NPDES FLR20IH90 · Clean Water Act
INFRASTRUCTURE CONSTRUCTION FOR KING CROSS PLACE(FKA WESTPOR, Bradenton, FL: NPDES FLR20IH90 discharge permit, effluent exceedances, inspections, penalties
INFRASTRUCTURE CONSTRUCTION FOR KING CROSS PLACE(FKA WESTPOR, Bradenton, Florida: General permit coverage FLR20IH90, held by Gator Grading & Paving LLC; Construction stormwater; Effective; issued June 12, 2025, term to June 11, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 10,362 were issued before FLR20IH90. Gator Grading & Paving LLC holds 4 permits in Florida.
Other permits held by Gator Grading & Paving LLC
- MOCCASIN WALLOW RD., I-75 TO US 301, SEG. 1, Parrish: FLR20FY53, issued 2023-01-09
- MOCCASIN WALLOW ROAD I-75 TO US 301 SEGMENT 2, Parrish: FLR20HS29, issued 2024-11-22
- MOCCASIN WALLOW ROAD I-75 TO US 301 SEGMENT 3, Parrish: FLR20IM80, issued 2025-08-18
Coverages issued nearest FLR20IH90
- 2025-06-12: BEVERLY SHORES SCHOOL, Leesburg: FLR10XS69, held by Beverly shores school
- 2025-06-12: WAWA - KANNER AND LOCKS, Stuart: FLR10XS71, held by Tommy Hawkins & Sons
- 2025-06-12: 119 SUGAR SAND WEST, Mexico Beach: FLR10XS72, held by Pelt Construction Company, LLC
- 2025-06-12: JAMES FARMS PHASE 1B, Bartow: FLR20IH66, held by GE Investments of Polk, LLC
- 2025-06-12: STERLING UCF, Orlando: FLR20IH88, held by Highway One Construction
- 2025-06-12: HUNT CLUB MOB, Apopka: FLR20IH91
- 2025-06-12: SW 123RD AVE - CUT-IN OF 96-INCH VALVE, Miami: FLR20IH93, held by Miami Dade County WASD
- 2025-06-12: GENESIS INDUSTRIAL, Vero Beach: FLR20IH95, held by Genesis Industrial
- 2025-06-12: BREVARD COUNTY FIRE STATION 40, Merritt Island: FLR20IH96, held by WJ Construction Corp.
- 2025-06-13: THE HAMPTONS CONDO, Miami: FLR10XS73, held by Hamptons West Condominium Association, Inc.
INFRASTRUCTURE CONSTRUCTION FOR KING CROSS PLACE(FKA WESTPOR among its neighbors
57 discharge permits are in the Lower Braden River subwatershed (HUC 031002020202); FLR20IH90 is one. Its county: 517, 12 major; FLR20IH90 is minor permit.
Other permits in the Lower Braden River subwatershed (HUC 031002020202)
- 5235 LENA RD. WAREHOUSE, Lakewood Ranch: FLR10YJ00, minor, term to 2031-03-22
- ABF FREIGHT SYSTEM INC, Bradenton: FLRNEF284, minor, term to 2025-02-23
- ALTON MANATEE, Sarasota: FLR20IQ07, minor, term to 2030-09-27
- AMAZON.COM SERVICES LLC - DFM5, Sarasota: FLR05I709, minor, term to 2026-09-23
- AVON CABINET CORPORATION, Bradenton: FLR05H444, minor, term to 2017-11-10
- AWR TRANSFER STATION, Sarasota: FLR05J021, minor, term to 2028-05-13
- BALL, A, Bradenton: FLG074058, minor, term to 2029-06-09
- BHD PRECISION PRODUCTS, INC, Sarasota: FLRNEF382, minor, term to 2021-05-29
- BOATER'S WORLD, Bradenton: FLR10UQ49, minor, term to 2026-10-08
- BRADEN POINTE, Bradenton: FLR10VJ39, minor, term to 2027-08-11
What stands out
- Its term runs 4 years and 364 days, June 12, 2025 to June 11, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INFRASTRUCTURE CONSTRUCTION FOR KING CROSS PLACE(FKA WESTPOR |
|---|---|
| Permittee | Gator Grading & Paving LLC |
| NPDES ID | FLR20IH90 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 12, 2025 |
| Expires | June 11, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Bradenton, FL 34203 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Lower Braden River (HUC 031002020202) |
NPDES FLR20IH90: effluent limits and exceedances
INFRASTRUCTURE CONSTRUCTION FOR KING CROSS PLACE(FKA WESTPOR (NPDES FLR20IH90): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IH90: no pollutant row on file.
NPDES FLR20IH90: inspections, violations and enforcement
NPDES FLR20IH90 (INFRASTRUCTURE CONSTRUCTION FOR KING CROSS PLACE(FKA WESTPOR): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IH90
NPDES FLR20IH90: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IH90
NPDES FLR20IH90: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.