NPDES FLR20IW47 · Clean Water Act
BAKER COURT STORMWATER AND PAVING, Panama City, FL: NPDES FLR20IW47 discharge permit, effluent exceedances, inspections, penalties
BAKER COURT STORMWATER AND PAVING, Panama City, Florida: General permit coverage FLR20IW47, held by ECSC, LLC; Construction stormwater; Effective; issued January 9, 2026, term to January 8, 2031, by Florida Department of Environmental Protection.
- January 14, 2026: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
- January 14, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 12,504 were issued before FLR20IW47. ECSC, LLC holds 10 permits in Florida.
Other permits held by ECSC, LLC
- LAKE CITY AIR TANKER BASE, Lake City: FLR10UR83, issued 2021-10-23
- ALEXANDRAS PARK SUBDIVISION, Panama City: FLR20HH61, issued 2024-06-10
- US-331 N UTILITY EXPANSION, Freeport: FLR20HQ49, issued 2024-10-24
- BRISTOL SEWER IMPROVEMENTS, Bristol: FLR20IG93, issued 2025-05-30
- US 90 MARIANNA WATERLINE PROJECT, Marianna: FLR20IU85, issued 2025-12-11
- PROJECT GATEWAT, Bonifay: FLR20IZ38, issued 2026-02-14
- WYNN STREET PARK, Marianna: FLR20JD69, issued 2026-04-10
- GREENBELT GRAVITY SEWER, Niceville: FLR20JI83, issued 2026-06-18
- AZALEA PARK AND CASWELL CIRCLE, Mary Esther: FLR20JN55, issued 2026-08-24
Coverages issued nearest FLR20IW47
- 2026-01-09: ACKER RESIDENCE, Fellsmere: FLR10YD96, held by Atlantic Building Development LLC
- 2026-01-09: THE RETREAT AT PLANTATION WALK, Plantation: FLR10YD98, held by WO-PLANTATION MF LLC
- 2026-01-09: 211 PALM BEACH-TREASURE COAST, Lantana: FLR10YD99, held by DC CONSTRUCTION ASSOCIATES, INC
- 2026-01-09: POOSER ROAD PAVING PROJECT, Marianna: FLR10YE01, held by Extreme Land Restoration, LLC
- 2026-01-09: NEUMANN FAMILY, Vero Beach: FLR10YE02, held by Neumann Family
- 2026-01-09: WATERSOUND CIRCULATION ROAD, Inlet Beach: FLR20IW48, held by Total Earth Services
- 2026-01-09: PROJECT 12604 HENDRICKS ISLE SMALL WM REPLACEMENT, Fort Lauderdale: FLR20IW49, held by Murphy Pipeline Contractors
- 2026-01-09: CAPE CORAL NORTH WTF EW, Cape Coral: FLR20IW50, held by City of Cape Coral, Reverse Osmosis Water Treatment Plant
- 2026-01-09: AVALON LAKE TOWNHOMES, Orlando: FLR20IW52, held by Blue Ox Enterprises, LLC.
- 2026-01-09: LAKE NONA INDUSTRIAL, Orlando: FLR20IW53, held by J. Raymond Construction Corp.
BAKER COURT STORMWATER AND PAVING among its neighbors
156 discharge permits are in the Mill Bayou-Watsons Bayou Frontal subwatershed (HUC 031401010901); FLR20IW47 is one.
Other permits in the Mill Bayou-Watsons Bayou Frontal subwatershed (HUC 031401010901)
- 1211 LINDENWOOD DR, Panama City: FLG073355, minor, term to 2027-03-17
- 1600 LINDENWOOD, Panama City: FLG073460, minor, term to 2027-08-18
- 225 BALDWIN ROAD, Panama City: FLR10WJ00, minor, term to 2028-11-02
- 23RDS ST., Panama City: FLR10VP25, minor, term to 2027-12-03
- ACMT INC., Lynn Haven: FLRNEF731, minor, term to 2026-05-05
- AIRFIELD MARKINGS/RUBBER REMOVAL-003, Panama City: FLR10YK20, minor, term to 2031-04-11
- ALPHA DEWATERING 3101 W 23RD ST VACANT LOT, Panama City: FLG074113, minor, term to 2029-07-24
- AMI AIRPORT DRIVE, Panama City: FLR10WR59, minor, term to 2029-03-22
- AREA D-15, Panama City: FLR20IN47, minor, term to 2030-08-27
- AUTOZONE, Panama City: FLR10XW17, minor, term to 2030-08-06
What stands out
- Its term runs 4 years and 364 days, January 9, 2026 to January 8, 2031.
- Its newest dated event on file is single-event violation and inspection on January 14, 2026, 244 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 1 single-event violation, 1 inspection.
- EPA's file dates 2 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BAKER COURT STORMWATER AND PAVING |
|---|---|
| Permittee | ECSC, LLC |
| NPDES ID | FLR20IW47 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 9, 2026 |
| Expires | January 8, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Panama City, FL 32401 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mill Bayou-Watsons Bayou Frontal (HUC 031401010901) |
NPDES FLR20IW47: effluent limits and exceedances
BAKER COURT STORMWATER AND PAVING (NPDES FLR20IW47): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20IW47: no pollutant row on file.
NPDES FLR20IW47: inspections, violations and enforcement
NPDES FLR20IW47: 1 single-event violation
| Date | What EPA recorded | Agency |
|---|---|---|
| January 14, 2026 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
NPDES FLR20IW47: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| January 14, 2026 | Evaluation | S |
NPDES FLR20IW47 (BAKER COURT STORMWATER AND PAVING): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20IW47
NPDES FLR20IW47: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20IW47
NPDES FLR20IW47: 0 pollutant rows, 2 dated events; ICIS-NPDES download, loaded September 15, 2026.