NPDES FLR20JB59 · Clean Water Act
TUCKER BAYOU, Santa Rosa Beach, FL: NPDES FLR20JB59 discharge permit, effluent exceedances, inspections, penalties
TUCKER BAYOU, Santa Rosa Beach, Florida: General permit coverage FLR20JB59, held by Tucker Bayou Investments, LLC; Construction stormwater; Effective; issued March 13, 2026, term to March 12, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 13,356 were issued before FLR20JB59.
Coverages issued nearest FLR20JB59
- 2026-03-13: TOWN OF DAVIE GOLF COURSE, Davie: FLR20JB54, held by Lambert Bros., Inc.
- 2026-03-13: NEWPORT CORNERS PHASE 3B, New Port Richey: FLR20JB55, held by Ripa Associates LLC
- 2026-03-13: TAYLOR CREEK RESERVOIR FISH CAMP, Saint Cloud: FLR20JB56, held by J. McKinnon, Inc
- 2026-03-13: MCDONALD'S-9/2746-64 UIHLEIN-NEW STORE, Bradenton: FLR20JB57, held by Southland Construction, Inc.
- 2026-03-13: MAYFIELD AT WILDLIGHT (FKA WILDLIGHT POD 22-7), Yulee: FLR20JB58, held by Vallencourt Construction Company Inc
- 2026-03-13: TWIN VALLEY, Santa Rosa Beach: FLR20JB60, held by Twin Valley
- 2026-03-13: WAWA #5500 NAVARRE, Navarre: FLR20JB61, held by FH Unlimited Inc
- 2026-03-13: WAWA CRESTVIEW, Crestview: FLR20JB62, held by FH Unlimited Inc
- 2026-03-13: SOUTHERN GROVE, PARCEL C, Port Saint Lucie: FLR20JB63, held by MCM Builders, LLC.
- 2026-03-14: LCEC WEST CAPE SUBSTATION EXPANSION, Cape Coral: FLR10YI08, held by GCM Contracting Solutions Inc.
TUCKER BAYOU among its neighbors
16 discharge permits are in the Peach Creek subwatershed (HUC 031401011001); FLR20JB59 is one.
Other permits in the Peach Creek subwatershed (HUC 031401011001)
- 18-INCH RECLAIM WATER MAIN FROM PWWWTP TO 98 POND, Santa Rosa Beach: FLR20FP82, minor, term to 2027-08-05
- BLANKENSHIP US 98 WAREHOUSE, Santa Rosa Beach: FLR10YB08, minor, term to 2030-11-08
- FOREST VIEW WAREHOUSE, Santa Rosa Beach: FLR20GV79, minor, term to 2028-12-16
- GILMORE ROAD TOWNHOMES, Santa Rosa Beach: FLR20GT73, minor, term to 2028-11-10
- GULF INTERCOASTAL WATERWAY DRAINAGE STRUCTURE REPLACEMENT, Inlet Beach: FLR20JE15, minor, term to 2031-04-23
- JEWEL, Santa Rosa Beach: FLR20GI37, minor, term to 2028-06-02
- MMC MATERIALS GULF COAST - POINT WASHINGTON PLANT, Point Washington: FLG110444, minor, term to 2022-11-04
- NATURE WALK, Inlet Beach: FLR10TR00, minor, term to 2025-07-04
- ORIGINS PARKWAY SEGMENT 3, Inlet Beach: FLR20IS18, minor, term to 2030-10-29
- POINT WASHINGTON WASTEWATER TREATMENT PLANT, Santa Rosa Beach: FLRNEE974, minor, term to 2026-08-27
What stands out
- Its term runs 4 years and 364 days, March 13, 2026 to March 12, 2031.
- No dated event in the 365 days to October 14, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TUCKER BAYOU |
|---|---|
| Permittee | Tucker Bayou Investments, LLC |
| NPDES ID | FLR20JB59 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 13, 2026 |
| Expires | March 12, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Santa Rosa Beach, FL 32459 |
| Subwatershed | Peach Creek (HUC 031401011001) |
NPDES FLR20JB59: effluent limits and exceedances
TUCKER BAYOU (NPDES FLR20JB59): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20JB59: no pollutant row on file.
NPDES FLR20JB59: inspections, violations and enforcement
NPDES FLR20JB59 (TUCKER BAYOU): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20JB59
NPDES FLR20JB59: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20JB59
NPDES FLR20JB59: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.