NPDES FLR20HB59 · Clean Water Act
STORMWATER MAIN PHASE 2 & 3, Vero Beach, FL: NPDES FLR20HB59 discharge permit, effluent exceedances, inspections, penalties
STORMWATER MAIN PHASE 2 & 3, Vero Beach, Florida: General permit coverage FLR20HB59, held by Accurate Drilling Systems Inc.; Construction stormwater; Effective; issued March 17, 2024, term to March 16, 2029, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 6,306 were issued before FLR20HB59. Accurate Drilling Systems Inc. holds 28 permits in Florida.
Other permits held by Accurate Drilling Systems Inc.
- NORTH U.S. 41 16-INCH WATER MAIN, North Fort Myers: FLR20GP88, issued 2023-09-16
- BEN HILL GRIFFIN PARKWAY FORCE MAIN IMPROVEMENTS, Fort Myers: FLR20GQ15, issued 2023-09-18
- WESTERN INTERCONNECT FORCE MAIN PHASE 7, Naples: FLR20GS77, issued 2023-10-26
- BEN HILL GRIFFIN PARKWAY FORCE MAIN IMPROVEMENTS, Fort Myers: FLR20GU00, issued 2023-11-17
- ARREDONDO ESTATES WATER MAIN REPLACEMENT, Gainesville: FLR20GU23, issued 2023-11-19
- GATEWAY- FGUA BULK WATER INTERCONNECT, Lehigh Acres: FLR20GX59, issued 2024-01-19
- WESTERN RAW WATER MAIN, Port Saint Lucie: FLR20GX60, issued 2024-01-19
- WILDER RD FORCE MAIN CAPACITY IMPROVEMENTS, Plant City: FLR20GX61, issued 2024-01-19
- FORCE MAIN 32A REPLACEMENT, Bradenton: FLR20HB58, issued 2024-03-17
- STORMWATER MAIN PHASE 4, Vero Beach: FLR20HB60, issued 2024-03-17
Coverages issued nearest FLR20HB59
- 2024-03-17: I-DRIVE MF, Orlando: FLR10WR13, held by SLX - I Drive, LLC
- 2024-03-17: CHW BALFOUR NORTH, Ocala: FLR10WR16, held by Global Contracting Group LLC
- 2024-03-17: COMCAST MIRAMAR DATA CENTER, Miramar: FLR10WR17, held by Glenewinkel Construction Company
- 2024-03-17: DEF 40TH ST SUBSTATION EXPANSION, Saint Petersburg: FLR20HB57, held by Duke Energy Florida LLC
- 2024-03-17: FORCE MAIN 32A REPLACEMENT, Bradenton: FLR20HB58, held by Accurate Drilling Systems Inc.
- 2024-03-17: STORMWATER MAIN PHASE 4, Vero Beach: FLR20HB60, held by Accurate Drilling Systems Inc.
- 2024-03-17: STORMWATER MAIN PHASE 5, Vero Beach: FLR20HB61, held by Accurate Drilling Systems Inc.
- 2024-03-17: RLH CONSTRUCTION/CARL BLACK CHEVROLET EXPANSION, Orlando: FLR20HB62, held by RLH Construction
- 2024-03-17: BUNNELL ADMIN P.D. DEPT COMPLEX, Bunnell: FLR20HB63, held by S E Cline Construction Inc
- 2024-03-17: CIRCLE K COUNTY LINE RD & DRANE FIELD, Lakeland: FLR20HB64, held by Stansell Properties & Development LLC
STORMWATER MAIN PHASE 2 & 3 among its neighbors
69 discharge permits are in the St. Sebastian River-Indian River subwatershed (HUC 030802030307); FLR20HB59 is one. Its county: 468, 2 major; FLR20HB59 is minor permit.
Other permits in the St. Sebastian River-Indian River subwatershed (HUC 030802030307)
- 11TH DRIVE - HARBOR BLUFFS, Vero Beach: FLR20FM17, minor, term to 2027-06-08
- 132ST, Sebastian: FLR10WU56, minor, term to 2029-05-11
- 2595 QUAY DOCK RD, Vero Beach: FLR10YD06, minor, term to 2030-12-16
- 6904 28TH CT, Vero Beach: FLR10XP34, minor, term to 2030-04-16
- ANTILLES, Vero Beach: FLR10PY38, minor, term to 2021-02-27
- BEACH COVE MOBIL HOME PARK RECREATION AREA, Sebastian: FLR10YE47, minor, term to 2031-01-15
- BETTERLY, Vero Beach: FLR10WP94, minor, term to 2029-02-27
- BLU HAMMOCK, Vero Beach: FLR20IQ09, minor, term to 2030-09-27
- BRIDGE MARKETPLACE, Vero Beach: FLR20GB71, minor, term to 2028-02-24
- CEMEX LLC - NORTH VERO BEACH, Vero Beach: FLG110609, minor, term to 2023-09-06
What stands out
- Its term runs 4 years and 364 days, March 17, 2024 to March 16, 2029.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | STORMWATER MAIN PHASE 2 & 3 |
|---|---|
| Permittee | Accurate Drilling Systems Inc. |
| NPDES ID | FLR20HB59 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 17, 2024 |
| Expires | March 16, 2029 |
| Agency | Florida Department of Environmental Protection |
| Address | Vero Beach, FL 32967 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | St. Sebastian River-Indian River (HUC 030802030307) |
NPDES FLR20HB59: effluent limits and exceedances
STORMWATER MAIN PHASE 2 & 3 (NPDES FLR20HB59): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20HB59: no pollutant row on file.
NPDES FLR20HB59: inspections, violations and enforcement
NPDES FLR20HB59 (STORMWATER MAIN PHASE 2 & 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20HB59
NPDES FLR20HB59: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20HB59
NPDES FLR20HB59: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.