Clean Water Act discharge permit · NPDES FLR20GS79
THREE HOLLOW EAST, Milton, FL: NPDES FLR20GS79 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
THREE HOLLOW EAST, held by Roads Inc of NWF, holds NPDES permit FLR20GS79. EPA’s file records it issued October 27, 2023 and expiring October 26, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for THREE HOLLOW EAST: its NPDES ID, its permit type and status, its dates, its address in Milton, Florida. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES FLR20GS79.
What stands out
- Its term runs 4 years and 365 days, October 27, 2023 to October 26, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | THREE HOLLOW EAST |
|---|---|
| Permittee as filed | Roads Inc of NWF |
| NPDES ID | FLR20GS79 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | October 27, 2023 |
| Expiration date | October 26, 2028 |
| Issuing agency | Florida Department of Environmental Protection |
| Address | Milton, FL 32570 |
| Subwatershed | Upper Pond Creek-Blackwater River (HUC 031401040501) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR20GS79.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES FLR20GS79.
Inspections
EPA’s inspection file holds no inspection for NPDES FLR20GS79.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES FLR20GS79.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR20GS79.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR20GS79 there.
THREE HOLLOW EAST, Milton, Florida: Coverage under a general permit FLR20GS79, held by Roads Inc of NWF; Construction stormwater; Effective; issued October 27, 2023, term to October 26, 2028, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 5,309 were issued before FLR20GS79. Roads Inc of NWF holds 10 permits in Florida.
Other permits held by Roads Inc of NWF
- HWY 98 SR 30, Gulf Breeze: FLR10YL94, issued 2026-05-11
- GULF BEACH HIGHWAY, Pensacola: FLR10YL96, issued 2026-05-11
- SORRENTO RD EAST OF BAUER RD TO GULF BEACH HWY, Pensacola: FLR10YL97, issued 2026-05-11
- SR 95, Cantonment: FLR20AV30, issued 2019-09-08
- S. OLD CORRY FIELD RD, Pensacola: FLR20CJ76, issued 2018-10-05
- HWY 98 SR 30, Gulf Breeze: FLR20EC29, issued 2020-12-24
- WHITING FIELD AVIATION PARK POND EXPANSION, Milton: FLR20IX77, issued 2026-01-24
- BAYOU BLUFFS SUBDIVISION, Pensacola: FLR20JF99, issued 2026-05-09
- GARDEN STREET, Pensacola: FLR20JG18, issued 2026-05-11
Coverages issued nearest FLR20GS79
- 2023-10-26: WAWA 5414, Port Saint Lucie: FLR20GS72, held by Wilsons Petroleum
- 2023-10-26: LAKELAND REGIONAL FSED, Lakeland: FLR20GS76, held by Lakeland Regional Health Systems, Inc
- 2023-10-26: WESTERN INTERCONNECT FORCE MAIN PHASE 7, Naples: FLR20GS77, held by Accurate Drilling Systems Inc.
- 2023-10-27: LAKE AURORA CHRISTIAN ASSEMBLY, Lake Wales: FLR10WI52, held by Whitehead Construction
- 2023-10-27: WAKULLA CAREER ACADEMY, Crawfordville: FLR10WI56, held by Wakulla County School Board
- 2023-10-27: JAMMIN CAR WASH, Wesley Chapel: FLR20GS80, held by Creative Convenience Corp
- 2023-10-27: GOVERNORS PARK WWLS & RWPS, Green Cove Springs: FLR20GS82, held by Sawcross Incorporated
- 2023-10-27: SUNRISE ON THE GREEN, Sunrise: FLR20GS83, held by Murphy Pipeline Contractors, LLC
- 2023-10-28: FIRE STATION 32, Panama City Beach: FLR10WI58, held by Dominguez Design-Build, Inc
- 2023-10-28: PEN AIR CREDIT UNION - SITE DEMOLITION, Pensacola: FLR10WI62, held by Pen Air Credit Union
THREE HOLLOW EAST among its neighbors
6 discharge permits are in the Upper Pond Creek-Blackwater River subwatershed (HUC 031401040501); FLR20GS79 is one. Its county: 199, 2 major; FLR20GS79 is minor permit.
Other permits in the Upper Pond Creek-Blackwater River subwatershed (HUC 031401040501)
- BARDIN EVENT BARN, Jay: FLR20FT48, minor, term to 2027-10-06
- DENALI ESTATES, Jay: FLR20GF77, minor, term to 2028-04-22
- NATURE WALK AT POND CREEK, Jay: FLR20GF76, minor, term to 2028-04-22
- SCARLETT'S WAY, Jay: FLR10VX25, minor, term to 2028-04-27
- THREE HOLLOW ROAD, Jay: FLR20FP83, minor, term to 2027-08-06
Nearby on the register
- Discharge permits in Milton
- Every permit record in Milton, A to Z
- Discharge permits in Florida
- Every permit record in Florida, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The THREE HOLLOW EAST storm water construction permit (NPDES ID FLR20GS79) is one of 131 such permits in Santa Rosa County, and 50.4% of those 131 were issued earlier than it. It sits among six NPDES permits in the Upper Pond Creek-Blackwater River subwatershed (HUC 031401040501), this one included. Of its county peers, 0.0% have a violation on file.