NPDES FLR10YK40 · Clean Water Act
PALMS AT WATERFORD LAKES, Orlando, FL: NPDES FLR10YK40 discharge permit, effluent exceedances, inspections, penalties
PALMS AT WATERFORD LAKES, Orlando, Florida: General permit coverage FLR10YK40, held by Dream Finders Homes; Construction stormwater; Effective; issued April 17, 2026, term to April 16, 2031, by Florida Department of Environmental Protection.
- June 16, 2026: Notice of Noncompliance Issued (State).
- June 1, 2026: WW Storm Water Construction - Failure to Maintain Records (ST6).
- June 1, 2026: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- June 1, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 13,830 were issued before FLR10YK40. Dream Finders Homes holds 12 permits in Florida.
Other permits held by Dream Finders Homes
- PARRISH LAKES PHASE IIA, Palmetto: FLR10WO52, issued 2024-02-09
- BUNGALOW WALK, Sarasota: FLR10WX29, issued 2024-06-20
- ANGELINE - CANOPY OAKS, Land O Lakes: FLR10XB10, issued 2024-08-16
- RESERVE AT HAMMOCK OAKS, Lady Lake: FLR10XQ07, issued 2025-04-28
- WILLOWBROOKE, Winter Haven: FLR10XQ08, issued 2025-04-28
- WYLDER, Port Saint Lucie: FLR10XS53, issued 2025-06-07
- TUSCAN HILLS, Dade City: FLR10XW77, issued 2025-08-16
- MIRADA TOWNHOMES, San Antonio: FLR10XX04, issued 2025-08-22
- SEAIRE PHASE III (A-G), Parrish: FLR10YA54, issued 2025-10-30
- HAMLIN MEADOWS, Winter Garden: FLR10YB53, issued 2025-11-15
Coverages issued nearest FLR10YK40
- 2026-04-16: UNION AVE STORMWATER IMPROVMENTS, Panama City: FLR20JE20, held by Gulf Coast Utility Contractors
- 2026-04-17: INTERSECTION OF S. POWERLINE RD SW 2ND CT, Deerfield Beach: FLR10YK36, held by FG Construction
- 2026-04-17: FACILITY 49639 PARKING LOT EXPANSION, Cape Canaveral: FLR10YK37, held by General Mechanical
- 2026-04-17: E-ONE INC, Ocala: FLR10YK38, held by Brady Construction of Ocala Inc
- 2026-04-17: MIA1 TRAILER YARD EXPANSION, Opa Locka: FLR10YK39, held by Miami Dade County Aviation Department
- 2026-04-17: HAWTHORNE PHASE 4, Lakeland: FLR10YK43, held by D.R. Horton Inc.
- 2026-04-17: IMMOKALEE HS - PF/BB/SB, Immokalee: FLR10YK45, held by Hellas Construction, Inc.
- 2026-04-17: LAKE HILDA DAM REPAIRS, Panama City: FLR20JE21, held by Gulf Coast Utility Contractors
- 2026-04-17: PROJECT BEARS 4PSL - BUILDING 3A, Port Saint Lucie: FLR20JE22, held by Miller Construction Company
- 2026-04-17: PROJECT BEARS 4PSL - MASS GRADING, Port Saint Lucie: FLR20JE23, held by Miller Construction Company
Other permits in Orlando
- 0158 - E52F4 SR50 - FDOT, Orlando: FLR10XJ20, minor, term to 2030-01-16
- 1111S SEMORAN EXPANSION, Orlando: FLR10VO19, minor, term to 2027-11-09
- 1600 PEPPER GRASS CT, Orlando: FLG074758, minor, term to 2031-01-15
- 1955 PEEL AVE TOWNHOMES, Orlando: FLR10VL60, minor, term to 2027-09-18
- 240170_UCF WEST TOWER PROJECT, Orlando: FLR10XL52, minor, term to 2030-02-08
- 24E MG, Orlando: FLR20IG74, minor, term to 2030-05-23
- 3 S SUPPORT, Orlando: FLR10YB85, minor, term to 2030-11-21
- 3009 W OAKRIDGE RD, Orlando: FLR10VA05, minor, term to 2027-03-06
- 335 CENTRAL FLORIDA PKWY IOS, Orlando: FLR20HX36, minor, term to 2030-02-02
- 3509 S. ORANGE AVENUE, Orlando: FLR10UQ45, minor, term to 2026-09-26
What stands out
- Its term runs 4 years and 364 days, April 17, 2026 to April 16, 2031.
- Its newest dated event on file is an informal enforcement action on June 16, 2026, 120 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 2 single-event violations, 1 inspection, 1 informal enforcement action.
- EPA's file dates 4 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PALMS AT WATERFORD LAKES |
|---|---|
| Permittee | Dream Finders Homes |
| NPDES ID | FLR10YK40 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 17, 2026 |
| Expires | April 16, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Orlando, FL 32828 |
NPDES FLR10YK40: effluent limits and exceedances
PALMS AT WATERFORD LAKES (NPDES FLR10YK40): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YK40: no pollutant row on file.
NPDES FLR10YK40: inspections, violations and enforcement
NPDES FLR10YK40: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| June 1, 2026 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| June 1, 2026 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
NPDES FLR10YK40: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| June 1, 2026 | Evaluation | S |
NPDES FLR10YK40: 1 informal enforcement action
| Date | What EPA recorded | Agency |
|---|---|---|
| June 16, 2026 | Notice of Noncompliance Issued | State |
NPDES FLR10YK40 (PALMS AT WATERFORD LAKES): no formal enforcement action on file.
Watch NPDES FLR10YK40
NPDES FLR10YK40: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YK40
NPDES FLR10YK40: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.