CAWTHON DEVELOPMENT, Tallahassee, FL: NPDES FLR20IU14 discharge permit, effluent exceedances, inspections, penalties
CAWTHON DEVELOPMENT, Tallahassee, Florida: General permit coverage FLR20IU14, held by SANDCO; Construction stormwater; Effective; issued November 24, 2025, term to November 23, 2030, by Florida Department of Environmental Protection.
- December 3, 2025: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- December 3, 2025: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- December 3, 2025: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 12,120 were issued before FLR20IU14. SANDCO holds 13 permits in Florida.
Other permits held by SANDCO
- OX BOTTOM POND, Tallahassee: FLR20FX27, issued 2022-12-11
- RAINEY CAWTHON DEPOT, Tallahassee: FLR20GT66, issued 2023-11-11
- CANOPY UNIT 9 WEST, Tallahassee: FLR20HA86, issued 2024-03-04
- ORANGE MERIDIAN PARK, Tallahassee: FLR20IH30, issued 2025-06-02
- SOUTHWOOD THE LEARNING EXPERIENCE, Tallahassee: FLR20IQ38, issued 2025-10-02
- PAUL RUSSELL RD FROM MONDAY ST TO APPALACHEE PKWY, Tallahassee: FLR20IR39, issued 2025-10-17
- S ADAMS STREET FROM MLK TO DAVIS ST, Quincy: FLR20IY56, issued 2026-02-05
- TALIS TRAIL BLVD, Tallahassee: FLR20JA09, issued 2026-02-23
- MACLAY SCHOOL - INDOOR PRACTICE FACILITY, Tallahassee: FLR20JD58, issued 2026-04-06
- NORTHSIDE SHOPPES, Tallahassee: FLR20JH44, issued 2026-05-30
Coverages issued nearest FLR20IU14
- 2025-11-24: SHELL POINT-ISLAND - ALF, Fort Myers: FLR20IT37, held by Christian and Missionary Alliance Foundation, Inc.
- 2025-11-24: PINE RIDGE, Clermont: FLR20IU08, held by Tri-Pointe Homes
- 2025-11-24: BRISKEL POINTE SWM, Boca Raton: FLR20IU09, held by Briskel Pointe Owner LLC
- 2025-11-24: KENNEDY SPACE CENTER VISITOR COMPLEX, Merritt Island: FLR20IU10, held by DNC Parks Resorts at KSC, Inc
- 2025-11-24: CASA FIU, Miami: FLR20IU11, held by FIU Student Housing Estates LLC
- 2025-11-24: TESLA COLLISION CENTER - SANFORD, Sanford: FLR20IU15, held by Vision General Contractors of GA, LLC
- 2025-11-24: DANIELS PARKWAY APARTMENTS, Fort Myers: FLR20IU16, held by Morrow Construction
- 2025-11-27: EDGE SOLAR, Lakeland: FLR10YC09, held by Williams Companies
- 2025-11-27: THE RESERVE EAST AMENITY CENTER, Flagler Beach: FLR10YC11, held by Front Site Development
- 2025-11-27: OAKFIELD TRAILS, Parrish: FLR10YC12, held by Stanley Martin Homes
CAWTHON DEVELOPMENT among its neighbors
21 discharge permits are in the Lake Jackson subwatershed (HUC 031200030301); FLR20IU14 is one.
Other permits in the Lake Jackson subwatershed (HUC 031200030301)
- ALFRED B. MACLAY SCHOOL, Tallahassee: FLR10WX48, minor, term to 2029-06-21
- ALFRED B. MACLAY SCHOOL, Tallahassee: FLR10YJ37, minor, term to 2031-04-03
- CAWTHON MULTI-FAMILY, Tallahassee: FLR20IA25, minor, term to 2030-03-08
- COKER RESIDENCE, Tallahassee: FLR10YE27, minor, term to 2031-01-14
- CONNORS RESTAURANT, Tallahassee: FLR10WM65, minor, term to 2029-01-10
- CUMBERLAND FARMS NORTH MONROE STREET, Tallahassee: FLR10VH05, minor, term to 2027-06-29
- FAMILY DOLLAR - ALBANY (GILLIONVILLE ROAD), Albany: GAR148405, minor, term to 2018-07-31
- HAMMOCK AT OAK GROVE SUBDIVISION, Tallahassee: FLR10XF38, minor, term to 2029-11-01
- LAKE JACKSON GREENWAY, Tallahassee: FLR20HB76, minor, term to 2029-03-20
- MACLAY SCHOOL - INDOOR PRACTICE FACILITY, Tallahassee: FLR20JD58, minor, term to 2031-04-05
What stands out
- Its term runs 4 years and 364 days, November 24, 2025 to November 23, 2030.
- Its newest dated event on file is a single-event violation on December 3, 2025, 286 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 3 single-event violations.
- EPA's file dates 3 events for it, all in 2025.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | CAWTHON DEVELOPMENT |
|---|---|
| Permittee | SANDCO |
| NPDES ID | FLR20IU14 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 24, 2025 |
| Expires | November 23, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Tallahassee, FL 32312 |
| Subwatershed | Lake Jackson (HUC 031200030301) |
NPDES FLR20IU14: effluent limits and exceedances
CAWTHON DEVELOPMENT (NPDES FLR20IU14): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IU14: no pollutant row on file.
NPDES FLR20IU14: inspections, violations and enforcement
NPDES FLR20IU14: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| December 3, 2025 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| December 3, 2025 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| December 3, 2025 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
NPDES FLR20IU14 (CAWTHON DEVELOPMENT): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IU14
NPDES FLR20IU14: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IU14
NPDES FLR20IU14: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.