NPDES FLR20JD06 · Clean Water Act
PORT REDWING MATERIALS, Gibsonton, FL: NPDES FLR20JD06 discharge permit, effluent exceedances, inspections, penalties
PORT REDWING MATERIALS, Gibsonton, Florida: General permit coverage FLR20JD06, held by QGS DEVELOPMENT INC; Construction stormwater; Effective; issued April 2, 2026, term to April 1, 2031, by Florida Department of Environmental Protection.
- May 6, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
- May 6, 2026: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- May 6, 2026: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
- May 6, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- May 6, 2026: Evaluation (S).
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 13,596 were issued before FLR20JD06. QGS DEVELOPMENT INC holds 15 permits in Florida.
Other permits held by QGS DEVELOPMENT INC
- CRETE CARRIER DEVELOPMENT, Lakeland: FLR10YL05, issued 2026-04-27
- LAKESIDE STATION TOWNHOMES, Plant City: FLR20HZ04, issued 2025-02-23
- OASIS AT TWO RIVERS, Zephyrhills: FLR20IC99, issued 2025-04-10
- BELLEAIR COUNTRY CLUB EAST COURSE RENOVATION, Belleair: FLR20IL09, issued 2025-07-28
- RIDGEWOOD SOUTH PHASE 2, Riverview: FLR20IQ37, issued 2025-10-02
- TOWNHOMES AT REDMAN, Plant City: FLR20IR82, issued 2025-10-24
- LAKESIDE STATION SEGMENT 3, Plant City: FLR20IY54, issued 2026-02-05
- TWO RIVERS NORTHEAST MASS GRADING, Zephyrhills: FLR20JC77, issued 2026-03-29
- OAK HILL ESTATES, Spring Hill: FLR20JD61, issued 2026-04-09
- SUNSHINE VILLAGE MOBILE HOME PARK, Lakeland: FLR20JG19, issued 2026-05-11
Coverages issued nearest FLR20JD06
- 2026-04-02: ESTERO SPORTPARK, Estero: FLR20JD01, held by Suffolk Construction
- 2026-04-02: THE NEXUS AT REGENCY, Jacksonville: FLR20JD02, held by Besch Smith Civil Group, Inc.
- 2026-04-02: VANN AVE, Defuniak Springs: FLR20JD03, held by CM Contracting Trucking Inc
- 2026-04-02: AVERY CYPRESS CREEK, Fort Lauderdale: FLR20JD04, held by Avery Cypress Creek Property LP
- 2026-04-02: FORT MYERS BEACH WRF, Fort Myers Beach: FLR20JD05, held by Fort Myers Beach WRF
- 2026-04-02: LTC RANCH-POD 8C, Port Saint Lucie: FLR20JD53, held by The Tide at Wylder LLC
- 2026-04-03: WOV-T4729- SR A1A (JIMMY BUFFET MEMORIAL HWY), Melbourne Beach: FLR10YJ25, held by Webber a Ferrovial company
- 2026-04-03: WOV-T4729- SR A1A (JIMMY BUFFET MEMORIAL HWY), Vero Beach: FLR10YJ26, held by Webber a Ferrovial company
- 2026-04-03: RESIDENTIAL, Gainesville: FLR10YJ27, held by residential
- 2026-04-03: VERMEER SALES STORAGE, Saint Augustine: FLR10YJ28, held by Auld White Constructors LLC
Other permits in Gibsonton
- 11210 US HWY 41 S, Gibsonton: FLG074812, minor, term to 2031-03-08
- 7-ELEVEN GIBSONTON, Gibsonton: FLR20GU81, minor, term to 2028-12-01
- ABACUS STORAGE BIG BEND, Gibsonton: FLR20JE87, minor, term to 2031-04-24
- ADVANCED AIRFOIL COMPONENTS, Gibsonton: FLR05I299, minor, term to 2023-11-02
- AMAZON.COM SERVICES LLC - HTP2, Gibsonton: FLR05J310, minor, term to 2030-02-21
- ARDENT MILLS, LLC, Gibsonton: FLR05I968, minor, term to 2027-12-04
- BIG BEND APARTMENTS, Gibsonton: FLR20FB77, minor, term to 2026-12-24
- BIG BEND POWER STATION, Gibsonton: FLR05C544, minor, term to 2026-02-14
- BIG BEND ROAD (CR 672) AT I-75(SR 93A), Gibsonton: FLR20EZ85, minor, term to 2026-12-02
- BIG BEND ROAD COMMERCIAL, Gibsonton: FLR10VU06, minor, term to 2028-02-23
What stands out
- Its term runs 4 years and 364 days, April 2, 2026 to April 1, 2031.
- Its newest dated event on file is single-event violation and inspection on May 6, 2026, 161 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 4 single-event violations, 1 inspection.
- EPA's file dates 5 events for it, all in 2026.
- It is one of 23,564 discharge permits on the register in Florida; 15,654 of them (66%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PORT REDWING MATERIALS |
|---|---|
| Permittee | QGS DEVELOPMENT INC |
| NPDES ID | FLR20JD06 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | April 2, 2026 |
| Expires | April 1, 2031 |
| Agency | Florida Department of Environmental Protection |
| Address | Gibsonton, FL 33534 |
NPDES FLR20JD06: effluent limits and exceedances
PORT REDWING MATERIALS (NPDES FLR20JD06): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR20JD06: no pollutant row on file.
NPDES FLR20JD06: inspections, violations and enforcement
NPDES FLR20JD06: 4 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| May 6, 2026 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
| May 6, 2026 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| May 6, 2026 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
| May 6, 2026 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
NPDES FLR20JD06: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| May 6, 2026 | Evaluation | S |
NPDES FLR20JD06 (PORT REDWING MATERIALS): no formal enforcement action and informal enforcement action on file.
Watch NPDES FLR20JD06
NPDES FLR20JD06: one email when its EPA record changes — $99/month.
Permits near NPDES FLR20JD06
NPDES FLR20JD06: 0 pollutant rows, 5 dated events; ICIS-NPDES download, loaded October 14, 2026.