NPDES FLR20JC14 · Clean Water Act
PORT OF PENSACOLA PAVING RAIL REHAB PROJECT, Pensacola, FL: NPDES FLR20JC14 discharge permit, effluent exceedances, inspections, penalties
PORT OF PENSACOLA PAVING RAIL REHAB PROJECT, Pensacola, Florida: General permit coverage FLR20JC14, held by C.W. Roberts Contracting, Inc.; Construction stormwater; Effective; issued March 21, 2026, term to March 20, 2031, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 13,460 were issued before FLR20JC14. C.W. Roberts Contracting, Inc. holds 10 permits in Florida.
Other permits held by C.W. Roberts Contracting, Inc.
- OKEECHOBEE ASPHALT AND READY MIXED CONCRETE INC, Okeechobee: FLG110836, issued 2020-08-03
- COLEMAN ASPHALT PLANT, Sumterville: FLR05J298, issued 2025-02-06
- E3U51, Chipley: FLR10UU57, issued 2021-12-02
- FDOT T3847, Santa Rosa Beach: FLR10VX81, issued 2023-05-06
- BONIFAY CHIPLEY ROAD SCOP, Bonifay: FLR10XD96, issued 2024-10-06
- FDOT T3862, Santa Rosa Beach: FLR10XD98, issued 2024-10-06
- WINDMARK CREEKSIDE PHASE 2, Port Saint Joe: FLR20EY30, issued 2021-11-14
- CR4A ROADWAY SAFETY IMPROVEMENTS, Century: FLR20IP03, issued 2025-09-15
- T3991 SR 30 (US 98), Port Saint Joe: FLR20JI96, issued 2026-06-20
Coverages issued nearest FLR20JC14
- 2026-03-21: CREST BAY, Miramar Beach: FLR10YI59, held by D.R. Horton, Inc.
- 2026-03-21: CULVER'S STONEWOOD, Lehigh Acres: FLR10YI60, held by SL Properties Lehigh Stonewood, LLC
- 2026-03-21: MACDILL AFB - KC-46A WAREHOUSE, Tampa: FLR10YI62, held by Crisdel Group, Inc.
- 2026-03-21: BRIDGE OF HOPE, Ocala: FLR10YI63, held by Marcum Enterprises LLC
- 2026-03-21: COSTCO NAPLES, Naples: FLR10YI64, held by South Florida Excavation, inc.
- 2026-03-21: OFFICE AND SELF STORAGE AT HERITAGE CORNERS, Palm Bay: FLR20JC15, held by BSG Partners, LLC
- 2026-03-21: DCPS - HOGAN-SPRING GLEN ELEMENTARY, Jacksonville: FLR20JC16, held by Batson-Cook Company
- 2026-03-21: MOVING I-4 PROJECT, Kissimmee: FLR20JC17, held by Moving I-4 Project
- 2026-03-21: OAK RIDGE RANCH POD 7, Fort Pierce: FLR20JC18, held by Meritage Homes of Florida, Inc.
- 2026-03-21: OAK RIDGE RANCH POD 8, Fort Pierce: FLR20JC19, held by Meritage Homes of Florida, Inc.
PORT OF PENSACOLA PAVING RAIL REHAB PROJECT among its neighbors
108 discharge permits are in the Graveyard Branch-Bayou Texar Frontal subwatershed (HUC 031401050401); FLR20JC14 is one. Its county: 333, 8 major; FLR20JC14 is minor permit.
Other permits in the Graveyard Branch-Bayou Texar Frontal subwatershed (HUC 031401050401)
- 10TH AVENUE SUBDIVISION, Pensacola: FLR20HW24, minor, term to 2030-01-18
- 22-003 110 ST. JOHN APARTMENTS, Pensacola: FLG073289, minor, term to 2027-01-20
- 555 G STREET, Pensacola: FLR10VB69, minor, term to 2027-03-17
- 9 LOTS ON 10TH AVENUE, Pensacola: FLR20HP73, minor, term to 2029-10-09
- 9TH AVE DRAINAGE, Pensacola: FLR20HW00, minor, term to 2030-01-17
- AAA COOPER TRANSPORTATION, Pensacola: FLR05J153, minor, term to 2029-01-21
- ADAMS HOMES, Pensacola: FLG074310, minor, term to 2030-01-29
- ADMIRAL'S ROW, Pensacola: FLG073999, minor, term to 2029-04-21
- ALLEN TURNER GENESIS, Pensacola: FLR10VM46, minor, term to 2027-10-06
- AMAZON.COM SERVICES LLC-WMB1, Pensacola: FLRNEF809, minor, term to 2027-04-02
What stands out
- Its term runs 4 years and 364 days, March 21, 2026 to March 20, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PORT OF PENSACOLA PAVING RAIL REHAB PROJECT |
|---|---|
| Permittee | C.W. Roberts Contracting, Inc. |
| NPDES ID | FLR20JC14 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 21, 2026 |
| Expires | March 20, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Pensacola, FL 32502 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Graveyard Branch-Bayou Texar Frontal (HUC 031401050401) |
NPDES FLR20JC14: effluent limits and exceedances
PORT OF PENSACOLA PAVING RAIL REHAB PROJECT (NPDES FLR20JC14): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20JC14: no pollutant row on file.
NPDES FLR20JC14: inspections, violations and enforcement
NPDES FLR20JC14 (PORT OF PENSACOLA PAVING RAIL REHAB PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20JC14
NPDES FLR20JC14: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20JC14
NPDES FLR20JC14: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.