Velarion Records
Free: one email when NPDES FLR10YO30 changes. Unsubscribe any time.

NPDES FLR10YO30 · Clean Water Act

FIDDLERS GLENN PHASE 2 3, Panama City, FL: NPDES FLR10YO30 discharge permit, effluent exceedances, inspections, penalties

FIDDLERS GLENN PHASE 2 3, Panama City, Florida: General permit coverage FLR10YO30, held by TS Construction Solutions LLC; Construction stormwater; Effective; issued June 25, 2026, term to June 24, 2031, by Florida Department of Environmental Protection.

  • July 10, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • July 10, 2026: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • July 10, 2026: Evaluation (S).

Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,711 were issued before FLR10YO30. TS Construction Solutions LLC holds 3 permits in Florida.

Other permits held by TS Construction Solutions LLC

Coverages issued nearest FLR10YO30

FIDDLERS GLENN PHASE 2 3 among its neighbors

156 discharge permits are in the Mill Bayou-Watsons Bayou Frontal subwatershed (HUC 031401010901); FLR10YO30 is one. Its county: 397, 7 major; FLR10YO30 is minor permit.

Other permits in the Mill Bayou-Watsons Bayou Frontal subwatershed (HUC 031401010901)

What stands out

  • Its term runs 4 years and 364 days, June 25, 2026 to June 24, 2031.
  • Its newest dated event on file is single-event violation and inspection on July 10, 2026, 67 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 2 single-event violations, 1 inspection.
  • EPA's file dates 3 events for it, all in 2026.
  • It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityFIDDLERS GLENN PHASE 2 3
PermitteeTS Construction Solutions LLC
NPDES IDFLR10YO30
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedJune 25, 2026
ExpiresJune 24, 2031
AgencyFlorida Department of Environmental Protection
AddressPanama City, FL 32404
Receiving water impaired303(D) Listed
SubwatershedMill Bayou-Watsons Bayou Frontal (HUC 031401010901)

NPDES FLR10YO30: effluent limits and exceedances

FIDDLERS GLENN PHASE 2 3 (NPDES FLR10YO30): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES FLR10YO30: no pollutant row on file.

NPDES FLR10YO30: inspections, violations and enforcement

NPDES FLR10YO30: 2 single-event violations

DateWhat EPA recordedAgency
July 10, 2026WW Storm Water Construction - Failure to properly install/implement BMPsST6
July 10, 2026WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6

NPDES FLR10YO30: 1 inspection

DateWhat EPA recordedAgency
July 10, 2026EvaluationS

NPDES FLR10YO30 (FIDDLERS GLENN PHASE 2 3): no formal enforcement action and informal enforcement action on file.

Watch NPDES FLR10YO30

NPDES FLR10YO30: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES FLR10YO30

NPDES FLR10YO30: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.