NPDES FLR10YO61 · Clean Water Act
WREC EHREN CUTOFF ELECTRICAL SUBSTATION, Land O Lakes, FL: NPDES FLR10YO61 discharge permit, effluent exceedances, inspections, penalties
WREC EHREN CUTOFF ELECTRICAL SUBSTATION, Land O Lakes, Florida: General permit coverage FLR10YO61, held by Southern Site Power Construction; Construction stormwater; Effective; issued June 27, 2026, term to June 26, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 14,759 were issued before FLR10YO61. Southern Site Power Construction holds 2 permits in Florida.
Other permits held by Southern Site Power Construction
- WISTERIA TOWNHOMES, Deland: FLR10YK50, issued 2026-04-18
Coverages issued nearest FLR10YO61
- 2026-06-26: DEERING PARK PHASE 1-2, Edgewater: FLR20JJ55, held by Hazen Construction
- 2026-06-26: THE BREAKERS FAMILY ENTERTAINMENT CENTER, Palm Beach: FLR20JJ56, held by The Breakers Palm Beach, Inc.
- 2026-06-26: ACCOLADES GROVE BLOSSOM ROAD, Winter Garden: FLR20JJ57, held by The Briar Team, LLC
- 2026-06-26: CITY PARK PHASE I, Bradenton: FLR20JJ58, held by Tandem Construction
- 2026-06-27: CITY OF LAKELAND FIRE STATION 8, Winter Haven: FLR10YO60, held by GARNER COMPLETESITE
- 2026-06-27: SEMINOLE TRACE (FKA CASCADES AT GRAND LANDING), Palm Coast: FLR10YO62, held by NVR, Inc. (dba Ryan Homes)
- 2026-06-27: HOLLOW T LLC, Wellington: FLR10YO63, held by IDA Development LLC
- 2026-06-27: HILLCREST, San Antonio: FLR10YO64, held by Taylor Morrison
- 2026-06-27: SR869/SW 10TH FROM FL TURNPIKE TO WEST OF I-95, Deerfield Beach: FLR10YO65, held by Archer Western Construction, LLC
- 2026-06-27: VERTICE RIVERSIDE, Miami: FLR10YO66, held by RIVERSIDE LIVING, LLC
Other permits in Land O Lakes
- 4 AND COMPANY, Land O Lakes: FLR20EW41, minor, term to 2026-10-17
- ACADEMY AT THE LAKES, Land O Lakes: FLR20GZ68, minor, term to 2029-02-11
- ALTERA AT SHETTLE, Land O Lakes: FLG074111, minor, term to 2029-07-22
- AMAZON DTP3 PASCO COUNTY FL, Land O Lakes: FLR05I810, minor, term to 2027-03-24
- ANGELINE - CANOPY OAKS, Land O Lakes: FLR10XB10, minor, term to 2029-08-15
- ANGELINE 4B, 4C, 4D, Land O Lakes: FLR10XA56, minor, term to 2029-08-07
- ANGELINE 6A, Land O Lakes: FLR10YI61, minor, term to 2031-03-27
- ANGELINE 6I, Land O Lakes: FLR20JA57, minor, term to 2031-02-28
- ANGELINE AA 2A, 2B, 2C, Land O Lakes: FLR10XF87, minor, term to 2029-11-10
- ANGELINE COLLECTOR ROAD, Land O Lakes: FLR20IZ55, minor, term to 2031-02-15
What stands out
- Its term runs 4 years and 364 days, June 27, 2026 to June 26, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WREC EHREN CUTOFF ELECTRICAL SUBSTATION |
|---|---|
| Permittee | Southern Site Power Construction |
| NPDES ID | FLR10YO61 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 27, 2026 |
| Expires | June 26, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Land O Lakes, FL 34639 |
NPDES FLR10YO61: effluent limits and exceedances
WREC EHREN CUTOFF ELECTRICAL SUBSTATION (NPDES FLR10YO61): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YO61: no pollutant row on file.
NPDES FLR10YO61: inspections, violations and enforcement
NPDES FLR10YO61 (WREC EHREN CUTOFF ELECTRICAL SUBSTATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10YO61
NPDES FLR10YO61: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YO61
NPDES FLR10YO61: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.