Clean Water Act discharge permit · NPDES FLR20HG56
NW WARD 5, Bradenton, FL: NPDES FLR20HG56 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
NW WARD 5, held by C-Squared Certified General Contractor, Inc., holds NPDES permit FLR20HG56. EPA’s file records it issued May 26, 2024 and expiring May 25, 2029. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for NW WARD 5: its NPDES ID, its permit type and status, its dates, its address in Bradenton, Florida. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES FLR20HG56.
What stands out
- Its term runs 4 years and 364 days, May 26, 2024 to May 25, 2029.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | NW WARD 5 |
|---|---|
| Permittee as filed | C-Squared Certified General Contractor, Inc. |
| NPDES ID | FLR20HG56 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | May 26, 2024 |
| Expiration date | May 25, 2029 |
| Issuing agency | Florida Department of Environmental Protection |
| Address | Bradenton, FL 34205 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Manatee River-Warner Bayou (HUC 031002020204) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR20HG56.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES FLR20HG56.
Inspections
EPA’s inspection file holds no inspection for NPDES FLR20HG56.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES FLR20HG56.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR20HG56.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR20HG56 there.
NW WARD 5, Bradenton, Florida: Coverage under a general permit FLR20HG56, held by C-Squared Certified General Contractor, Inc.; Construction stormwater; Effective; issued May 26, 2024, term to May 25, 2029, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 6,911 were issued before FLR20HG56.
Coverages issued nearest FLR20HG56
- 2024-05-26: TOWER GATES PHASE II, Tallahassee: FLR10WV59, held by Tower Gates Phase II
- 2024-05-26: ASCEND NORTHBROOKE COMMONS APARTMENTS, Palmetto: FLR20HG51, held by DHIC-Northbrooke Commons, LLC
- 2024-05-26: SPRINGHEAD LAKE, Saint Cloud: FLR20HG52, held by Lennar Homes
- 2024-05-26: GALLERY AT LUMMUS PARC TOWER, Miami: FLR20HG54, held by Related Urban Construction LLC
- 2024-05-26: MCDONALDS 92721 ZEPHYRHILLS, Zephyrhills: FLR20HG55, held by McDonalds USA LLC
- 2024-05-26: NORTH MIAMI LEHMAN HYUNDAI SERVICE CENTER, Miami: FLR20HG57, held by North Miami Lehman Hyundai Service Center
- 2024-05-26: NORTH MIAMI LEHMAN HYUNDAI SHOWROOM AND PARKING LO, Miami: FLR20HG58, held by North Miami Lehman Hyundai Showroom and Parking Lo
- 2024-05-26: GALLERY AT LUMMUS PARC GARAGE, Miami: FLR20HG59, held by Related Urban Construction LLC
- 2024-05-27: OSLO PARK UNIT 3, Vero Beach: FLR10WV57, held by IRC Habitat for Humanity Inc
- 2024-05-27: 8200 ENGLE PLACE, North Fort Myers: FLR10WV60, held by 8200 Engle Place
NW WARD 5 among its neighbors
66 discharge permits are in the Manatee River-Warner Bayou subwatershed (HUC 031002020204); FLR20HG56 is one. Its county: 517, 12 major; FLR20HG56 is minor permit.
Other permits in the Manatee River-Warner Bayou subwatershed (HUC 031002020204)
- 7-ELEVEN STORE NO. 22769, Bradenton: FLG915261, minor, term to 2030-06-02
- ALLIED MOLDED PRODUCTS INC, Palmetto: FLRNEE710, minor, term to 2013-09-13
- ANDACHT, Bradenton: FLG073812, minor, term to 2028-10-02
- ARTCENTER MANATEE, Bradenton: FLR10WP77, minor, term to 2029-02-25
- BIG DANS-BRADENTON, Bradenton: FLR10VL32, minor, term to 2027-09-14
- BRADENTON - MS4, Bradenton: FLS000037, major, term to 2016-11-30
- BRADENTON POLICE STATION, Bradenton: FLR20HR65, minor, term to 2029-11-09
- BRADENTON WWTF, Bradenton: FLR20GV90, minor, term to 2028-12-20
- BRADENTON WWTP CITY OF, Bradenton: FL0021369, major, term to 2025-09-08
- BRADENTON YACHT CLUB, Palmetto: FLRNEF325, minor, term to 2020-07-25
Nearby on the register
- Discharge permits in Bradenton
- Every permit record in Bradenton, A to Z
- Discharge permits in Florida
- Every permit record in Florida, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The NW WARD 5 storm water construction permit (NPDES ID FLR20HG56), held by C-Squared Certified General Contractor, Inc. in Bradenton, Manatee County, Florida, is one of 320 storm water construction permits in Manatee County, a count that includes this permit itself. Among those 320 permits, 0.3% have a violation on file, and 54.4% were issued earlier than this one. The permit sits within the Manatee River-Warner Bayou subwatershed, which holds 66 NPDES permits, this one included, and it records no pollutants under a numeric limit and no effluent exceedances.