NPDES FLR10YR80 · Clean Water Act
SANDY CLAY, Belleview, FL: NPDES FLR10YR80 discharge permit, effluent exceedances, inspections, penalties
SANDY CLAY, Belleview, Florida: General permit coverage FLR10YR80, held by Sandy Clay; Construction stormwater; Effective; issued August 24, 2026, term to August 23, 2031, by Florida Department of Environmental Protection.
- August 28, 2026: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
- August 28, 2026: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- August 28, 2026: WW Storm Water Construction - Failure to Maintain Records (ST6).
- August 28, 2026: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- August 28, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- August 28, 2026: WW Storm Water Construction - CWA §308 Failure to submit required permit application information (ST6).
- August 28, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- August 28, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 15,452 were issued before FLR10YR80.
Coverages issued nearest FLR10YR80
- 2026-08-23: SAVE A LIFE PET RESCUE, Sanford: FLR20JN48, held by Bespoke Contractors LLC
- 2026-08-23: SEVEN SHORES APARTMENTS, Naples: FLR20JN87, held by Shoreline SSG LLC
- 2026-08-24: SKYWORKS OCALA, Ocala: FLR10YR77, held by Cullison Wright Construction
- 2026-08-24: LAURELTON (FKA GOVERNORS PARK PH 1A), Green Cove Springs: FLR10YR78, held by Perry Homes of Florida, LLC
- 2026-08-24: GALLERY AT WAGNER CREEK, Miami: FLR10YR79, held by Gallery at Wagner Creek, LLC
- 2026-08-24: REFLECTIONS AT OLYMPUS, Clermont: FLR10YR81, held by David Weekley Homes, LLC
- 2026-08-24: FLORIDA INTERNATIONAL UNIVERSITY, Miami: FLR10YR82, held by Thornton Construction
- 2026-08-24: OLUSTEE BATTLEFIELD HISTORIC STATE PARK-VISITORS CENTER, Sanderson: FLR10YS06, held by Charles Perry Partners Inc
- 2026-08-24: THE RESERVE AT POMELO, Orlando: FLR20JN50, held by Brockman Site Development
- 2026-08-24: COLLINS ROAD OUTPARCELS, Jacksonville: FLR20JN51, held by W. Gardner, LLC
Other permits in Belleview
- 7-ELEVEN BELLEVIEW STORE #42709, Belleview: FLR20IS37, minor, term to 2030-11-07
- ALICYS BELLEVIEW STORAGE, Belleview: FLR10YN52, minor, term to 2031-06-07
- AUTUMN GLEN PHASE 2, Belleview: FLR10XB70, minor, term to 2029-08-28
- BELLEHAVEN AMENITY, Belleview: FLR10YQ18, minor, term to 2031-07-23
- BELLEHAVEN PHASE 2, Belleview: FLR10YL15, minor, term to 2031-04-29
- BELLEHAVEN PHASE 3, Belleview: FLR10YI32, minor, term to 2031-03-15
- BELLEVIEW, Belleview: FLR10XI33, minor, term to 2030-01-04
- BELLEVIEW WAREHOUSE, Belleview: FLR20JB11, minor, term to 2031-03-06
- BIG SUN AUTO SALVAGE, Belleview: FLR05G741, minor, term to 2013-09-24
- CITIZENS FIRST BANK - BELLEVIEW, Belleview: FLR10UR40, minor, term to 2026-10-15
What stands out
- Its term runs 4 years and 364 days, August 24, 2026 to August 23, 2031.
- Its newest dated event on file is single-event violation and inspection on August 28, 2026, 18 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 7 single-event violations, 1 inspection.
- EPA's file dates 8 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SANDY CLAY |
|---|---|
| Permittee | Sandy Clay |
| NPDES ID | FLR10YR80 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 24, 2026 |
| Expires | August 23, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Belleview, FL 34420 |
NPDES FLR10YR80: effluent limits and exceedances
SANDY CLAY (NPDES FLR10YR80): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YR80: no pollutant row on file.
NPDES FLR10YR80: inspections, violations and enforcement
NPDES FLR10YR80: 7 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| August 28, 2026 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
| August 28, 2026 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| August 28, 2026 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| August 28, 2026 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
| August 28, 2026 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| August 28, 2026 | WW Storm Water Construction - CWA §308 Failure to submit required permit application information | ST6 |
| August 28, 2026 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
NPDES FLR10YR80: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| August 28, 2026 | Evaluation | S |
NPDES FLR10YR80 (SANDY CLAY): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10YR80
NPDES FLR10YR80: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YR80
NPDES FLR10YR80: 0 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.