NPDES FLR20IM83 · Clean Water Act
ALLANWOOD VILLAS, Port Orange, FL: NPDES FLR20IM83 discharge permit, effluent exceedances, inspections, penalties
ALLANWOOD VILLAS, Port Orange, Florida: General permit coverage FLR20IM83, held by Drewry Site Development; Construction stormwater; Effective; issued August 21, 2025, term to August 20, 2030, by Florida Department of Environmental Protection.
- November 3, 2025: WW Storm Water Construction - Failure to Maintain Records (ST6).
- November 3, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- November 3, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- November 3, 2025: WW Storm Water Construction - Failure to Conduct Inspections (ST6).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,077 were issued before FLR20IM83. Drewry Site Development holds 18 permits in Florida.
Other permits held by Drewry Site Development
- DREWRY SITE DEVELOPMENT HQ, Holly Hill: FLR10WC62, issued 2023-07-21
- BRAINTREE STORAGE, Holly Hill: FLR10WZ89, issued 2024-07-27
- CHENEY HIGHWAY WATER MAIN REPLACEMENT, Titusville: FLR10YM06, issued 2026-05-14
- CAMPBELL MIDDLE SCHOOL ROADWAY, Daytona Beach: FLR10YS04, issued 2026-08-29
- CARROLL CADILLAC, Sanford: FLR20HZ59, issued 2025-03-02
- JACKIE ROBINSON BALLPARK, Daytona Beach: FLR20IA33, issued 2025-03-10
- 7-ELEVEN, Daytona Beach: FLR20IA34, issued 2025-03-10
- BOJANGLES DAYTONA, Daytona Beach: FLR20IA35, issued 2025-03-10
- JOSIE ROGERS, Daytona Beach: FLR20IA78, issued 2025-03-16
- 400 BEACH, Daytona Beach: FLR20IA96, issued 2025-03-20
Coverages issued nearest FLR20IM83
- 2025-08-21: THE GARDENS AT BAY STREET, Sarasota: FLR10XX03, held by DR Horton Inc
- 2025-08-21: VERNA 30, Sarasota: FLR20IM74, held by Garney Construction
- 2025-08-21: JOHNSTON ROAD, Fort Pierce: FLR20IM76, held by Johnston Road
- 2025-08-21: SOUTH HILLSBOROUGH PIPELINE PROJECT SEGMENT A & B, Riverview: FLR20IM78, held by Garney Companies, Inc.
- 2025-08-21: CAPTIVA ISLAND INN, Captiva: FLR20IM82, held by Stevens Construction Inc.
- 2025-08-21: CAPTIVA ISLAND INN, Captiva: FLR20IM85, held by Stevens Construction Inc.
- 2025-08-21: PNS MRO APRON AND TAXIWAY EXT, Pensacola: FLR20IM87, held by Panhandle Grading and Paving Inc.
- 2025-08-21: SPROUTS 677 & RETAIL, Orlando: FLR20IM88, held by J. Raymond Construction Corp.
- 2025-08-21: MAGANA RESIDENCE, Fellsmere: FLR20IM89, held by FREEDOM BUILDER'S CONSTRUCTION LLC
- 2025-08-21: FDOT T7570, Wesley Chapel: FLR20IM90, held by Alexander Design Build LLC
ALLANWOOD VILLAS among its neighbors
21 discharge permits are in the Rose Bay-Spruce Creek Frontal subwatershed (HUC 030802010105); FLR20IM83 is one. Its county: 479, 8 major; FLR20IM83 is minor permit.
Other permits in the Rose Bay-Spruce Creek Frontal subwatershed (HUC 030802010105)
- BESTRONG USA, Port Orange: FLR10XD61, minor, term to 2029-10-02
- BIK HYDRAULICS, Port Orange: FLR10XT45, minor, term to 2030-06-22
- CHRIST THE KING COMMUNITY CHURCH, Port Orange: FLR20HL49, minor, term to 2029-08-09
- CREEKSIDE OFFICE SUITES, Port Orange: FLR20IG47, minor, term to 2030-05-21
- FPL MAGNOLIA SUBSTATION, Port Orange: FLR20JF20, minor, term to 2031-04-30
- INLET HARBOR MARINA, Ponce Inlet: FLR05I893, minor, term to 2027-07-21
- LIGHTHOUSE BOATYARD & MARINA, Ponce Inlet: FLR05G921, minor, term to 2019-08-14
- LIGHTHOUSE BOATYARD AND MARINA, Ponce Inlet: FLR05J081, minor, term to 2028-09-14
- LIL CHAMP #6268, Port Orange: FLR20HS78, minor, term to 2029-11-27
- OAK BREEZE PLAZA, Port Orange: FLG074222, minor, term to 2029-10-29
What stands out
- Its term runs 4 years and 364 days, August 21, 2025 to August 20, 2030.
- Its newest dated event on file is a single-event violation on November 3, 2025, 345 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 4 single-event violations.
- EPA's file dates 4 events for it, all in 2025.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ALLANWOOD VILLAS |
|---|---|
| Permittee | Drewry Site Development |
| NPDES ID | FLR20IM83 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 21, 2025 |
| Expires | August 20, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Port Orange, FL 32127 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Rose Bay-Spruce Creek Frontal (HUC 030802010105) |
NPDES FLR20IM83: effluent limits and exceedances
ALLANWOOD VILLAS (NPDES FLR20IM83): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IM83: no pollutant row on file.
NPDES FLR20IM83: inspections, violations and enforcement
NPDES FLR20IM83: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| November 3, 2025 | WW Storm Water Construction - Failure to Maintain Records | ST6 |
| November 3, 2025 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| November 3, 2025 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| November 3, 2025 | WW Storm Water Construction - Failure to Conduct Inspections | ST6 |
NPDES FLR20IM83 (ALLANWOOD VILLAS): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IM83
NPDES FLR20IM83: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IM83
NPDES FLR20IM83: 0 pollutant rows, 4 dated events; ICIS-NPDES download, loaded October 14, 2026.