NPDES FLR20IG70 · Clean Water Act
SR 528 WIDENING FROM GOLDENROD TO NARCOOSSEE RD, Orlando, FL: NPDES FLR20IG70 discharge permit, effluent exceedances, inspections, penalties
SR 528 WIDENING FROM GOLDENROD TO NARCOOSSEE RD, Orlando, Florida: General permit coverage FLR20IG70, held by Hubbard Construction Company; Construction stormwater; Effective; issued May 24, 2025, term to May 23, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 10,178 were issued before FLR20IG70. Hubbard Construction Company holds 12 permits in Florida.
Other permits held by Hubbard Construction Company
- LAKELAND HMA PLANT, Lakeland: FLR05I285, issued 2018-10-29
- LOUGHMAN HMA PLANT, Davenport: FLR05I286, issued 2018-10-29
- TRUSSWAY PLANT 11, Orlando: FLR05I598, issued 2021-01-14
- FDOT E59F3 SR 434, Longwood: FLR10XY68, issued 2025-09-26
- UNIVERSITY OF CENTRAL FLORIDA, Orlando: FLR10YA55, issued 2025-10-30
- CFX408-315/315A EEASTBOUND SR 408 WIDENING, Orlando: FLR10YH29, issued 2026-02-27
- SR 530 FROM WEST OF SR 429 TO THE REEDY CREEK BRIDGE, Kissimmee: FLR10YR83, issued 2026-09-06
- CONTRACT T2917 FIN 443304 & 445417 1 52 01, Jacksonville: FLR20GS12, issued 2023-10-15
- UNIVERSAL CARRIER DR ROADWAY IMPROVEMENTS, Orlando: FLR20HJ05, issued 2024-07-01
- SR33 LAKELAND HILLS BLVD ROADWAY IMPROVEMENTS, Lakeland: FLR20HN66, issued 2024-09-07
Coverages issued nearest FLR20IG70
- 2025-05-24: PHIL KEAN LOT 30 GOLDEN OAK AT DISNEY, Orlando: FLR10XR60, held by Phil Kean Designs
- 2025-05-24: SANDRIDGE GOLF CLUB, Vero Beach: FLR10XR61, held by QUEST CONTRACTING, LLC
- 2025-05-24: FLIGHTWAY SEVENTEEN, Hialeah Gardens: FLR10XR62, held by Link Construction Group Inc
- 2025-05-24: FIRE FLOW PROJECTS PACKAGE #2, Miami Beach: FLR20IG67, held by Metro Equipment Service Inc
- 2025-05-24: BRIGHTWATER PHASE 2, North Fort Myers: FLR20IG69, held by North Brook Holdings, LLC
- 2025-05-24: T.R. JACKSON RENOVATION, Milton: FLR20IG71, held by Joy Gordon Construction
- 2025-05-24: BRIGHTWATER PHASE 3, North Fort Myers: FLR20IG72, held by North Brook Holdings, LLC
- 2025-05-24: ABRAZO AT ROBINSON GATEWAY, Palmetto: FLR20IG73, held by Deme Construction
- 2025-05-24: 24E MG, Orlando: FLR20IG74, held by JR Davis Construction Company Inc.
- 2025-05-24: WILDWOOD SEWER PHASE I, Crawfordville: FLR20IG75, held by North Florida Construction Inc
SR 528 WIDENING FROM GOLDENROD TO NARCOOSSEE RD among its neighbors
191 discharge permits are in the Boggy Creek Swamp subwatershed (HUC 030901010102); FLR20IG70 is one. Its county: 1,375, 15 major; FLR20IG70 is minor permit.
Other permits in the Boggy Creek Swamp subwatershed (HUC 030901010102)
- 335 CENTRAL FLORIDA PKWY IOS, Orlando: FLR20HX36, minor, term to 2030-02-02
- 500 W LANDSTREET ROAD ROW, Orlando: FLG074715, minor, term to 2030-11-19
- 9722 BOGGY CREEK, Orlando: FLR20JG38, minor, term to 2031-05-14
- A-1 BLOCK- TAFT READY MIX FKA TRIPLE L CONCRETE PRODUCTS, Orlando: FLG110877, minor, term to 2025-07-07
- AAA COOPER TRANSPORTATION, Orlando: FLR05G903, minor, term to 2020-08-19
- AAA COOPER TRANSPORTATION, Orlando: FLR05J152, minor, term to 2029-01-21
- AH MEADOW WOODS OSED, Orlando: FLR10XI32, minor, term to 2030-01-02
- AIPO TRACT 15 & 16 WAREHOUSE, Orlando: FLR20HG80, minor, term to 2029-06-02
- AIPO TRACT 341 WAREHOUSE, Orlando: FLR20GZ45, minor, term to 2029-02-11
- AIPO TRACT 38 WAREHOUSE, Orlando: FLR20HP34, minor, term to 2029-10-02
What stands out
- Its term runs 4 years and 364 days, May 24, 2025 to May 23, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SR 528 WIDENING FROM GOLDENROD TO NARCOOSSEE RD |
|---|---|
| Permittee | Hubbard Construction Company |
| NPDES ID | FLR20IG70 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 24, 2025 |
| Expires | May 23, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Orlando, FL 32837 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Boggy Creek Swamp (HUC 030901010102) |
NPDES FLR20IG70: effluent limits and exceedances
SR 528 WIDENING FROM GOLDENROD TO NARCOOSSEE RD (NPDES FLR20IG70): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IG70: no pollutant row on file.
NPDES FLR20IG70: inspections, violations and enforcement
NPDES FLR20IG70 (SR 528 WIDENING FROM GOLDENROD TO NARCOOSSEE RD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IG70
NPDES FLR20IG70: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IG70
NPDES FLR20IG70: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.