NPDES FLR20IJ81 · Clean Water Act
THE EDDY AT HARRISON RANCH, Parrish, FL: NPDES FLR20IJ81 discharge permit, effluent exceedances, inspections, penalties
THE EDDY AT HARRISON RANCH, Parrish, Florida: General permit coverage FLR20IJ81, held by Benko Construction., Inc.; Construction stormwater; Effective; issued July 10, 2025, term to July 9, 2030, by Florida Department of Environmental Protection.
- March 24, 2026: Notice of Noncompliance Issued (State).
- March 9, 2026: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
- March 9, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- March 9, 2026: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
- March 9, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- March 9, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 10,626 were issued before FLR20IJ81.
Coverages issued nearest FLR20IJ81
- 2025-07-10: MILLER PLUMBING AT SUMMIT LAKE, Tallahassee: FLR10XU26, held by Benners Contracting, Inc.
- 2025-07-10: AVALON WOODS, Winter Garden: FLR10XU27, held by Dream Finders Homes, LLC
- 2025-07-10: MAIN STREET BEAUTIFICATION, Miami Lakes: FLR10XU28, held by Alston Construction
- 2025-07-10: LUV A WASH BONITA, Bonita Springs: FLR20IJ75, held by Bradanna Inc.
- 2025-07-10: KINFIELD 52, San Antonio: FLR20IJ78, held by Phillips & Jordan Inc
- 2025-07-11: BBTC MANUFACTURING FACILITY, Perry: FLR10XU29, held by Blue Rok Incorporated
- 2025-07-11: SEAGIS PALM CROSSINGS, Fort Lauderdale: FLR10XU32, held by SPG Palm Crossings, LLC
- 2025-07-11: CALI COVE, Punta Gorda: FLR10XU33, held by DR Horton Inc
- 2025-07-11: SADDLE HILL, Fruitland Park: FLR10XU34, held by LGI Homes
- 2025-07-11: EXPRESS OIL CHANGE-PENSACOLA, FL, Pensacola: FLR10XU35, held by Express Oil Change, LLC
THE EDDY AT HARRISON RANCH among its neighbors
59 discharge permits are in the Cypress Strand subwatershed (HUC 031002020203); FLR20IJ81 is one. Its county: 517, 12 major; FLR20IJ81 is minor permit.
Other permits in the Cypress Strand subwatershed (HUC 031002020203)
- 44THAVE E PH 2-ZONE 1 E OF I-75 TO LAKEWOOD RANCH, Sarasota: FLR20GX02, minor, term to 2029-01-11
- AMOCO-ROSE PARK, Parrish: FLG915292, minor, term to 2031-02-10
- ARBOR GRANDE AT LAKEWOOD CENTRE, Bradenton: FLR10QB92, minor, term to 2021-05-01
- BARBARA HARVEY K-8 ADDITION, Parrish: FLR20JH49, minor, term to 2031-05-29
- BLUE HERON PHASE 3, Bradenton: FLR20II58, minor, term to 2030-06-18
- BLUE HERON PRESERVE, Bradenton: FLR20GF81, minor, term to 2028-04-01
- BRINGMAN, Bradenton: FLG073813, minor, term to 2028-10-01
- CHICK-FIL-A #05751 HERITAGE HARBOUR, Bradenton: FLR10YL26, minor, term to 2031-04-30
- CIRCLE K STORE, Bradenton: FLG073631, minor, term to 2028-04-10
- COOPER FAMILY MEDICAL BUILDING, Parrish: FLR10VT44, minor, term to 2028-02-23
What stands out
- Its term runs 4 years and 364 days, July 10, 2025 to July 9, 2030.
- Its newest dated event on file is an informal enforcement action on March 24, 2026, 175 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 4 single-event violations, 1 inspection, 1 informal enforcement action.
- EPA's file dates 6 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | THE EDDY AT HARRISON RANCH |
|---|---|
| Permittee | Benko Construction., Inc. |
| NPDES ID | FLR20IJ81 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 10, 2025 |
| Expires | July 9, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Parrish, FL 34219 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cypress Strand (HUC 031002020203) |
NPDES FLR20IJ81: effluent limits and exceedances
THE EDDY AT HARRISON RANCH (NPDES FLR20IJ81): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IJ81: no pollutant row on file.
NPDES FLR20IJ81: inspections, violations and enforcement
NPDES FLR20IJ81: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| March 9, 2026 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
| March 9, 2026 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| March 9, 2026 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
| March 9, 2026 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES FLR20IJ81: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| March 9, 2026 | Evaluation | S |
NPDES FLR20IJ81: 1 informal enforcement action
| Date | What EPA recorded | Agency |
|---|---|---|
| March 24, 2026 | Notice of Noncompliance Issued | State |
NPDES FLR20IJ81 (THE EDDY AT HARRISON RANCH): no formal enforcement action on file.
Watch NPDES FLR20IJ81
NPDES FLR20IJ81: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IJ81
NPDES FLR20IJ81: 0 pollutant rows, 6 dated events; ICIS-NPDES download, loaded September 15, 2026.