Clean Water Act discharge permit · NPDES FLR20JC76

WATERSTONE PHASE 3, Groveland, FL: NPDES FLR20JC76 discharge permit, effluent exceedances, inspections, penalties

WATERSTONE PHASE 3, held by LT Langley, LLC, holds NPDES permit FLR20JC76. EPA’s file records it issued March 29, 2026 and expiring March 28, 2031. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for WATERSTONE PHASE 3: its NPDES ID, its permit type and status, its dates, its address in Groveland, Florida. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES FLR20JC76.

Identity

Facility as filedWATERSTONE PHASE 3
Permittee as filedLT Langley, LLC
NPDES IDFLR20JC76
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedMarch 29, 2026
Expiration dateMarch 28, 2031
Issuing agencyFlorida Department of Environmental Protection
AddressGroveland, FL 34736

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR20JC76.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES FLR20JC76.

Inspections

EPA’s inspection file holds no inspection for NPDES FLR20JC76.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES FLR20JC76.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR20JC76.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR20JC76 there.

WATERSTONE PHASE 3, Groveland, Florida: Coverage under a general permit FLR20JC76, held by LT Langley, LLC; Construction stormwater; Effective; issued March 29, 2026, term to March 28, 2031, by Florida Department of Environmental Protection.

Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 13,558 were issued before FLR20JC76. LT Langley, LLC holds 2 permits in Florida.

Other permits held by LT Langley, LLC

Coverages issued nearest FLR20JC76

Other permits in Groveland

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

WATERSTONE PHASE 3, a storm water construction permit held by LT Langley, LLC in Groveland, Florida, is one of 11 such permits in Groveland on EPA's NPDES register, this one included. Of those 11 permits, 27.3% were issued earlier than WATERSTONE PHASE 3, which was issued on March 29, 2026. Among those 11 Groveland storm water construction permits, 0.0% have a violation on file, and WATERSTONE PHASE 3 itself has no pollutants with a numeric limit and no effluent exceedances on record.