NPDES FLR20IJ24 · Clean Water Act
75TH STREET WEST IMPROVEMENTS, Bradenton, FL: NPDES FLR20IJ24 discharge permit, effluent exceedances, inspections, penalties
75TH STREET WEST IMPROVEMENTS, Bradenton, Florida: General permit coverage FLR20IJ24, held by Ajax Paving Industries of Florida; Construction stormwater; Effective; issued June 29, 2025, term to June 28, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 10,534 were issued before FLR20IJ24.
Coverages issued nearest FLR20IJ24
- 2025-06-29: RUBY LAKE ROAD STORAGE, Winter Haven: FLR20IJ19, held by Tucker Paving, Inc
- 2025-06-29: WINTER HAVEN ILC - BUILDING 1, Winter Haven: FLR20IJ20, held by Tucker Paving, Inc
- 2025-06-29: WINTER HAVEN ILC - NW BORROW PIT, Winter Haven: FLR20IJ21, held by Tucker Paving, Inc
- 2025-06-29: WINTER HAVEN ILC - WHIP 6 MASS GRADING, Winter Haven: FLR20IJ22, held by Tucker Paving, Inc
- 2025-06-29: HICKORY VILLAGE, Saint Cloud: FLR20IJ23, held by Resibuilt
- 2025-06-29: TWA FLORIDA PLAZA 16, Kissimmee: FLR20IJ26, held by Cathcart Construction Company - Florida LLC
- 2025-06-29: SWA PALM BEACH COUNTY LF CELL 25 AND OVERLAY, West Palm Beach: FLR20IJ27, held by Solid Waste Authority
- 2025-06-30: CENTURY ESTATES ROYAL, Homestead: FLR10XT85, held by Lennar Homes, LLC
- 2025-06-30: BIG TOP MANUFACTURING SHIPPING AREA EXPANSION, Perry: FLR10XT86, held by Big Top Manufacturing
- 2025-06-30: GREEN, Vero Beach: FLR10XT87, held by Ethos Custom Construction, Inc
75TH STREET WEST IMPROVEMENTS among its neighbors
40 discharge permits are in the Palma Sola Bay Frontal subwatershed (HUC 031002010101); FLR20IJ24 is one. Its county: 517, 12 major; FLR20IJ24 is minor permit.
Other permits in the Palma Sola Bay Frontal subwatershed (HUC 031002010101)
- 7-ELEVEN, Bradenton: FLR20EV68, minor, term to 2026-10-07
- 7-ELEVEN STORE NO. 42969, Bradenton: FLG074933, minor, term to 2031-05-26
- BAYSHORE SELF STORAGE, Bradenton: FLR20FQ42, minor, term to 2027-08-17
- BAYSIDE SUBSTATION, Bradenton: FLR10XE35, minor, term to 2029-10-16
- CORTEZ PLAZA EV, Bradenton: FLR10WY75, minor, term to 2029-07-11
- CORTEZ VILLAGE MARINA, Cortez: FLR05I889, minor, term to 2027-07-21
- EDWARDS, D, Bradenton: FLG073860, minor, term to 2028-11-06
- FPL BAYSIDE DISTRIBUTION SUBSTATION, Bradenton: FLR20GA30, minor, term to 2028-02-08
- HOPE VILLAGE, Bradenton: FLR20HM17, minor, term to 2029-08-17
- HUNTERS POINT RESORT AND MARINA, Cortez: FLR20FU79, minor, term to 2027-10-26
What stands out
- Its term runs 4 years and 364 days, June 29, 2025 to June 28, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 75TH STREET WEST IMPROVEMENTS |
|---|---|
| Permittee | Ajax Paving Industries of Florida |
| NPDES ID | FLR20IJ24 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 29, 2025 |
| Expires | June 28, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Bradenton, FL 34209 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Palma Sola Bay Frontal (HUC 031002010101) |
NPDES FLR20IJ24: effluent limits and exceedances
75TH STREET WEST IMPROVEMENTS (NPDES FLR20IJ24): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IJ24: no pollutant row on file.
NPDES FLR20IJ24: inspections, violations and enforcement
NPDES FLR20IJ24 (75TH STREET WEST IMPROVEMENTS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IJ24
NPDES FLR20IJ24: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IJ24
NPDES FLR20IJ24: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.