NPDES FLR20IR53 · Clean Water Act
TELLEZ RESIDENCE, Vero Beach, FL: NPDES FLR20IR53 discharge permit, effluent exceedances, inspections, penalties
TELLEZ RESIDENCE, Vero Beach, Florida: General permit coverage FLR20IR53, held by FREEDOM BUILDER'S CONSTRUCTION LLC; Construction stormwater; Effective; issued October 19, 2025, term to October 18, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 11,729 were issued before FLR20IR53. FREEDOM BUILDER'S CONSTRUCTION LLC holds 21 permits in Florida.
Other permits held by FREEDOM BUILDER'S CONSTRUCTION LLC
- BRRRR RENTAL PROPERTIES LLC, Vero Beach: FLR20GI34, issued 2023-06-02
- 6040 45TH ST, Vero Beach: FLR20GQ27, issued 2023-09-21
- DAISY RIOS, Vero Beach: FLR20GT16, issued 2023-11-03
- BRRRR RENTAL PROPERTIES LLC, Vero Beach: FLR20GT42, issued 2023-11-09
- LEFFLER, Fellsmere: FLR20HM29, issued 2024-08-18
- 9366 CARTERO, Fellsmere: FLR20HT35, issued 2024-12-07
- 4866 ROUER, Vero Beach: FLR20HT36, issued 2024-12-07
- 9356 CARTERO, Fellsmere: FLR20HT42, issued 2024-12-08
- AREYAN, Vero Beach: FLR20IB67, issued 2025-03-28
- 6701 SALERNO RD, Fort Pierce: FLR20IL05, issued 2025-07-28
Coverages issued nearest FLR20IR53
- 2025-10-19: NAPLES GREENWAY, Naples: FLR10YA05, held by South Florida Excavation, inc.
- 2025-10-19: WILLOWBROOK SOUTH, Winter Haven: FLR10YA06, held by D.R. Horton Inc.
- 2025-10-19: HARVEY HEIGHTS, Panama City: FLR10YA07, held by Holiday Builders
- 2025-10-19: OASIS AT HAMMOCK DUNES, Palm Coast: FLR10YA08, held by Volusia Residential Construction
- 2025-10-19: BOYLAND PROPERTIES AND MILLENIA PALMS-TRACT MASS GRADING, Orlando: FLR20IR36, held by Dave's Tractor, LLC
- 2025-10-19: SUN RAY PWM IMPROVEMENTS, Frostproof: FLR20IR54, held by Killebrew Inc
- 2025-10-19: CHAMIPIONS GATE WWFM RELOCATION, Davenport: FLR20IR55, held by Killebrew Inc
- 2025-10-19: I-75 FROM SR200 TO SR 326, Ocala: FLR20IR56, held by The Lane Construction Corporation
- 2025-10-19: THE OAKS AT BAY GROVE, Freeport: FLR20IR57
- 2025-10-19: R4 INTEGRATION, Fort Walton Beach: FLR20IR58
TELLEZ RESIDENCE among its neighbors
73 discharge permits are in the Vero Beach Estates subwatershed (HUC 030802030301); FLR20IR53 is one.
Other permits in the Vero Beach Estates subwatershed (HUC 030802030301)
- 10087 NEW SINGLE FAMILY CONSTRUCTION, Vero Beach: FLR10WX89, minor, term to 2029-06-28
- 100TH CT, Vero Beach: FLR10WV17, minor, term to 2029-05-19
- 10620 92ND ST. VERO BEACH, Vero Beach: FLR10XJ74, minor, term to 2030-01-25
- 7815 102ND AVE, Vero Beach: FLR10WK23, minor, term to 2028-11-30
- 7936 95TH AVE, Vero Beach: FLR10VW59, minor, term to 2028-04-15
- 8056 102ND CT, Vero Beach: FLR10XF02, minor, term to 2029-10-27
- 8086 98TH COURT, Vero Beach: FLR10WJ81, minor, term to 2028-11-18
- 8316 103RD AVE, Vero Beach: FLR10WF26, minor, term to 2028-08-31
- 8356 100TH AVE, Vero Beach: FLR10WK64, minor, term to 2028-12-06
- 8425 101ST AVE NEW CONSTRUCTION, Vero Beach: FLR10YL73, minor, term to 2031-05-06
What stands out
- Its term runs 4 years and 364 days, October 19, 2025 to October 18, 2030.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TELLEZ RESIDENCE |
|---|---|
| Permittee | FREEDOM BUILDER'S CONSTRUCTION LLC |
| NPDES ID | FLR20IR53 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 19, 2025 |
| Expires | October 18, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Vero Beach, FL 32967 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Vero Beach Estates (HUC 030802030301) |
NPDES FLR20IR53: effluent limits and exceedances
TELLEZ RESIDENCE (NPDES FLR20IR53): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IR53: no pollutant row on file.
NPDES FLR20IR53: inspections, violations and enforcement
NPDES FLR20IR53 (TELLEZ RESIDENCE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IR53
NPDES FLR20IR53: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IR53
NPDES FLR20IR53: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.