Clean Water Act discharge permit · NPDES FLR20IU26
WATERFRONT PARK PHASE 2, Palm Coast, FL: NPDES FLR20IU26 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 1Inspections on file
- 0Formal enforcement actions
WATERFRONT PARK PHASE 2, held by American Civil Construction Inc, holds NPDES permit FLR20IU26. EPA’s file records it issued November 27, 2025 and expiring November 26, 2030. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What stands out
- Its term runs 4 years and 364 days, November 27, 2025 to November 26, 2030.
- Its newest dated event on file is single-event violation and inspection on April 17, 2026, 180 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 single-event violation, 1 inspection.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | WATERFRONT PARK PHASE 2 |
|---|---|
| Permittee as filed | American Civil Construction Inc |
| NPDES ID | FLR20IU26 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | November 27, 2025 |
| Expiration date | November 26, 2030 |
| Issuing agency | Florida Department of Environmental Protection |
| Address | Palm Coast, FL 32137 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Pellicer Creek-Big Mulberry Branch Frontal (HUC 030802010304) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR20IU26.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 1Single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| April 17, 2026 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
Inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| April 17, 2026 | Evaluation | S |
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES FLR20IU26.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR20IU26.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR20IU26 there.
WATERFRONT PARK PHASE 2, Palm Coast, Florida: Coverage under a general permit FLR20IU26, held by American Civil Construction Inc; Construction stormwater; Effective; issued November 27, 2025, term to November 26, 2030, by Florida Department of Environmental Protection.
- April 17, 2026: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- April 17, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 12,131 were issued before FLR20IU26. American Civil Construction Inc holds 5 permits in Florida.
Other permits held by American Civil Construction Inc
- RACE TRACK GROUP MULTI-FAMILY, Saint Johns: FLR20FV49, issued 2022-11-07
- LIGHTHOUSE PLAZA, Saint Augustine: FLR20GE67, issued 2023-04-10
- 4 MILE MULTIFAMILY - ACCI, Saint Augustine: FLR20HW58, issued 2025-01-24
- CROSS CREEK ON SITE, Green Cove Springs: FLR20IX45, issued 2026-01-19
Coverages issued nearest FLR20IU26
- 2025-11-27: 3 SONS RANCH, Parrish: FLR20IU21, held by Peak Power Services, Inc.
- 2025-11-27: BOURNESIDE PHASE 2, Sarasota: FLR20IU22, held by Ryangolf Corporation
- 2025-11-27: ISLAND WATER ASSOCIATION, Sanibel: FLR20IU23, held by Lee County Electric Co-Op, Inc.
- 2025-11-27: KINGS CREEK PHASE 2, Jacksonville: FLR20IU24, held by Petticoat Schmitt Civil Contractors
- 2025-11-27: LONGWATER, Naples: FLR20IU25, held by Forestar (USA) Real Estate Group Inc.
- 2025-11-27: RIVERGRASS, Naples: FLR20IU46, held by Taylor Morrison of Florida Inc
- 2025-11-28: BRIGHTON PARK, Hudson: FLR10YC16, held by DR Horton, Inc.
- 2025-11-28: THE GODDARD SCHOOL - OAKLEY BLVD, Wesley Chapel: FLR10YC42, held by Oakley Center, LLC
- 2025-11-28: SAILS OF TRELAGO, Maitland: FLR20IU27, held by JMHC, Inc.
- 2025-11-28: TRAIL RIDGE ESTATES, Middleburg: FLR20IU28, held by K.T. Carter Contracting, Inc.
WATERFRONT PARK PHASE 2 among its neighbors
14 discharge permits are in the Pellicer Creek-Big Mulberry Branch Frontal subwatershed (HUC 030802010304); FLR20IU26 is one.
Other permits in the Pellicer Creek-Big Mulberry Branch Frontal subwatershed (HUC 030802010304)
- BEACH PARK VILLAGE, Flagler Beach: FLR10VZ62, minor, term to 2028-06-04
- BOSTON WHALER INC FLAGLER FACILITY, Flagler Beach: FLR05J364, minor, term to 2030-06-28
- DUNES CDD - RO CONCENTRATE, Palm Coast: FL0355259, minor, term to 2025-02-28
- DUNES CDD RECLAIMED WM, Palm Coast: FLR20HF27, minor, term to 2029-05-05
- FLAGLER COUNTY, Bunnell: FLR04E163, minor, term to 2030-08-31
- LIGHTHOUSE HARBOR PHASE 1A - SEAWALL, Flagler Beach: FLR20IF93, minor, term to 2030-05-15
- MARINELAND DOLPHIN ADVENTURE, Saint Augustine: FL0526533, minor, term to 2022-10-11
- OASIS AT HAMMOCK DUNES, Palm Coast: FLR10YA08, minor, term to 2030-10-18
- PALM COAST WTP RO #3, Palm Coast: FL0454451, minor, term to 2022-01-10
- RESERVE EAST, Flagler Beach: FLR10XO87, minor, term to 2030-04-02
Nearby on the register
- Discharge permits in Palm Coast
- Every permit record in Palm Coast, A to Z
- Discharge permits in Florida
- Every permit record in Florida, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The WATERFRONT PARK PHASE 2 storm water construction permit, held by American Civil Construction Inc in Palm Coast, Florida, is one of 23 such permits on EPA's NPDES register for that city, this one included. Among the 23 Palm Coast storm water construction permits, 0.0% have a violation on file, and the permit itself records no pollutants under a numeric limit and no effluent exceedances. It also sits among 14 NPDES permits in the Pellicer Creek-Big Mulberry Branch Frontal subwatershed, this one included, and 13.0% of the Palm Coast storm water construction permits were issued earlier than it.