NPDES FLR10YO30 · Clean Water Act
FIDDLERS GLENN PHASE 2 3, Panama City, FL: NPDES FLR10YO30 discharge permit, effluent exceedances, inspections, penalties
FIDDLERS GLENN PHASE 2 3, Panama City, Florida: General permit coverage FLR10YO30, held by TS Construction Solutions LLC; Construction stormwater; Effective; issued June 25, 2026, term to June 24, 2031, by Florida Department of Environmental Protection.
- July 10, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- July 10, 2026: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- July 10, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,711 were issued before FLR10YO30. TS Construction Solutions LLC holds 3 permits in Florida.
Other permits held by TS Construction Solutions LLC
- SUZUKI TESTING FACILITY PHASE 1.5 DYNO BUILDING, Panama City: FLR10YG70, issued 2026-02-20
- TITUS PARK PHASE 4, Panama City: FLR20IZ75, issued 2026-02-20
Coverages issued nearest FLR10YO30
- 2026-06-22: PONCE ISLAND COMMERCIAL, Saint Augustine: FLR20JJ21, held by 4C S Trucking and Excavation Inc.
- 2026-06-22: RAISING CANE'S #1333 HIALEAH, FL, Hialeah: FLR20JJ22, held by Frontier Building
- 2026-06-22: O'REILLY AUTO PARTS, Eustis: FLR20JJ23, held by Great Southern Constructors, LLC
- 2026-06-22: E8V59 OBRIEN ROAD TO US27 TURNPIKE WIDENING, Groveland: FLR20JJ24, held by Jr Davis Construction Company Inc
- 2026-06-24: INB HOMES TUMBLESON, Saint Cloud: FLR20JJ25, held by INB Homes
- 2026-06-25: HOPE CENTENNIAL SCHOOL PARKING, West Palm Beach: FLR10YO45, held by Stanford Sons Trucking Corp
- 2026-06-25: SOUTHWOOD DUNKIN DONUTS, Tallahassee: FLR10YO46, held by Southwood Dunkin Donuts
- 2026-06-25: LONGLEAF PHASE 3 4, New Port Richey: FLR10YO47, held by Lennar Homes, LLC
- 2026-06-25: PATTERSON RESIDENCE, Sebring: FLR10YO48, held by Patterson Residence
- 2026-06-25: OTOW UTILITY OPERATIONS CENTER, Ocala: FLR10YO49, held by Ciraco Underground, Inc.
FIDDLERS GLENN PHASE 2 3 among its neighbors
156 discharge permits are in the Mill Bayou-Watsons Bayou Frontal subwatershed (HUC 031401010901); FLR10YO30 is one. Its county: 397, 7 major; FLR10YO30 is minor permit.
Other permits in the Mill Bayou-Watsons Bayou Frontal subwatershed (HUC 031401010901)
- 1211 LINDENWOOD DR, Panama City: FLG073355, minor, term to 2027-03-17
- 1600 LINDENWOOD, Panama City: FLG073460, minor, term to 2027-08-18
- 225 BALDWIN ROAD, Panama City: FLR10WJ00, minor, term to 2028-11-02
- 23RDS ST., Panama City: FLR10VP25, minor, term to 2027-12-03
- ACMT INC., Lynn Haven: FLRNEF731, minor, term to 2026-05-05
- AIRFIELD MARKINGS/RUBBER REMOVAL-003, Panama City: FLR10YK20, minor, term to 2031-04-11
- ALPHA DEWATERING 3101 W 23RD ST VACANT LOT, Panama City: FLG074113, minor, term to 2029-07-24
- AMI AIRPORT DRIVE, Panama City: FLR10WR59, minor, term to 2029-03-22
- AREA D-15, Panama City: FLR20IN47, minor, term to 2030-08-27
- AUTOZONE, Panama City: FLR10XW17, minor, term to 2030-08-06
What stands out
- Its term runs 4 years and 364 days, June 25, 2026 to June 24, 2031.
- Its newest dated event on file is single-event violation and inspection on July 10, 2026, 67 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 2 single-event violations, 1 inspection.
- EPA's file dates 3 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FIDDLERS GLENN PHASE 2 3 |
|---|---|
| Permittee | TS Construction Solutions LLC |
| NPDES ID | FLR10YO30 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 25, 2026 |
| Expires | June 24, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Panama City, FL 32404 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mill Bayou-Watsons Bayou Frontal (HUC 031401010901) |
NPDES FLR10YO30: effluent limits and exceedances
FIDDLERS GLENN PHASE 2 3 (NPDES FLR10YO30): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YO30: no pollutant row on file.
NPDES FLR10YO30: inspections, violations and enforcement
NPDES FLR10YO30: 2 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| July 10, 2026 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| July 10, 2026 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
NPDES FLR10YO30: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| July 10, 2026 | Evaluation | S |
NPDES FLR10YO30 (FIDDLERS GLENN PHASE 2 3): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10YO30
NPDES FLR10YO30: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YO30
NPDES FLR10YO30: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.