NPDES FLR20IN01 · Clean Water Act
PSL WATER CONTROL STRUCTURE A14, Port Saint Lucie, FL: NPDES FLR20IN01 discharge permit, effluent exceedances, inspections, penalties
PSL WATER CONTROL STRUCTURE A14, Port Saint Lucie, Florida: General permit coverage FLR20IN01, held by Douglas N. Higgins, Inc.; Construction stormwater; Effective; issued August 22, 2025, term to August 21, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,096 were issued before FLR20IN01. Douglas N. Higgins, Inc. holds 3 permits in Florida.
Other permits held by Douglas N. Higgins, Inc.
- PICAYUNE STRAND CONVEYANCE FEATURES, Naples: FLR20FF82, issued 2022-03-10
- S-169W-MS WITH TRASH RAKES, Clewiston: FLR20HU57, issued 2024-12-23
Coverages issued nearest FLR20IN01
- 2025-08-22: EAA CANAL CONVEYANCE IMPROVEMENTS, MIAMI CANAL, South Bay: FLR20IM96, held by Phillips Heavy
- 2025-08-22: SR 5A KING STREET BRIDGE, Saint Augustine: FLR20IM97, held by J.B. Coxwell Contracting, Inc.
- 2025-08-22: SEA WORLD OF FLORIDA INC, Orlando: FLR20IM98, held by Southern Development & Construction Inc.
- 2025-08-22: CASA BELLA, Largo: FLR20IM99, held by Casa Bella
- 2025-08-22: FLORIDA INDOOR RACQUET CLUB, Pompano Beach: FLR20IN00, held by Florida Indoor Tennis LLC
- 2025-08-22: LAKEVIEW PRESERVE, Saint Cloud: FLR20IN03, held by Meritage Homes
- 2025-08-22: CANEY CREEK PUBLIC ROADS, Jacksonville: FLR20IN04, held by Florida Infrastructure Inc.
- 2025-08-22: SENECA, Zellwood: FLR20IN05, held by DR Horton Inc
- 2025-08-23: PILON-BROWN, Vero Beach: FLR10XX09, held by Groza Builders
- 2025-08-23: REX GROVES, Winter Garden: FLR10XX10, held by Rex Groves
PSL WATER CONTROL STRUCTURE A14 among its neighbors
279 discharge permits are in the North Fork of the St. Lucie River subwatershed (HUC 030902060200); FLR20IN01 is one. Its county: 447, 2 major; FLR20IN01 is minor permit.
Other permits in the North Fork of the St. Lucie River subwatershed (HUC 030902060200)
- 24 INCH WATER MAIN EXTENSION PAAR DR AND I95, Port Saint Lucie: FLR10WB38, minor, term to 2028-06-29
- 24-INCH FM FROM WESTPORT WWTP TO GLADES BOOSTER PS, Port Saint Lucie: FLR20HQ75, minor, term to 2029-10-26
- 2650 S KINGS HIGHWAY DEVELOPMENT, Fort Pierce: FLR10VH18, minor, term to 2027-06-25
- 3800 CROSSROADS, Fort Pierce: FLR10VE54, minor, term to 2027-05-12
- 460 PEACOCK BUSINESS CENTER, Port St Lucie: FLR10VD27, minor, term to 2027-04-27
- 500 STADIUM BUSINESS CENTER, Port Saint Lucie: FLR20FN04, minor, term to 2027-06-16
- 5TH THIRD BANK, Port Saint Lucie: FLR20HQ60, minor, term to 2029-10-25
- 7-11 42157, Fort Pierce: FLR20GE58, minor, term to 2028-04-08
- 7038-1009 WM DC, Fort Pierce: FLR10YM16, minor, term to 2031-05-14
- 9/2788-MCDONALD'S-PORT ST. LUCIE-HWY 1-NEW STORE, Port Saint Lucie: FLR20IV92, minor, term to 2030-12-24
What stands out
- Its term runs 4 years and 364 days, August 22, 2025 to August 21, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PSL WATER CONTROL STRUCTURE A14 |
|---|---|
| Permittee | Douglas N. Higgins, Inc. |
| NPDES ID | FLR20IN01 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 22, 2025 |
| Expires | August 21, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Port Saint Lucie, FL 34953 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | North Fork of the St. Lucie River (HUC 030902060200) |
NPDES FLR20IN01: effluent limits and exceedances
PSL WATER CONTROL STRUCTURE A14 (NPDES FLR20IN01): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IN01: no pollutant row on file.
NPDES FLR20IN01: inspections, violations and enforcement
NPDES FLR20IN01 (PSL WATER CONTROL STRUCTURE A14): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IN01
NPDES FLR20IN01: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IN01
NPDES FLR20IN01: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.