Clean Water Act discharge permit · NPDES FLR20HW74

CORAL PINE PARK PINECREST PHASE 2, Pinecrest, FL: NPDES FLR20HW74 discharge permit, effluent exceedances, inspections, penalties

CORAL PINE PARK PINECREST PHASE 2, held by Waypoint Contracting, holds NPDES permit FLR20HW74. EPA’s file records it issued January 27, 2025 and expiring January 26, 2030. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What stands out

  • Its term runs 4 years and 364 days, January 27, 2025 to January 26, 2030.
  • Its newest dated event on file is single-event violation and inspection on March 26, 2026, 173 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 1 single-event violation, 1 inspection.
  • EPA's file dates 2 events for it, all in 2026.
  • It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

Facility as filedCORAL PINE PARK PINECREST PHASE 2
Permittee as filedWaypoint Contracting
NPDES IDFLR20HW74
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedJanuary 27, 2025
Expiration dateJanuary 26, 2030
Issuing agencyFlorida Department of Environmental Protection
AddressPinecrest, FL 33156
Receiving water impaired303(D) Listed
SubwatershedCutler Drain Canal (HUC 030902061601)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR20HW74.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

DateWhat EPA recordedAgency
March 26, 2026WW Storm Water Construction - Failure to Maintain RecordsST6

Inspections

DateWhat EPA recordedAgency
March 26, 2026EvaluationS

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES FLR20HW74.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR20HW74.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR20HW74 there.

CORAL PINE PARK PINECREST PHASE 2, Pinecrest, Florida: Coverage under a general permit FLR20HW74, held by Waypoint Contracting; Construction stormwater; Effective; issued January 27, 2025, term to January 26, 2030, by Florida Department of Environmental Protection.

  • March 26, 2026: WW Storm Water Construction - Failure to Maintain Records (ST6).
  • March 26, 2026: Evaluation (S).

Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 8,897 were issued before FLR20HW74. Waypoint Contracting holds 2 permits in Florida.

Other permits held by Waypoint Contracting

Coverages issued nearest FLR20HW74

CORAL PINE PARK PINECREST PHASE 2 among its neighbors

30 discharge permits are in the Cutler Drain Canal subwatershed (HUC 030902061601); FLR20HW74 is one. Its county: 1,003, 37 major; FLR20HW74 is minor permit.

Other permits in the Cutler Drain Canal subwatershed (HUC 030902061601)

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The CORAL PINE PARK PINECREST PHASE 2 permit is one of 673 storm water construction permits in Miami-Dade County, and 0.4% of those permits have a violation on file, a figure that puts it among a group with very few recorded violations. Among the 30 NPDES permits in the Cutler Drain Canal subwatershed, this permit records no pollutants under a numeric limit and no effluent exceedances.