Clean Water Act discharge permit · NPDES FLR20IO24
SUNCOAST PARKWAY PHASE 3A, Crystal River, FL: NPDES FLR20IO24 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
SUNCOAST PARKWAY PHASE 3A, held by Superior Construction Southeast, holds NPDES permit FLR20IO24. EPA’s file records it issued September 6, 2025 and expiring September 5, 2030. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for SUNCOAST PARKWAY PHASE 3A: its NPDES ID, its permit type and status, its dates, its address in Crystal River, Florida. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES FLR20IO24.
What stands out
- Its term runs 4 years and 364 days, September 6, 2025 to September 5, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | SUNCOAST PARKWAY PHASE 3A |
|---|---|
| Permittee as filed | Superior Construction Southeast |
| NPDES ID | FLR20IO24 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | September 6, 2025 |
| Expiration date | September 5, 2030 |
| Issuing agency | Florida Department of Environmental Protection |
| Address | Crystal River, FL 34429 |
| Subwatershed | Crystal River (HUC 031002070102) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR20IO24.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES FLR20IO24.
Inspections
EPA’s inspection file holds no inspection for NPDES FLR20IO24.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES FLR20IO24.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR20IO24.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR20IO24 there.
SUNCOAST PARKWAY PHASE 3A, Crystal River, Florida: Coverage under a general permit FLR20IO24, held by Superior Construction Southeast; Construction stormwater; Effective; issued September 6, 2025, term to September 5, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,275 were issued before FLR20IO24.
Coverages issued nearest FLR20IO24
- 2025-09-06: E3X91 GULF COUNTY ROADWAY, Port Saint Joe: FLR10XX83, held by Pigott Asphalt and Sitework, LLC
- 2025-09-06: KEYS GATEWAY TOWN CENTER, Homestead: FLR10XX84, held by MUTINEER DEVELOPMENT, LLC
- 2025-09-06: CLAUDE PEPPER, Miami: FLR10XX85, held by Residences at Claude Pepper, LLC
- 2025-09-06: AMELIA VIEW, Fernandina: FLR20IO22, held by DR Horton, Inc.
- 2025-09-06: OAKWOOD PLAZA, Hollywood: FLR20IO23, held by Oakwood Plaza LP & Oakwood Business Center
- 2025-09-06: WINDMILL RANCH PARK, Weston: FLR20IO27, held by Windmill Ranch Park
- 2025-09-06: DRIFTWOOD TERRACE, Hollywood: FLR20IO28, held by Driftwood terrace
- 2025-09-06: VERANDA BAY CLUBHOUSE, Palm Coast: FLR20IO30, held by JD Weber Construction
- 2025-09-06: ZEN EQUESTRIAN, Lake Worth: FLR20IO31, held by T&F Contracting, Inc.
- 2025-09-06: CHANDLER OAKS, Apopka: FLR20IO32, held by Jon M Hall Company
SUNCOAST PARKWAY PHASE 3A among its neighbors
26 discharge permits are in the Crystal River subwatershed (HUC 031002070102); FLR20IO24 is one. Its county: 90, 2 major; FLR20IO24 is minor permit.
Other permits in the Crystal River subwatershed (HUC 031002070102)
- A-ABLE RMF, Crystal River: FLL011887, minor, term to 2025-12-31
- BEVERLY HILLS CROSSING-INFRASTRUCTURE, Lecanto: FLR10VO80, minor, term to 2027-11-30
- BICENTENNIAL PARK SEWER IMPROVEMENT, Crystal River: FLR10WV95, minor, term to 2029-06-05
- BLACK DIAMOND TOWN CENTER PHASES 1 AND 2, Lecanto: FLR20ID57, minor, term to 2030-04-16
- BLACK DIAMOND TOWN CENTER PHASES 1 AND 2 SITE, Lecanto: FLR20ID58, minor, term to 2030-04-16
- CITRUS COUNTY MOSQUITO CONTROL DISTRICT, Lecanto: FLG510009, minor, term to 2021-12-19
- CITRUS PUBLISHING INC, Crystal River: FLRNEE684, minor, term to 2018-05-19
- CLEARSKY REHABILITATION HOSPITAL OF LECANTO, Lecanto: FLR10VF35, minor, term to 2027-05-28
- CRYSTAL BAY RV RESORT, Crystal River: FLR10VV48, minor, term to 2028-03-30
- CRYSTAL RIDGE PHASE 1, Crystal River: FLR20HT85, minor, term to 2029-12-13
Nearby on the register
- Discharge permits in Crystal River
- Every permit record in Crystal River, A to Z
- Discharge permits in Florida
- Every permit record in Florida, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The SUNCOAST PARKWAY PHASE 3A storm water construction permit in Crystal River, Citrus County, is one of 58 such permits on EPA's NPDES register for that county, this one included. It sits within a Crystal River subwatershed that holds 26 NPDES permits, this one among them, and none of its pollutants carries a numeric limit or an effluent exceedance on file.