NPDES FLR20IQ33 · Clean Water Act
WILDLIGHT PARCEL 21-1 - PHASE 1, Yulee, FL: NPDES FLR20IQ33 discharge permit, effluent exceedances, inspections, penalties
WILDLIGHT PARCEL 21-1 - PHASE 1, Yulee, Florida: General permit coverage FLR20IQ33, held by Vallencourt Construction Company Inc; Construction stormwater; Effective; issued October 2, 2025, term to October 1, 2030, by Florida Department of Environmental Protection.
- June 5, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- June 5, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,560 were issued before FLR20IQ33. Vallencourt Construction Company Inc holds 26 permits in Florida.
Other permits held by Vallencourt Construction Company Inc
- CHURCH OF ELEVEN22 AT WILDLIGHT, Yulee: FLR10YC96, issued 2025-12-14
- STILLWOOD PINES BLVD. PHASE 2, Jacksonville: FLR20HG94, issued 2024-06-01
- RIVERBLUFF PARKWAY PH 1, Yulee: FLR20HN06, issued 2024-08-30
- WILDLIGHT PDP #3 POD 4 MASS GRADING, Yulee: FLR20HP94, issued 2024-10-14
- MOB AND LIFE TIME AT STILLWOOD PINES, Jacksonville: FLR20HW34, issued 2025-01-20
- LAURELTON PH 2 & 3 (FKA GOVERNORS PARK PH 1A), Green Cove Springs: FLR20HY29, issued 2025-02-16
- PINEWALK PH 1 COLLECTOR RD (FKA BTI GREENBRIAR), Saint Johns: FLR20HY34, issued 2025-02-16
- SARATOGA SPRINGS PH 1A, Green Cove Springs: FLR20HY35, issued 2025-02-16
- SARATOGA SPRINGS PH 4A, Green Cove Springs: FLR20HY38, issued 2025-02-16
- PINEWALK PH 1A & 1B (FKA BTI GREENBRIAR PH 1), Saint Johns: FLR20IC24, issued 2025-04-03
Coverages issued nearest FLR20IQ33
- 2025-10-02: DUCK COURT PARK, Port Saint Lucie: FLR10XZ23, held by GRSC, Inc.
- 2025-10-02: 1512304 BEN BOSTICK GADSDEN COUNTY, Quincy: FLR10XZ25, held by C W Roberts Contracting, Inc
- 2025-10-02: DC INDUSTRIAL, Jupiter: FLR20IP62, held by Ryan Incorporated Southern
- 2025-10-02: (SR 93) I-75 IMPROVEMENTS FROM GRIFFIN RD TO S SW 14TH ST, Davie: FLR20IP82, held by OHL USA, Inc
- 2025-10-02: 22 CR STREETSCAPE, PHASE 1, Fort Meade: FLR20IQ32, held by Gibbs & Register, Inc.
- 2025-10-02: EDGEWATER, Apollo Beach: FLR20IQ34, held by DR Horton, Inc.
- 2025-10-02: R+L CARRIERS, Fort Pierce: FLR20IQ35, held by Ramar Land Corporation
- 2025-10-02: DUSTY LANE, New Port Richey: FLR20IQ36, held by Ripa & Associates LLC
- 2025-10-02: RIDGEWOOD SOUTH PHASE 2, Riverview: FLR20IQ37, held by QGS DEVELOPMENT INC
- 2025-10-02: SOUTHWOOD THE LEARNING EXPERIENCE, Tallahassee: FLR20IQ38, held by SANDCO
WILDLIGHT PARCEL 21-1 - PHASE 1 among its neighbors
106 discharge permits are in the Jolly River subwatershed (HUC 030702040907); FLR20IQ33 is one. Its county: 112, 3 major; FLR20IQ33 is minor permit.
Other permits in the Jolly River subwatershed (HUC 030702040907)
- 804 - CUMBERLAND HARBOUR, St. Marys: GAR396E4D, minor, term to 2028-07-31
- 807 MARSH LANE, St. Marys: GAR18ADCB, minor, term to 2028-07-31
- ASHLEY FURNITURE YULEE, Yulee: FLR20HX00, minor, term to 2030-01-30
- CHESTER ROAD WIDENING, Yulee: FLR20HI52, minor, term to 2029-06-23
- COLERAIN TOWNHOMES, St Marys: GAR18B61F, minor, term to 2028-07-31
- COLERAIN TOWNHOMES, St Marys: GAR18B67D, minor, term to 2028-07-31
- CONYERS AT BARTLETT STREET, St Marys: GAR3974D0, minor, term to 2028-07-31
- COSM - BLOCK 1 - PARCEL A, St Marys: GAR3973D9, minor, term to 2028-07-31
- COSM PARCEL 7 - ST. MARYS INDUSTRIAL PARK, St. Marys: GAR18BBC2, minor, term to 2028-07-31
- CUMBERLAND HARBOUR DRAINAGE, St Marys: GAR3972E2, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 364 days, October 2, 2025 to October 1, 2030.
- Its newest dated event on file is single-event violation and inspection on June 5, 2026, 131 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 single-event violation, 1 inspection.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WILDLIGHT PARCEL 21-1 - PHASE 1 |
|---|---|
| Permittee | Vallencourt Construction Company Inc |
| NPDES ID | FLR20IQ33 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 2, 2025 |
| Expires | October 1, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Yulee, FL 32097 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Jolly River (HUC 030702040907) |
NPDES FLR20IQ33: effluent limits and exceedances
WILDLIGHT PARCEL 21-1 - PHASE 1 (NPDES FLR20IQ33): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IQ33: no pollutant row on file.
NPDES FLR20IQ33: inspections, violations and enforcement
NPDES FLR20IQ33: 1 single-event violation
| Date | What EPA recorded | Agency |
|---|---|---|
| June 5, 2026 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES FLR20IQ33: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| June 5, 2026 | Evaluation | S |
NPDES FLR20IQ33 (WILDLIGHT PARCEL 21-1 - PHASE 1): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IQ33
NPDES FLR20IQ33: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IQ33
NPDES FLR20IQ33: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.