances

BRIDGE REPLACEMENT KLONDIKE ROAD AT UNNAMED BRANCH (NPDES FLR10YJ12): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES FLR10YJ12: no pollutant row on file.

NPDES FLR10YJ12: inspections, violations and enforcement

NPDES FLR10YJ12: 3 single-event violations

DateWhat EPA recordedAgency
June 24, 2026WW Storm Water Construction - Failure to Implement SWPPP/SWMPST6
June 24, 2026WW Storm Water Construction - Failure to properly operate and maintain BMPsST6
June 24, 2026WW Storm Water Construction - Failure to properly install/implement BMPsST6

NPDES FLR10YJ12: 1 inspection

DateWhat EPA recordedAgency
June 24, 2026EvaluationS

NPDES FLR10YJ12: 1 informal enforcement action

DateWhat EPA recordedAgency
July 22, 2026Notice of Noncompliance IssuedState

NPDES FLR10YJ12 (BRIDGE REPLACEMENT KLONDIKE ROAD AT UNNAMED BRANCH): no formal enforcement action on file.

Watch NPDES FLR10YJ12

NPDES FLR10YJ12: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR10YJ12

NPDES FLR10YJ12: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded September 15, 2026.